My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2020 9:29:29 AM
Creation date
2/21/2020 12:03:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2020 - 02 - 19 080" 21 Diesel 223 2095993680 > > Loves P 2/4 <br /> UNDERGROUND SCOWETANK <br /> DESIGNATED UNDERGROUND STORAGE TANK OPERATOR VISUAL INSPECTION REPORT (Pago 2 of 2) <br /> ViI. INSPECTION HISTORY <br /> Has each follow-up action of Section q1 from the previous inspection been completed appropriately? Y N <br /> Attach documantatlonygrif <br /> yLng ap ru date service to this reports (� <br /> VUI. ALARM HISTORY <br /> Attach a copy of the alarm history reportflog to this re art. Y N INA <br /> Is the monitoring system Rowered on and in proper operating mode? YM C3 13 <br /> Has each leak detection alarm since the previous inspection been responded to appropriately? In ❑ ❑ <br /> Attach documantatlon yRr1WnffftPproPjj8tQ service to this t'e ort, <br /> Have all containment Sumps that have had a leak detection alarm since the previous inspection been responded to by a ❑ 13ualified UST Service Technician? <br /> List below in Sectlon IX aA containment sumps that have had a leak detection alarm since the previous Inspection end have not been <br /> responded to bye qualified UST Service Technician. Containment sumps listed below requires visual Inspection for damage, water, debris, <br /> hazardous substance and proper sensor location. The results of the Visual Ina ction most be recorded in Section IX <br /> IX- UNDERGROUND STORAGE TANK SYSTEM INSPECTION <br /> F .Is the containment sum I j2 free of damage, water, debris, and hazardous substance? <br /> ContainmontSum ID Y N Containment Sume ID Y N <br /> 1313 ❑ 13 <br /> 1313 1313 <br /> ❑ a 13 13 <br /> 13 13 n 0 <br /> Ate all sensors in containment sumps inspected located to detect a leak at the earliest opportunity? [31 ❑ <br /> Is the spill container free of damage, water, debris, and hazardous substance? <br /> Tank IDI ilrVCrC" tdt"-$7"E:T k , 19 1 ❑ I Tank ID I tipillUo a ase a ❑ <br /> Tank ID I WillUG e - R9 O 'Tank iD I *pill ESUCKOMIOSOIW05Q <br /> Is the {ill pipe ['ems of <br /> .$ ERS" t Wrest <br /> Spill-t3 {(�Ylyt <br /> Tank 10 [� Tank IDQ <br /> Tank lDip u [ Tank ID Rt uc e - tese es X) ❑ <br /> Is the till cap secureIX on the fill pipe? <br /> Tank ID UP111 LSUCKOV01CaST, Of VV6151 [31 Tank ID I bPfllttC 6 - eS9 8S ❑ <br /> Tank ID Q Tank 11) 569 <br /> XI ❑ <br /> Is the under-dls enser containment free of dams e, water, debris, and hazardous substance? <br /> Under-Cris neer Containment ID Y N NA Under-�t is r Containment ID Y N N <br /> IspettserAV A ® 13 ❑ Disperiser-23 420 4l 5 E1:1 ❑ <br /> er;:=, '77 ❑ 13t 13 ❑ <br /> Dlsanser=9110, 11 /12 99 13 Q 13 C3 1:11 <br /> Ispensar='13f14;t4j(1 ® ❑ ❑ ❑ © ❑ <br /> - ® 1313 1313 ❑ <br /> Tspenser- 13 ❑ a ❑ <br /> Are all sensors In untter.disponser contalaynent looted to detain a leak at the earliest opportunity? <br /> X. TESTING AND MAINTENANCE Y N NA Date Last <br /> Performed <br /> Has the monitoring system certification been completed within the past 12 months? ❑ 8/6119 <br /> Has the $pill container testing been completed within the past 12 months? ❑ <br /> Has the overfill prevention equipment inspection beers completed within theest 36 months? 29 ❑ ❑ <br /> Has the seconday containment testing been completed within the past 36 months? Mill ❑ <br /> Has the tank tightness testing been completed within required timeframes? ❑ ❑ <br /> Has the line tightness testing been completed within the required timeframes? ❑ ❑ e16/7g <br /> Cather required testing 1 maintenance was completed within required timeframe. (List tastImaintenance Items beta <br /> Test / Maintenance: ❑ I ❑ <br /> Test / Maintenance: Toat/Maintenance: O 13 <br /> Test / Maintenance: Test/Maintenance: O <br /> Test / Maintenance: T <br /> , ,estiMaintgrigrice © ❑ <br /> Test / Maintenance: TestiMaintenanca: ❑ 1 1 <br /> Test i Maintenance: 13 C31 I <br /> XL FACILITY EMPLOYEE TRAINING Y N <br /> Have all individuel5 performing facility employee dudes received the required facility employee training within the past 12 months? ❑ <br /> 1 the tactlity has more components than this fort accommodates, additional copies of this page may be allached. <br /> Y = Yos, N u No, NA n Piot Applicoblo, ip a identification 1,0VIi8 - 223 - 1 ^.12812019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.