My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
14821
>
2900 - Site Mitigation Program
>
PR0518596
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 1:22:36 PM
Creation date
2/19/2020 12:05:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0518596
PE
2960
FACILITY_ID
FA0013993
FACILITY_NAME
TRACY PUMP STATION
STREET_NUMBER
14821
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20919006
CURRENT_STATUS
01
SITE_LOCATION
14821 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lee Higgins -2- 14 February 2011 <br /> ♦ Chevron, Former Tracy Pump Stat <br /> The workplan proposes the following: <br /> • Drill one boring near TS-04 and at least four offset soil borings to a depth of <br /> approximately five feet below ground surface (bgs) to: a) collect samples at three, four <br /> and five feet bgs and submit for PAHs analysis to more accurately define the lateral and <br /> vertical extent and determine the depth of the proposed excavation; b) submit samples <br /> for waste characterization and disposal purposes. <br /> • Up to 12 contingent offset borings may be drilled to further delineate the lateral extent <br /> of affected soil and to better define the proposed excavation dimensions. <br /> • The pre-excavation information will assist in determining the lateral/vertical limits to <br /> allow immediate post-excavation backfilling to reduce the inconvenience for operating <br /> businesses near the Site. <br /> Central Valley Water Board staff has the following comments: <br /> • At least one or more of the initial borings needs to be continued to a depth of at least <br /> 10-12 feet bgs with additional samples collected to confirm the vertical extent of <br /> affected soil. <br /> • The excavation backfilling and surface repairs should be consistent with the property <br /> owners' specifications. <br /> • The summary soil removal report should include the approximate volume of affected <br /> soil excavated including an estimate of the volume of PAH and/or residual crude oil <br /> material removed. <br /> Central Valley Water Board staff concurs with the workplan provided our comments are <br /> addressed. <br /> By 15 June 2011, please submit the analytical results and the excavation soil sampling report. <br /> If you have any questions or comments, please contact Dean Hubbard at (559) 445-5179. <br /> SHELTON R. GRAY C. DEAN HUBBARD <br /> Senior Engineering Geologist Engineering Geologist <br /> P.G. No. 6357 <br /> cc: Michael Infurna, San Joaquin Country EHD, Stockton <br /> Gary Dobler, Tracy <br /> Michael Hurd, SAIC, Oakland <br />
The URL can be used to link to this page
Your browser does not support the video tag.