Laserfiche WebLink
O FUEL SYSTEM NOTES I <br /> F 1. THE CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS AND VERIFY ALL SITE WORK TO La <br /> BE DONE BEFORE COMMENCING WORK. IF SITE CONDITIONS OR DIMENSIONS DISAGREE PATH &Z <br /> Lm�� INFORMATION ON DRAWINGS OR CONFUCTS OCCUR, THE CONTRACTOR SHALL NOTIFY THE <br /> W I� OWNER REPRESENTATIVE BEFORE PROCEEDING WTH ANY WORK. y <br /> 2. PIPING SHOWN SCHEMATICALLY, CONTRACTOR SHALL INSTALL PIPING PER FIELD CONDITIONS LL <br /> I I �c NTH OWNER REPRESENTATIVE'S APPROVAL ' � <br /> I co <br /> 3. ANY UNDERGROUND UTILITIES CROSSING SITE SHALL NOT CROSS OVER/UNDER PRODUCT, S � <br /> CONVENIENCE t $ <br /> ( I // VAPOR OR VENT PIPING. IF A CONFUCT IS ANTICIPATED NOTIFY OWNER REPRESENTATIVE " y m i <br /> MARKET PRIOR TO COMMENCEMENT OF WORK. o d N <br /> 4. ALL PRODUCT, VENT AND VAPOR RETURN LINES SHALL SLOPE 1/4' PER FT. UPWARD FROM TANK. _ <br /> CL <br /> 'mp <br /> 5. USE 3" VAPOR RECOVERY PIPING ALL THE WAY BACK TO REGULAR UNLEADED TANK. C 2 N <br /> –r---- -- -----� F 6. UOUID SUMP SENSORS SHALL BE WIRED FOR COMPLETE TURBINE AND DISPENSER SHUT-DOWN V � —°� 12 <br /> — —— ———— —— —— —— ` — —— ————— — WHEN A LEAK IS DETECTED, OR WHEN THE MONITORING SYSTEM FAILS OR IS DISCONNECTED. o <br /> m U c <br /> m <br /> I 7. TANK CONSTRUCTION/TESTING SHALL BE IN ACCORDANCE 'NTH NATIONALLY RECOGNIZED CODES. G <br /> TANKS SHALL BE INSTALLED AS PER MANUFACTURERS SPECIFICATIONS. NEW PIPING SHALL BE ,th g 0 o a <br /> INSTALLED PER MANUFACTURERS SPECIFICATIONS. THE UNDERGROUND STORAGE TANK SYSTEM, 0) <br /> ALL PIPING, COUPLINGS, SEALANTS, ETC. SHALL BE COMPATIBLE NTH EACH OTHER AND WTH Q ¢ J <br /> I ` THE PRODUCT TO BE STORED. <br /> F4 1 <br /> E— <br /> VENT <br /> VENT RIS <br /> RECE55ED EMER ENGY J _ <br /> PUMP SHVT-OFF - <br /> e — <br /> LYNAj <br /> ;._� <br /> No. 24810 <br /> 1 _ 04/3O/OS <br /> RENEWIL _.p <br /> I "9TFOF�pUF�Q-° <br /> I <br /> i REVISIONS <br /> U 3 W/O FILTER <br /> TYP. OF 2 REYp DATE COMMENTS <br /> 09125002 Planning Cpma*ssim lisang <br /> 121IN3 Reond Per HeNlh Dept CmmN b <br /> v 1�AR <br /> ¢A, 00 S T N41L Q <br /> D (4 TLON I xSl <br /> 1 �l <br /> . <br /> KLn-PRODUGT DISPENSER I <br /> VV NONE NOZZLE EACH LINE OF FUELING ^ ' <br /> 5111E,TYPn6 CANOPY - - - - ' 6 Il VL <br /> Il - TYP. OF 2 <br /> I \ F-3.1 <br /> 1 4 TYP. OF 2 (1 <br /> W <br /> �' F4 TYP. OF 6 4 - e <br /> F4 �.— <br /> 1 I I <br /> u j u l u I I SUPREME Z �2ert�Ww\ <br /> I 15000 <br /> GALLON <br /> I <br /> I5 � <br /> ' I I F4 TYP. c- <br /> -4 �- <br /> L - _ _ --- -gid- -- <br /> -_ - - - -_ U �- -� izoc)� N �t <br /> o r► �N✓ �0�1�y �r '�Q �C j o► -13 U1 <br /> b TYP. w <br /> F4 <br /> to <br /> IL L <br /> NORTH Q Q <br /> 5 0 5 10 20 •— <br /> Ty FEET <br /> GRAPHIC SCALE <br /> FUEL PIPING LEGEND �i <br /> REGULAR UNLEADED PRODUCT, DOUBLE WALL (HARD PIPE) <br /> Oz SUPRVENT,ME PRODUCT, DO <br /> DOUBLE WALL DOUBLE WALL (HARD SLOPE TOWARDITANKS \ r <br /> z � � <br /> Cj j-� - - - - — — — — VAPOR, DOUBLE WALL F.R.P., FUEL SYSTEM SITE PUN <br /> SLOPE TOWARD REGULAR UNLEADED TANK <br /> 1 1 n I 21 .231 F- O " ,� 2 DCI PROJECT NUMBER A01.026.03 <br /> 2210.2 A <br /> R = = 2d 54_20 L = 112.09 1znco <br /> N 89d 1 0011^rY S DATE 051OW3 APPROVED JA <br /> / \ DRAWN: JMAS CHECKED. DT <br /> SCALE'. ASNOTED <br /> GRRNT LINE ROPED <br /> FUEL SYSTEM 517r= FL-AN Fml ■ <br /> SCALE, 1/8" = I'-0' <br />