Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer a Industry Standard Professional Engineer <br /> ❑Other(Spec ij�) <br /> Test Method Used: X Pressure ❑Vacuum Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx.50' Approx.50' Approx.50' <br /> Product Stored: Super 91 Regular 87 Diesel <br /> Method and location of Test hose at Test hose at Test hose at <br /> piping-run isolation: UDC#1&2 UDC#1&2 UDC#1&2 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes <br /> pressure and starting test: <br /> Test Start Time: 9:25 8:45 8:55 <br /> Initial Reading(Ri): 3 Psi 3 Psi 3 Psi <br /> Test End Time: 10:25 9:45 9:55 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-R!): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Replaced test boot on Super 91 Secondary Pipe at STP Piping Sump#1,prior to testing. <br />