Laserfiche WebLink
Table 1 <br /> Monitoring and Sampling Plan <br /> South Shore Parcels-Parcel 2A and Adjacent Areas <br /> West Weber Avenue and North Lincoln Street <br /> Stockton,California <br /> MRP No.R5-2004-0820* Work Completed <br /> 4th Quarter 2009 1st Quarter 2010 2nd Quarter 2010 3rd Quarter 2010 During 3rd Quarter <br /> 2010 <br /> Monitor Monitor Monitor Monitor Monitor <br /> WellI.D. DTW Sample DTW Sample DTW Sample DTW I SarppI!JI DT\/v Sample <br /> Explanations(continued): <br /> MS= Mormon Slough <br /> QCDUP=Duplicate sample <br /> QTR=Quarter <br /> SPH =Separate-Phase Hydrocarbons <br /> -= Not applicable <br /> Dark shading indicates wells that were not monitored and/or sampled. <br /> Notes: <br /> *MRP No. R5-2004-0820 replaces MRP No. R5-2003-0802, and was implemented during the second quarter 2004. <br /> Well 3MW-1 was destroyed and replacement well 3MW-1 R was installed by Clayton Group Services during the second quarter 2003. <br /> Wells MW-36, MW-38 and MW-39 were installed on April 10, 2003. <br /> Well MW-37 was installed on May 9,2003. <br /> Wells DPE-8 through DPE-12 were installed during the third quarter 2003. <br /> Wells MW-40 through MW-46 installed by SECOR during the second quarter 2004. <br /> Wells MW-36 and 3MW-1 R were destroyed by Clayton on April 5, 2004. <br /> Wells MW-47 through MW-55 were installed by SECOR during the second quarter 2005. <br /> Well DPE-13 was installed during the first quarter 2006. <br /> Well MW-34 was buried and damaged due to recent construction activities by the City of Stockton during 2Q06 <br /> Well MW-6 was destroyed by Golden State Environmental in June 2007. <br /> Well MW-06R was reinstalled in the vicinity of former MW-6 by Wallace Kuhl in November 2008. <br /> Well 2BMW-1 was abandoned by Wallace Kuhl during the second quarter 2010. <br /> I:\Tidewater\TW Stockton(Parcel 2A-0415)\Tables\QMR Tables\2010\4Q10\4Q10-Parcel2A Monitoring and Sampling Plan(Table 1 and Table 2)SPH vs.time with DPE wells.xls Page 3 of 3 <br />