Laserfiche WebLink
Executive Order VR 202-A <br /> Healy Phase II EVR-System <br /> including Veeder-Root ISD System <br /> Exhibit 8 <br /> Required Items In Conducting TP-201.3 <br /> The instructions below are required when conducting TP-201.3 for this system. <br /> The tester shall document that each step was followed as indicated below and <br /> shall include this page of the Exhibit with the submission of TP-201.3 test results. <br /> Note that districts may require use of an alternate form to meet these <br /> requirements, provided the alternate form Includes the same minimum <br /> parameters. <br /> 1. Prior to conducting TP-201.3, all four ball valves on the Healy Clean Air <br /> Separator(CAS) shall be closed, as shown In Figure 1, to isolate It from <br /> the UST system to permit the pressurization of the UST system. <br /> 2. Conducting TP-201.3 with any dispenser piping test valve in the closed <br /> position is not permitted. Any dispenser with a dispenser piping test valve <br /> ..P the closed position while conducting TP-201.3 will bias the test towards <br /> : �rr�pli <br /> rice. <br /> . <br /> 3. After condu6dhk1rP-201.3, the four ball valves on Healy Clean Air <br /> Separator(CAS) shall be locked in their normal operating positions as <br /> shown In Figure 26-5 of Exhibit 2. <br /> Required Steps Verification <br /> circle <br /> 1.All four CAS ball valves closed before conductin TP-201.3 No <br /> 2.All dispenser piping test valves open before conducting es No <br /> TP-201.3 <br /> 3. All four CAS ball valves in normal operating positions after Yes No <br /> conductingTP-201.3. <br /> Test Company: �AFacility Name: fX w <br /> C-2 <br /> -7-U <br /> Print Name(Tester) —mpature Date <br /> Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 8—VR-202-A <br />