My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
14821
>
2900 - Site Mitigation Program
>
PR0518596
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 1:22:36 PM
Creation date
2/19/2020 12:05:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0518596
PE
2960
FACILITY_ID
FA0013993
FACILITY_NAME
TRACY PUMP STATION
STREET_NUMBER
14821
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20919006
CURRENT_STATUS
01
SITE_LOCATION
14821 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 5 <br /> From: Schirripa, Sergio N. [mailto:SERGIO.N.SCHIRRIPA@saic.com] <br /> Sent: Thursday, April 21, 20113:45 PM <br /> To: Mike Infurna [EH] <br /> Cc: Sobieraj, Justin J. <br /> Subject: FW: Tracy Pump Station Soil Boring Permit <br /> Hi Mike, <br /> We are still on for the 2nd through 4th. I Was hoping to confirm with you on how you would like to <br /> schedule the inspections. We are only going to 8 feet max, and we will be grouting to 3 feet bgs, <br /> then backfilling with native soil. Would you like us to keep the holes open and then we can grout <br /> them all when you come to site? Or we can give you a call about an hour before we are ready to <br /> grout? Or will you just be swinging by the site at a random time? Oh the options... Anyways, let <br /> me know how you would like to proceed with the grouting inspections. Hopefully, we will be <br /> advancing around 12-15 borings per day. <br /> Thanks, <br /> Sergio Schirripa <br /> Geologist I Historical Pipeline Portfolio <br /> SAIC Energy, Environment& Infrastructure, LLC (SEE&I) <br /> office: 510.466.7153 1 fax: 510.446.7919 <br /> www.saic.com/EEandI <br /> Please consider the environment before printing this email. <br /> From: Sobieraj, Justin J. <br /> Sent: Monday, April 18, 2011 2:12 PM <br /> To: Mike Infurna [EH] <br /> Cc: Schirripa, Sergio N. <br /> Subject: RE: Tracy Pump Station Soil Boring Permit <br /> Mike- <br /> ] left a phone msg for you regarding the schedule. We still are on with the dates Sergio Schirripa <br /> setup with you(May 2-4)at the Tracy Pump Station. <br /> Thanks, <br /> Justin Sobieraj, PG <br /> Environmental Project Manager I Water, Environment &Transportation <br /> SAIC Energy, Environment& Infrastructure, LLC (SEE&I) <br /> office: 510.466.7119 1 email: sobierajj@saic.com <br /> 1000 Broadway, Suite 675 <br /> Oakland, California 94607 <br /> www.saic.com/EEandI <br /> Energy I Environment I National Security I Health I Critical Infrastructure <br /> Please consider the environment before printing this email <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Tuesday, March 08, 2011 1:51 PM <br /> 4/27/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.