My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_THIRD QUARTER 2011 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_THIRD QUARTER 2011 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 9:59:16 PM
Creation date
2/13/2020 2:51:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
THIRD QUARTER 2011 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Number: TPE System Parcel 2A <br /> 211402841.300.400 Well Data Sheet 666 West Weber Avenue <br /> Mani old System a er u e Casing o o , Calffornia <br /> i -LValveVacuum (in Vacuum (in Flow Rate flow Vacuum Vacuum Slurp Tube <br /> Well FID (ppmv) Po ) (scfm) (GPM) (inHg) (inHg) Depth (ft) Comments <br /> Initial: Record parameters for all wells and vacuum free product from all wells <br /> DPE-1 <br /> DPE-2 <br /> DPE-3 <br /> DPE-4 <br /> DPE-5 <br /> DPE-6 /ac 'ic <br /> DPE-7 <br /> DPE-8 <br /> DPE-9 <br /> DPE-10 <br /> DPE-11 <br /> DPE-12 <br /> DPE-13 p <br /> 2AMW-14 <br /> MW-40 G D c lv r4 <br /> Final: Optimize system- for maximum FID and SPH removal and% record all open well parameters <br /> D E-1 <br /> DPE-2 <br /> D E-3 <br /> DPE-4 <br /> DPE-5 <br /> DPE-6 <br /> DPE-7 <br /> DPE-8 <br /> DPE-9 <br /> DPE-10 <br /> DPE-11 <br /> DPE-12 <br /> DPE-13 <br /> 2AMW-14 <br /> MW-40 <br /> Completed By:,,,,--,, Date: ��,� <br />
The URL can be used to link to this page
Your browser does not support the video tag.