Laserfiche WebLink
Page 2 of 3 <br /> -Sergio <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Mon 10/26/2009 3:25 PM <br /> To: Schirripa, Sergio N. <br /> Subject: RE: tracy Pump Station: permit and Schedule <br /> never got the attachment. <br /> try it again. <br /> From: Schirripa, Sergio N. [mailto:SERGIO.N.SCHIRRIPA@saic.com] <br /> Sent: Sunday, October 25, 2009 10:49 PM <br /> To: Ibrahim, Mohamed N.; Mike Infurna [EH] <br /> Subject: FW: tracy Pump Station: permit and Schedule <br /> Hi Mike, I thought this was attached in the email I sent you, but if not, Mohamed can you please take care <br /> of this as I will be out of the office? Thank you gentlemen, <br /> Sergio <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Wed 10/21/2009 8:10 AM <br /> To: Schirripa, Sergio N. <br /> Subject: RE: tracy Pump Station: permit and Schedule <br /> with you changing the C-57 driller since I issued the permit, the copy you <br /> have/PDF is invalid. <br /> will bring out a corrected copy with me the day of the drill. <br /> be advised, future changes in parcel or drillers once a permit has been issued <br /> will require an ADDITIONAL permit application and fee to be submitted. <br /> I'll allow a transfer THIS TIME only. <br /> send me page 2 of the permit packet, the licensed contractor declaration (LCD) <br /> for PeneCore. They will need to authorize your signature on the modified <br /> permit application before I can transfer it. <br /> From: Schirripa, Sergio N. [mailto:SERGIO.N.SCHIRRIPA@saic.com] <br /> Sent: Tuesday, October 20, 2009 3:14 PM <br /> To: Mike Infurna [EH] <br /> Cc: Ibrahim, Mohamed N. <br /> Subject: tracy Pump Station: permit and Schedule <br /> Hi Mike, <br /> I just wanted to get you in the loop. We plan on continuing the investigation at the Tracy Pump <br /> Station Site in Tracy, CA. We anticipate doing this Friday, November 13, 2009. It will be the <br /> advancement of one GeoProbe boring to a depth of approximately 45 feet bgs. Attached is a copy <br /> of our approved permit and all information should be the same however we have changed the <br /> Drilling subcontractor. We will use PeneCore Drilling for this mobilization and the information is as <br /> follows <br /> 10/27/2009 <br />