Stantec <br /> L & M OPERABLE UNIT- FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, <br /> REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT <br /> Introduction <br /> January 31, 2011 <br /> apartment buildings in the Delta View Apartment complex. Final results and a work plan for <br /> additional pipeline removal in the Waterfront Towers parking lot are presented in SECOR's <br /> Pipeline Removal, Abandonment, Soil Excavation, On-Site Horizontal SVE Well Installation, and <br /> Horizontal SVE Well Installation Beneath Delta View Apartments Report and Work Plan for <br /> Pipeline Removal, Abandonment, and Soil Excavation in Waterfront Towers Parking Lot dated <br /> February 10, 2005. <br /> Additional assessment activities were conducted at the Site in May 2004 to investigate the <br /> vertical extent of petroleum hydrocarbons in the vicinity of the Site. SECOR advanced one <br /> deep soil boring (SB-7) to a depth of approximately 140 ft bgs in the vicinity of well MW-17, <br /> installed shallow off-site well MW-45, and installed deep off-site wells MW-40 through MW-44 <br /> and MW-46. Three groundwater samples were collected at 117, 128, and 139 ft bgs using a <br /> HydropunchTIM sampling device in soil boring SB-7. Results are summarized in SECOR's report <br /> entitled Additional Assessment Report and Work Plan for Additional Deep Groundwater Zone <br /> Assessment dated July 29, 2004. <br /> From March 21 through April 10, 2005, additional assessment activities were conducted at the <br /> Site. Seven B-zone groundwater monitoring wells (MW-47 through MW-53), one groundwater <br /> monitoring well intended to be a C-zone well (MW-54), and one groundwater monitoring well <br /> intended to be a D-zone well (MW-55) were installed, and three Geoprobe soil borings (GP-1 <br /> through GP-3) were advanced. Results are summarized in SECOR's report entitled Additional <br /> Deep Groundwater Zone Assessment Report, dated May 25, 2005. <br /> From July 13 through July 15, 2005, 16 soil vapor points were installed to monitor soil gas <br /> concentrations over time and determine radius of influence of the previously installed SVE <br /> system. On July 19 and 20, 2005 baseline soil vapor samples were collected from 12 of the 16 <br /> vapor points. The SVE system was initiated on August 18, 2005 for select wells. The complete <br /> scope of work and results of the soil vapor well installations, SVE start-up, and soil vapor <br /> sampling were summarized in SECOR's report entitled Soil Vapor Well Installation and Soil <br /> Vapor Extraction Start-Up Report, dated November 30, 2005. <br /> From March 21 through March 23, 2006, additional assessment activities were conducted at the <br /> Site in accordance with the Work Plan submitted January 4, 2006 entitled Work Plan for <br /> Additional DPE Feasibility Testing and Expanded Remedial System Installation. Seven <br /> piezometers and one DPE well were advanced for the purpose of conducting radius-of-influence <br /> analysis on several existing DPE wells. <br /> Pilot testing on DPE wells was conducted between April 4 and April 26, 2006. A temporary <br /> above ground extraction line was installed on DPE-13 as part of these pilot testing activities. <br /> Results from the pilot testing were used to design and implement remedial system upgrades to <br /> better optimize contaminant mass removal from soil and groundwater beneath the L&M OU. <br /> Remedial system upgrade installation activities were completed during the second quarter 2007. <br /> I:\Tidewater\TW Stockton(Parcel 2A-0415)\Reports\QMR\2010\4010-Annual\4Q10 and Annual OSSRQRSRQMR Stockton_FINAL.doc 1.7 <br />