My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_THIRD QUARTER 2011 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_THIRD QUARTER 2011 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 9:59:16 PM
Creation date
2/13/2020 2:51:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
THIRD QUARTER 2011 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TPE SYSTEM FIELD SERVICES REQUEST <br /> SITE fNFORMATION FORM PArde14A4PF-System,0&M <br /> Identification Proiect Type <br /> Project#: 211602193.400.400 ❑X Operation &Maintenance <br /> Station ID#: Tidewater Stockton(Parcel 2A) ❑X Sampling <br /> Site Address: 666 West Weber Avenue 1st Time Visit <br /> Stockton,California Quarterly <br /> Lab: K/ffAnalytical 1st 2nd 3rd 4th <br /> County: San Joaquin Z Monthly Site Safety Concerns <br /> Project Manager: Dan Schreiner E] Semi-Monthly Please Read HASP and <br /> conduct a tailgate meeting <br /> Requester: Matt Tanner ❑ Weekly conduct a taypte meeting <br /> prior to beginning work. <br /> Client: Chevron/ConocoPhillips � One Time Event <br /> Client P.O.C: R/ckRittenberg,Shelby Lathrop E] Other: <br /> Date of Request: Field Date: <br /> Field Tasks General Description <br /> 1) Record natural gas meter reading on a monthly basis <br /> 2) Sample TPE vapor system according to the following schedule. <br /> Wells Influent :EfFlti nt <br /> TPHg/BTEX/MtBE(EPA 8260B) M I M <br /> FID W M I M <br /> 3) Sample water system according to the following schedule <br /> GW-INF MID-1 MID-2 MID-3 MID-4 MID-5 GW-EF <br /> pH(meter) M <br /> TPH(EPA 418.1) M <br /> TPHd/TPHo(EPA 8015M) M M M M M M M <br /> TPHg/BTEX/MTBE/DIPE/ETBE/TAME/TBA M M M M M M M <br /> EPA 8260 <br /> Cadmium/Chromium/Copper/Lead/Nickel/Zinc <br /> BI-A <br /> (EPA 200 Series) <br /> Total Toxic Organics (EPA 624 and 625) BI-A <br /> BI-A=Bi-Annual; M=MonthlyQ=Quarterly W=Weekly <br /> 41 Submit Field Data Sheet to Matt Tanner monthly. <br /> 5)Change chart in LEL chart recorder monthly. Return paper to Matt Tanner monthly. <br /> 6)Operate&maintain TPE system weekly. <br /> 7)Call into office to discuss site and operating needs. Brian Goss 916-384-0779 or Erik Lawson 916-384-0761 <br /> Completed By: >, ,��, Date: .�7/t s�Ci <br />
The URL can be used to link to this page
Your browser does not support the video tag.