Laserfiche WebLink
Stantec <br /> L & M OPERABLE UNIT-THIRD QUARTER 2011 SITE STATUS, REMEDIAL SUMMARY, <br /> AND GROUNDWATER MONITORING REPORT <br /> October 28, 2011 <br /> 7.0 Limitations <br /> This report presents our understanding of existing conditions at the subject Site. The <br /> conclusions contained herein are based on the analytical results, and professional judgment in <br /> accordance with current standards of professional practice; no other warranty is expressed or <br /> implied. Stantec assumes no responsibility for exploratory borings or data provided or reported <br /> by other consultants or contractors. Wallace-Kuhl monitors and samples wells MW-3, MW-5, <br /> MW-6 through 8, MW-11, MW-37 through 39, 2BMW-1, and 2AMW-15 on behalf of the city of <br /> Stockton and provides preliminary data for use in this report. Stantec assumes that the finalized <br /> data gathered for the UOU and MOU during 3Q11 will be submitted by Wallace-Kuhl under <br /> separate cover. <br /> I:\Tidewater\TW Stockton(P2A)\QMRs\201 1\3Q1 1\3Q11 QSSR QRSR QMR Stockton_FINAL.doc 7.1 <br />