Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 4 of 6) <br /> XIII. VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> A ❑ I B ❑ I C ❑ D ❑ <br /> A 1 B ❑ I C ❑ I D <br /> Test Method Used: ❑ Manufacturer Guidelines(Specify): <br /> ❑ Industry Code or Engineering Standard(Specify): <br /> ❑Engineered Method(Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Vapor Recovery Piping Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> Interstitial Communication Verification Method Used: <br /> XIV. COMMENTS <br /> Provide any additional comments here. <br /> NA-Section III: No Vapor Recovery Piping Containment at this UST Facility. <br /> XV. TURBINE/PRODUCT PIPING SUMP TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Unknown Fiberglass A ❑X I B ❑X I C ❑x D ❑X <br /> Unknown Fiber lass A ❑ I B ❑ I C ❑ I D ❑x <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑ Industry Code or Engineering Standard(Specify): <br /> Z Engineered Method (Specify): Caldwell Systems/Hydrostatic 30 Minutes <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages2 <br /> Turbine/Product Piping Sump Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> Caldwell Level Change Indicator 7/5/2020 <br /> ICC Service Technician #5246802-UT 3/21/2021 <br /> Underground Storage Tank Tester License #90-1120 12/31/2022 <br /> XVI. COMMENTS <br /> Provide any additional comments here. <br /> ID=Identification <br />