Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 4. TANK ANNULAR TESTING re Method Developed By: ❑Tank Manufacturer 0 industry Standard ❑Professional Engineer <br /> ❑Other(Specify)Method Used: ❑Pressure �l Vacuum C1 Hydrostatic <br /> F]Other(Sped) <br /> Test Equipment Used: VACUUM _ Equipment Resolution: "Hg <br /> Tank#87 Tank#91 Tank#DSL Tank# <br /> Is Tank Exempt From Testing?' ❑Yes 9 No ❑Yes I8-No ❑Yes Iallo ❑Yes ❑No <br /> Tank Capacity: 10K l OK l OK <br /> Tank Mat:erial: DW STEEL DW STEEL DW STEEL <br /> Tank Manufacturer: UNKNOWN UNKNOWN UNKNOWN <br /> Product f,tored: FUEL FUEL FUEL <br /> Wait tin:,between applying <br /> pressure/vacuum/water and <br /> starting t st: <br /> Test Starr Time: 1144 1249 1055 <br /> Initial Reading(Rj): 7" 7" 7" <br /> Test End Time: 1244 1349 1155 <br /> Final Reeding(RF): 7" 7" 7" <br /> Test Duration: 1 hr 1 hr 1 hr <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail'Threshold or Criteria: 2 2 2 <br /> Test Result: IR Pass ❑Fail Q Pass ❑Fail AN Pass ❑Fail [IPass ❑Fail <br /> Was sen:;or removed for testing? K Yes []No ❑NA 21Yes 11No ❑NA 01Yes ❑No ❑NA U Yes ❑No 11 NA <br /> LLssensor properly replaced and I4yes ❑No ❑NA CLYes ❑No ❑NA 'AYes ❑No ❑NA ❑Yes [INo ❑NA <br /> fied functional after testing? <br /> CommntW—(include information on repairs made prior to testi ,n and recommended follow-up for failed tests) <br /> r; <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. (i'alifornia Code of Regulations,Title 23,Section 2637(a)(6)1 <br />