Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: REFUEL CIRCLE K I Date of Testing: 5-21-18 <br /> Facility Address: 419 S MAIN ST. MANTECA,CA 95366 <br /> Facility Contact: Phone: <br /> Date Local Agency Was Notified of Testing:4/19/12 <br /> Name of Local Agency Inspector(if present during testing): AARON <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: AFFORDA TEST 416 2"d Street Galt,CA 95632 (209)744-0112 Fax:(209)744-0116 <br /> Technician Conducting Test: ❑Ed Stearns ❑ Zane A.Nimmo ® David A.Winkler ❑ Felix G.Ramirez <br /> 8883080-UT 8883064-UT 8883059-UT 8883072-UT <br /> Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ®Hydrostatic ❑Vacuum ❑ Other <br /> Test Equipment Used: TAPE MEASURE, H2O Equipment Resolution: 1/16" <br /> Identify Spill Bucket(By Tank 1 87 2 87 RETEST 3 91 4 DIESEL <br /> Number, Stored Product, etc. <br /> ®Direct Bury X Direct Bury ®Direct Bury ®Direct Bury <br /> Bucket Installation Type: El Contained in El Contained in <br /> El Contained in Sump El Contained in Sump Sump Sum <br /> Bucket Diameter: 11 11 11 11 <br /> Bucket Depth: 15 15 15 15 1/2 <br /> Wait time between applying <br /> vacuum/water and start of test: <br /> Test Start Time(Ti): 0945 11 0945 0945 <br /> Initial Reading(Ri): 13 3/4 14 14- 14 <br /> Test End Time(TF): 1045 12 1045 1045 <br /> Final Reading(RF): 10 14 14- 14 <br /> Test Duration(TF—TI): HR HR HR HR <br /> Change in Reading(RF-R,): 0 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass ® Fail X Pass ❑Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 87 FAILED REPLACED DRAIN AND RETESTED THEM PASSED <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature W Date:5-21-18 <br /> 1 State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />