Laserfiche WebLink
UNDERGROUND STORAGE TANK _E�D <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: <br /> If you already have a site plan that shows all required information,you may include it, rather th t nitoring m <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify loo �wRifMIEWglg equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces orvault;4)devices monitoring product piping,5)devices monitoring fil/piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps;9) devices monitoring under-dispenser containment,- 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> site Address. LOVES 1553 COLONY ROAD RIPON CA 953651 <br /> KEY ns. <br /> A=ANNULAR 27. . . . . . . . . _ . . . . . . . . . . . . . . . . <br /> F=FILLS . . . . 299 . . . . . . . . . . <br /> T=TL RBINE 29. _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> P=PROBE 252. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> V=VAPOR . . . . 25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> %=S17%flP SENSOR 124.1 <br /> . . . . . . . <br /> L=Leak Detector . . . . . . . . . . . . . .B=Brine Sensor . . . . . . Dff Dff ti7OI=Swart 5ewor _ _ . _ _ _ itS=STP . . _ . . . . . . OC=Floats d Chain;E=EStop . . . . . . . . . . . . . . av. . . . . . . . . . <br /> _O <br /> xOr <br /> x x <br /> . . . . . 91 <br /> . . . . <br /> . . . . . , <br /> . . . . . . . . . . . . T S <br /> . . . . . . . . . T <br /> X1_ <br /> ;PIPING} <br /> (4RROWS) <br /> . Drawing of ptpm= <br /> 16. . . . . _ . . . . . . . _ . . . . . . . . . . . . . etnt of sump and <br /> C X \ X UDC's.No <br /> . - I lltldereround <br /> .:ve <br /> 18. ` 17. . . . . . . . . . . . . . . x .19. . . . . . . . . cannot speculate <br /> blue prints. <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . a. <br /> �';tarn rmaGrsrasaitha�e inrr lisrbie m tlat earl(iirrg rec)nicimr as a <br /> F9«ogirrarort�t•mdotsdtlt'.forrferm+tomlpenFr>:e. £hmrrryg <br /> rottosede <br /> Date map was drawn: 816119 <br /> Instructions <br /> If you already have a diagram that shows all required informationyou may include I-rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locators of the following equipment.I installed:monitoring system control panels;sensors mondortng tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas:mechanical or eleearonrc line leak detectors;and in-tank liquid level <br /> probes(I used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> LEGEND <br />