My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2022 4:16:57 PM
Creation date
2/18/2020 10:05:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN -PAGE I (One form per facility) <br /> FTYPEOF ON 21 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) — — <br /> BUSINESS NAME(Same as FACILITY NAME) Rot <br /> 1 _ 76 <br /> BUSINESS SITE ADDRESS Ro3. CITY R04. <br /> t4l9 T /IPl metre in 3 0-Wil <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY -- <br /> R10. 0 -: . .. R30. <br /> Rll. R21. R31. <br /> R12. R22. MAY 2 R32. <br /> R13. R23. IVI R33. <br /> RI4. R24. '�- _�.4ti'lY R34. <br /> EN'. <br /> RIs. R25. HEALTH CL R-',R T tAEi`1 T R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Roo. TITLE Rso. <br /> NAME R41, TITLE R51. <br /> NAME R42. TITLE R52. <br /> NAME R43. TITLE R53. <br /> V. MONITORING INDICATORS <br /> F MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: Rho. <br /> ❑Additional system testing or data collection J9 Inspection by qualified persons ❑Recalibration of equipment <br /> Other: <br /> UST Response Plan(3/2008)-113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.