My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_SEPARATE PHASE HYDROCARBON INVESTIGATION UNOCAL EXTRACTION WELL PILOT STUDY 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_SEPARATE PHASE HYDROCARBON INVESTIGATION UNOCAL EXTRACTION WELL PILOT STUDY 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 6:26:46 PM
Creation date
2/13/2020 2:35:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SEPARATE PHASE HYDROCARBON INVESTIGATION UNOCAL EXTRACTION WELL PILOT STUDY 2011
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD SERVICES REQUEST <br /> [SITE INFORMATION FORM MPE/TPE Pilot Test <br /> Identification Project Type Check Appropriate Category <br /> Project#: 211403021.300.150 Dan Schriener(916)861-0400 ext. 227 PPE <br /> Station ID#: Parcel 2A Matt Tanner: (916) 384-0713 <br /> Site Address: 666 West Weber Ave <br /> Stockton, California <br /> Lab: <br /> County: San Joaquin County <br /> Project Manager. Dan Schreiner Matt Cell:916-296-1796 <br /> Requester: Matt Tanner Site Safety Concerns <br /> Client: Chevron/ConocoPhillips Dan Cell:916-475-7605 Traffic/pedestrians <br /> Client P.O.C: Rick Rittenberg/Shelby Lathrop See HASP <br /> Date of Request: 111212010 Field Date: 11115110- 11/19/10 <br /> Field Tasks General Description <br /> • 8:00 am Monday, November 15,2010 <br /> o Stantec to arrive on site <br /> o Kickoff/health&safety meeting <br /> o Begin setup of equipment <br /> o Stantec to take depth to water/product measurements <br /> o Stantec to take system parameters <br /> o Stantec to perform MPE/TPE test <br /> • 8:00 am Tuesday, November 16,2010 through completion <br /> o Stantec to take depth to water/product measurements <br /> o Resume MPE/TPE pilot test. <br /> o Equipment breakdown/removal to occur after MPUTPE test has concluded. <br /> Comments / Remarks from Field Staff <br /> Completed By: <br />
The URL can be used to link to this page
Your browser does not support the video tag.