Laserfiche WebLink
- 3 - <br /> E. Soil Sampling <br /> Cuttings disposal method <br /> Analyses to be run and methods <br /> Sample collection and preservation method <br /> Intervals at which soil samples are to be collected <br /> Number of soil samples to be analyzed and rationale <br /> Location of soil samples and rationale <br /> QA/QC procedures <br /> F. Well Sampling <br /> Minimum time after development before sampling (48 hours) <br /> Well purging method and amount of purge water <br /> Sample collection and preservation method <br /> QA/QC procedures <br /> G. Water Level Measurement <br /> Elevation reference point at each monitoring well shall be within 0.01 foot. Ground surface <br /> elevation at each monitoring well shall be within 0.1 foot. Method and time of water level <br /> measurement shall be specified. <br /> IV. QA/QC PROCEDURES <br /> Specify number of field blanks and duplicates. <br /> V. TIME SCHEDULE FOR PROPOSED WORK <br /> The work plan shall include a time schedule for implementation of work. <br />