Laserfiche WebLink
Stantec <br /> L & M OPERABLE UNIT-THIRD QUARTER 2011 SITE STATUS, REMEDIAL SUMMARY, <br /> AND GROUNDWATER MONITORING REPORT <br /> October 28, 2011 <br /> 3.0 Status of Remediation Activities <br /> 3.1 DUAL PHASE EXTRACTION SYSTEM <br /> 3.1.1 Dual Phase Extraction Systems Summary <br /> The dual phase extraction (DPE) system consists of groundwater extraction (GWE) and soil <br /> vapor extraction (SVE) and utilizes of wells DPE-1 through DPE-13, and 2AMW-14, a <br /> 100-gallon liquid/vapor separator, and a Solleco 400- standard cubic feet per minute (scfm) <br /> thermal oxidizer with a Travaini TRO 400s 25-hp liquid ring pump. <br /> From March 18, 2004 through April 4, 2004, the system was operated to conduct source tests <br /> for the San Joaquin Valley Air Pollution Control District (SJVAPCD) and the collection of effluent <br /> Polycyclic Aromatic Hydrocarbon (PAH) sampling under Authority to Construct (ATC) number <br /> N-4878-1-1. On July 7, 2004, the SJVAPCD issued a new ATC number (N-4878-1-2) for <br /> permanent operation of the system. The system was re-started on August 2 and 3, 2004 for <br /> collection of PAH samples. Following PAH sample collection; the system was shut down until <br /> Site excavation activities were completed. Continuous operation of the DPE system was <br /> re-commenced on December 14, 2004. On June 22, 2005, SJVAPCD issued a Permit to <br /> Operate (PTO) number (N-4878). On September 8, 2006, SJVAPCD issued a PTO number <br /> (N-4878-1-3) that excluded further sampling of PAH. <br /> 3.1.2 Dual Phase Extraction System Operational and Analytical Data — 3Q11 <br /> During 3Q11 (June 16, 2011 through September 15, 2011) the DPE system was approximately <br /> 86% operational (78 out of 91 days). The system was shut down on July 15, 2011 to <br /> accommodate the third quarter monitoring and sampling event. The system was restarted on <br /> July 20, 2011 and operated without incident the remainder of the quarter. A critical device <br /> check was performed on the system on August 4, 2011. Sampling and analysis for TPHd via <br /> EPA Method TO-17 was initiated on August 11, 2011 for the SVE portion of the DPE system. <br /> Compliance vapor and groundwater samples were collected on July 13, August 11, and <br /> September 15, 2011. During 3Q11, the DPE system (GWE and SVE combined) removed <br /> approximately 11.9 lbs (2.0 gallons) of TPHg, 12.7 lbs (1.8 gallons) of TPHd, 3.9 lbs <br /> (0.5 gallons) of TPHo, 0.14 lbs (0.02 gallons) of MtBE, and 0.1 lbs (0.01 gallons) of benzene <br /> from water and soil vapor. No measurable amount of TBA was removed during 3Q11. <br /> Historically the DPE system (GWE and SVE combined) has removed approximately 18,016 lbs <br /> (2,954 gallons) of TPHg, 9,539 lbs (1,328 gallons) of TPHd, 5,135 lbs (674 gallons) of TPHo, <br /> 11.92 lbs (1.61 gallons) of benzene, 3.43 lbs (0.55 gallons) of MtBE, and 0.52 lbs (0.08 gallons) <br /> of TBA from water and soil vapor to date. Since system start-up groundwater extraction has <br /> removed and treated approximately 6,649,500 gallons of water. <br /> I:\Tidewater\TW Stockton(P2A)\QMRs\201 1\3Q1 1\3Q11 QSSR QRSR QMR Stockton_FINAL.doc 3.1 <br />