My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
24915
>
2900 - Site Mitigation Program
>
PR0515532
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2020 11:56:34 AM
Creation date
2/20/2020 11:13:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0515532
PE
2950
FACILITY_ID
FA0012222
FACILITY_NAME
CORDES FARM
STREET_NUMBER
24915
Direction
S
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
24915 S HANSEN RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sample Sampling Number of Suspected EPA <br /> Number Location Samples Contaminant Method <br /> B-1 Gas AGT One Gas/BTEX/MTBE 8020 <br /> B-2,3 Diesel AGT Two Diesel 8015M <br /> B-4,5,6 Storage Barn Three Diesel/Gas/BTEX/Metals 8015M/8020/6010 <br /> B-7,8,9,10 Misc. Storage Four Diesel/Gas/BTEX/Metals 8015M/8020/6010 <br /> B-11,12,13 Septic USTs Three VOCs 8260 <br /> P-1 to 8 Fields Eight Pesticides 8080 <br /> S-1,2 Wash Two Motor Oil/Metals 8015NV6010 <br /> W-1 Water Well One General Minerals Ag 171 <br /> All samples will be analyzed on the standard 5-day turn-around-time schedule. <br /> VI. REPORT PREPARATION <br /> A written report summarizing the results of the sampling will be prepared at the conclusion of the proposed fieh <br /> activities. The report will contain descriptions of field activities, laboratory results, and conclusions and <br /> recommendations. Also included in the reports as applicable, will be sample,chain-of-custody documents, and <br /> copies of the analytical laboratory reports. The report will be prepared/reviewed by a California Registered Civi <br /> Engineer or Geologist. The report will be submitted to the SJCEHD upon completion of investigative activities. <br /> VII. PROJECT STAFF AND SCHEDULE <br /> Mr. Long Ching, a California Registered Civil Engineer, will act as the Senior Project Manager and provide <br /> technical oversight for this project. Mr. Robert Horwath, a California Registered Geologist,will be the Project <br /> Manager and handle the logistics of the sampling activities. Additionally, AllWest's staff of engineers, <br /> geologists, and technicians will be employed to perform the various tasks of the project. <br /> The utility clearances is scheduled to be completed on November 15, 1999. The soil sampling is scheduled for <br /> November 22, 1999. A soil sampling report will be submitted to San Joaquin County Environmental Health <br /> Division (SJCEHD) upon completion of investigative activities. <br /> PC I 0\C:\Bob\W P99141.23 CORDES FARM,TRACY SOIL,samphng.wpd <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.