Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 1 of 6) <br /> Type of Action ❑ Installation Test ❑ Repair Test ❑Six Month Test ❑x 36 Month Test <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Secondary Containment Test <br /> 10184317 12/18/2019 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Love's Fuel Center <br /> Business Site Address City ZIP Code <br /> 1553 Colony Road Ripon 95366 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test(Print as shown on the ICC Certification) Phone# <br /> Benjamin Duncan (707) 621-0378 <br /> Contractor/Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> Tank Tester License #90-1120 5246802-UT 3/21/2021 <br /> III. SUMMARY OF SECONDARY CONTAINMENT TESTING RESULTS <br /> TANK ID: (By tank number, stored product,etc.) A T-1-Diesel B T-2-Diesel C T-3-87 D T-4&5-91-87 <br /> Tank Containment <br /> Tightness Test Result R Pass ❑Fail ❑ NA O Pass ❑Fail ❑ NA Z Pass ❑Fail ❑ NA O Pass ❑Fail ❑NA <br /> Product Piping Containment <br /> Tightness Test Result E Pass ❑ Fail ❑ NA E Pass ❑ Fail ❑NA O Pass ❑Fail ❑ NA O Pass ❑Fail ❑NA <br /> Communication Test Result R Pass ❑ Fail ❑ NA R Pass ❑ Fail ❑NA R Pass ❑Fail ❑ NA E Pass ❑Fail ❑NA <br /> Remote Fill Piping Containment <br /> Tightness Test Result ❑Pass ❑Fail Z NA ❑Pass ❑Fail R NA ❑Pass ❑Fail E NA ❑Pass ❑Fail Z NA <br /> Communication Test Result ❑ Pass ❑Fail R NA ❑Pass ❑Fail E NA ❑ Pass ❑Fail E NA ❑Pass ❑Fail R NA <br /> Vent Piping Containment <br /> Tightness Test Result ❑Pass ❑Fail E NA ❑Pass ❑Fail Z NA ❑ Pass ❑ Fail E NA ❑Pass ❑Fail E NA <br /> Communication Test Result ❑ Pass ❑Fail Z NA ❑ Pass ❑Fail E NA ❑ Pass ❑ Fail Z NA ❑Pass ❑ Fail E NA <br /> Vapor Recovery Piping Containment <br /> Tightness Test Result ❑ Pass ❑Fail R NA ❑ Pass ❑Fail E NA ❑ Pass ❑ Fail Z NA ❑Pass ❑ Fail Z NA <br /> Communication Test Result ❑ Pass ❑Fail E NA ❑ Pass ❑Fail R NA ❑ Pass ❑ Fail R NA ❑Pass ❑ Fail E NA <br /> Turbine/Product Piping Sump <br /> Tightness Test Result R Pass ❑Fail ❑NA E Pass ❑Fail ❑ NA Z Pass ❑ Fail ❑NA E Pass ❑ Fail ❑ NA <br /> Fill Riser Sump <br /> Tightness Test Result E Pass ❑Fail ❑NA Z Pass ❑Fail ❑ NA R Pass ❑ Fail ❑NA R Pass ❑ Fail ❑ NA <br /> VENT/TRANSITION SUMP ID: a b C d <br /> Tightness Test Result ❑ Pass ❑Fail Z NA ❑Pass ❑ Fail E NA ❑ Pass ❑ Fail E NA ❑Pass ❑ Fail Z NA <br /> UDC ID: 1 1&2 2 3&4 3 5&6 4 7&8 <br /> Tightness Test Result Z Pass ❑Fail ❑NA R Pass ❑ Fail ❑ NA R Pass ❑ Fail ❑NA E Pass ❑ Fail ❑ NA <br /> UDC ID: 5 9&10 6 11&12 7 13&148 15&16 <br /> Tightness Test Result E Pass [:]Fail C1 NA R Pass ❑ Fail ❑ NA E Pass ❑ Fail ❑NA Z Pass ❑ Fail ❑ NA <br /> UDC ID: 9 17&18 10 19&20 11 21thru27 Master 12 21thru27 Satellite <br /> Tightness Test Result E Pass ❑Fail ❑NA LR Pass ❑ Fail ❑ NA E Pass ❑ Fail ❑NA E Pass ❑ Fail ❑ NA <br /> All items marked"Fail"or"NA"must be explained in their respective"COMMENTS"section. <br /> IV. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING 1MS <br /> I hereby certify that the secondary containment was tested in accordance with California Code of R4bjj"dqP,,XjWj dVi <br /> 3,Chapter 16,Section 2637 and all the information contained herein is accurate. <br /> UST Service Technician Signature an � JAN 0 9 2020 <br /> CERS=California Environmental Reporting System,ID=Identification,UST=Underground Storage Tank,ICC=International Code Goi,mp M M Mplic�l�,(JpCH�IL�Le[TH <br /> Dispenser Containment ` I�V�hivi�J tI�J I/1L CHL <br /> DEPARTMENT <br />