Laserfiche WebLink
Page I of 3 <br /> Mike Infurna [EH] <br /> From: Craig_Tiballi@URSCorp.com <br /> Sent: Friday, January 16, 2009 1:22 PM <br /> To: Mike Infurna [EH] <br /> Subject: Re: FW: Dow Tracy Site <br /> Hi Mike, <br /> I wanted to update you on the status of the well destruction work at the Dow site in Tracy, CA. I <br /> received approval from the client yesterday and have scheduled the drillers (RSI Drilling) for 3 <br /> days of overdrilling/well destruction work for the 2nd week of February: starting on wednesday <br /> 2/11 to friday 2/13. Hopefully this schedule will be ok with your schedule. I am also finishing up <br /> the well application permit and having the drillers fill in their sections as well. I will try and get the <br /> permit and check to you by the end of next week. Thanks for all your help and have a good <br /> weekend. <br /> Regards, <br /> Craig Tiballi <br /> URS Corporation <br /> -----"Mike Infurna [EH]" <MInfurna@sjcehd.com> wrote: ----- <br /> To: <Craig_Tiballi@URSCorp.com> <br /> From: "Mike Infurna [EH]" <MInfurna@sjcehd.com> <br /> Date: 12/03/2008 08:41AM <br /> Subject: FW: Dow Tracy Site <br /> Craig, <br /> I'll be your contact with this site. <br /> I understand you plan on destroying the wells by over-boring. Attached <br /> is the two page permit application forms. Print out and complete all <br /> pertinent info on page one. The driller typically completes page two. <br /> Return each page to me with a check for $60. <br /> You can fill out and sign page one if you like, but if you do, the C-57 <br /> contractor (driller) must authorize you signature with their own letter or <br /> he/she can use the bottom of page two for this. Or you can have your <br /> driller fill out page one of the permit application and send it to me. (I <br /> only need page one and the check if the driller fills out the application). <br /> without a work plan I'll need to know the methods and materials <br /> proposed. be sure all the areas concerning the method and materials <br /> you plan to use and the depths you plan to drill to are on page one. <br /> Typical MW destructions by over bore use a larger auger, drill to TD + <br /> afoot of original installation, and tremie backfill neat cement grout to <br /> 1/20/2009 <br />