My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
INSTALL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2020 2:58:30 PM
Creation date
2/18/2020 1:47:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit_ The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR <br /> n <br /> Facility Name L)o ,e ' (%4 r-, l z, <br /> Facility Address �{ 19 . -)G' <br /> A_ Describe the frequency of performing the monitoring: <br /> Tank `b,tN�xot&s m",V" <br /> J <br /> Piping CLk () ,.s er-- "'iVr ,w, <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank `TL S - 3<0 <br /> Pipin TL5 34�D <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> D. List the name(s) and dile(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment <br /> ('^ pct- - �,. <br /> Lill 4, "J <br /> E. Reporting format for monitoring: <br /> l <br /> Tankrrrvv�l <br /> Pipin� <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every L'months: Al <br /> 0 �/ 0"-1 J-,,na � a1 <br /> G. Describe the training necessary for the operation of UST system, inclucing piping, <br /> and the monitoring equipment: �i-; a i I , �� o I J rJ �~ <br /> 'ILS _�`�) a N,� w� � o'� rlr 1~,✓ a o-,,�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.