My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_2010 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 2:01:21 PM
Creation date
2/19/2020 10:04:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2018
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer a Industry Standard Professional Engineer <br /> ❑Other(Spec ij�) <br /> Test Method Used: X Pressure ❑Vacuum Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx.50' Approx.50' Approx.50' <br /> Product Stored: Super 91 Regular 87 Diesel <br /> Method and location of Test hose at Test hose at Test hose at <br /> piping-run isolation: UDC#1&2 UDC#1&2 UDC#1&2 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes <br /> pressure and starting test: <br /> Test Start Time: 9:25 8:45 8:55 <br /> Initial Reading(Ri): 3 Psi 3 Psi 3 Psi <br /> Test End Time: 10:25 9:45 9:55 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-R!): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Replaced test boot on Super 91 Secondary Pipe at STP Piping Sump#1,prior to testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.