Laserfiche WebLink
SECTIONTHREE Scope of work <br /> 3.1.2 Quality Assurance/Quality Control Samples <br /> Quality Assurance/Quality Control (QA/QC) procedures will include the collection and analysis <br /> of field duplicates at 10 percent of all environmental samples. No other QA/QC samples will be <br /> collected. <br /> 3.1.3 Decontamination Procedures <br /> All down-hole equipment will be decontaminated between use. Tubing will be dedicated to each <br /> sample so decontamination will not be necessary. <br /> 3.2 INVESTIGATION REPORT <br /> Following completion of the soil gas survey, a report will be issued outlining the findings of the <br /> investigation. <br /> IMSVADoMCeloteASoil Gas WMSofl Gas WP A. 3-3 <br />