My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_SEPARATE PHASE HYDROCARBON INVESTIGATION UNOCAL EXTRACTION WELL PILOT STUDY 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_SEPARATE PHASE HYDROCARBON INVESTIGATION UNOCAL EXTRACTION WELL PILOT STUDY 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 6:26:46 PM
Creation date
2/13/2020 2:35:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SEPARATE PHASE HYDROCARBON INVESTIGATION UNOCAL EXTRACTION WELL PILOT STUDY 2011
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> Report of Findings for the Waterfront Towers Separate Phase Hydrocarbon Investigation <br /> and Unocal Extraction Well Pilot Study <br /> Waterfront Towers Parking Lot <br /> March 4, 2011 <br /> GCT towards GWE-1 and then down to GWE-2 and eventually south toward the Mormon <br /> Slough. The GWE test results show higher sustained groundwater recovery from GWE-2 than <br /> GWE-1, which is likely because GWE-2 is located near the bottom of the GCT. Groundwater <br /> recovery rates observed in GWE-1 and GWE-2 are similar and not higher than groundwater flow <br /> rates observed in other four-inch diameter nearby wells historically tested on the L&M OU site. <br /> The projected design groundwater flow rates and pressures are as follows: <br /> • Design of pumping groundwater from GWE-1 should anticipate peak flows of at least 7.0 <br /> gpm and sustained flows of around <2.0 gpm. Head pressure against any pump installed <br /> in GWE-1 would be approximately 15 feet of water plus additional head losses from pipe <br /> and pipe components. <br /> • Design of pumping groundwater from GWE-2 should anticipate peak flows of at least 6.3 <br /> gpm and sustained flows of around <4.0 gpm. Head pressure against any pump installed <br /> in GWE-2 would be approximately 15 feet of water plus additional head losses from pipe <br /> and pipe components. <br /> • Combined groundwater recovery system and treatment system should anticipate peak <br /> groundwater flows of approximately 13.32 gpm with sustained flows of less than six gpm <br /> from GWE-1 and GWE-2 combined. Note that TPE testing (which followed pump testing) <br /> indicates that groundwater production was substantially reduced following the pump test <br /> portion of these tests. This indicates that higher flows during the pump test portion may <br /> have consisted of storage in the UOU excavation and GCT and is not representative of <br /> long term groundwater production, which may be substantially reduced. <br /> Combined groundwater treatment system should take into account total hydrocarbon <br /> loadings. <br /> Soil vapor extraction from GWE-1 and GWE-2 should be initiated because those activities may <br /> help to recover chemical mass from the UOU and maintain the cleanliness of fill material placed <br /> there by the SRDA following excavation activities. <br /> The projected design SVE flow rates and pressures are as follows: <br /> • Design of SVE from GWE-1 should anticipate peak vapor flows of around 174 scfm. <br /> Applied casing vacuum would have to be at least 1.3 in. H2O gauge vacuum pressure <br /> plus additional head losses from pipe and pipe components. <br /> • Design of SVE from GWE-2 should anticipate peak vapor flows of around 148.9 scfm. <br /> Applied casing vacuum would have to be at least 16.2 in. H2O gauge vacuum pressure <br /> plus additional head losses from pipe and pipe components. <br /> Combined SVE recovery and vapor abatement systems for GWE-1 and GWE-2 should <br /> anticipate peak flows of approximately 400 scfm and be capable of generating the 400 <br /> scfm at a minimum of 16.2 in H2O gauge vacuum pressure <br /> 4.14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.