My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0081524 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACAMPO
>
12080
>
2600 - Land Use Program
>
SR0081524 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2020 11:57:57 AM
Creation date
2/18/2020 10:40:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0081524
PE
2602
FACILITY_NAME
JEREMY WINE CO
STREET_NUMBER
12080
Direction
E
STREET_NAME
ACAMPO
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01727012
ENTERED_DATE
12/13/2019 12:00:00 AM
SITE_LOCATION
12080 E ACAMPO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> 1.0 SOIL SUITABILITY STUDY........................................................................................ 3 <br /> 1.1 Introduction and Development....................................................................... 3 <br /> 1.1.1 Site Description ................................................................................. 3 <br /> 1.1.2 Proposed Development....................................................................... 4 <br /> 1.1.3 Site Vicinity....................................................................................... 4 <br /> 1.1.4 Site Map............................................................................................ 4 <br /> 1.2 Present and Past Uses of the Site................................................................... 4 <br /> 1.2.1 Past and Present Site Use................................................................... 4 <br /> 1.3 Existing and Proposed Septic Tank Usage....................................................... 5 <br /> 1.3.1 Existing On-Site Septic Tank Usage ..................................................... 5 <br /> 1.3.2 Site Specific Permit History................................................................. 5 <br /> 1.3.3 Discussion of On-Site Septic Tank Repair............................................. 5 <br /> 1.3.4 Existing Septic Tank Usage in the Vicinity............................................. 6 <br /> 1.3.5 Septic Permit History in the Vicinity..................................................... 6 <br /> 1.3.6 Septic Repair Permit History in the Vicinity........................................... 6 <br /> 1.3.7 Expected On-Site Maximum Septic Tank Usage .................................... 6 <br /> 1.4 Groundwater Information.............................................................................. 7 <br /> 1.4.1 Groundwater Depth and Gradient........................................................ 7 <br /> 1.4.2 Potential Groundwater Contamination Issues........................................ 7 <br /> 1.4.3 Water Sample Location....................................................................... 8 <br /> 1.4.4 Groundwater Sample Analysis............................................................. 8 <br /> 1.4.5 Groundwater Sample Handling............................................................ 8 <br /> 1.5 Soil Profile and Geologic Information.............................................................. 8 <br /> 1.5.1 Soil Boring Locations.......................................................................... 9 <br /> 1.5.2 Soil Boring Dimensions....................................................................... 9 <br /> 1.5.3 Soil Lithology Observed...................................................................... 9 <br /> 1.5.4 Discussion of Soil Lithology................................................................10 <br /> 1.6 Percolation Test Information.........................................................................11 <br /> 1.6.1 Percolation Test Locations .................................................................11 <br /> 1.6.2 Number of Percolation Tests..............................................................11 <br /> 1.6.3 Boring Preparation and Presaturation..................................................11 <br /> 1.6.4 Condition of Borings after Presaturation..............................................11 <br /> 1.6.5 Percolation Test Procedure ................................................................11 <br /> 1.6.6 Percolation Test Forms and Results....................................................12 <br /> 1.6.7 Discussion of Percolation Test Results.................................................12 <br /> 1.6.8 Discussion of Septic System Sizing .....................................................12 <br /> 2.0 NITRATE LOADING STUDY......................................................................................13 <br /> 2.1 Chemical and Physical Properties of Soil ........................................................13 <br /> 2.1.1 Chemical and Physical Soil Properties .................................................13 <br /> 2.1.2 Mass Transport Soil Properties...........................................................14 <br /> 2.2 Groundwater Analysis ..................................................................................14 <br /> 2.2.1 Regional Groundwater.......................................................................14 <br /> 2.2.2 Potential Ground Water Contamination Issues.....................................14 <br /> 2.2.3 Current and Future On-Site Ground Water Uses...................................14 <br /> 2.3 Sources and Impact of Nitrate to Groundwater...............................................14 <br /> 2.3.1 Current Off-Site Sources of Nitrate.....................................................14 <br /> 2.3.2 Contribution of Rainfall......................................................................15 <br /> Responsive■ Resourceful ■ Reliable <br />
The URL can be used to link to this page
Your browser does not support the video tag.