My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
2800 - Aboveground Petroleum Storage Program
>
PR0515456
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2020 2:53:28 PM
Creation date
2/21/2020 1:36:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515456
PE
2832
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
01
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tanknology Inc. <br /> 11000 N.MoPac Expressway, Suite 500 Austin,TX 78759(800)964-0010 Policy 100-29-B <br /> INSPECTOR ONLY Rev:A <br /> SAFETY CHECKLIST - OVF <br /> Site Name/#: Street Address: City,State,and Zipcode: W.O.# <br /> JOES TRAVEL PLA 15600 S HARLAN 15600 S HARLAN RD LATHROP,CA 95330 AST-6704669 <br /> Arrival Time: Departure Time: Travel Time: Others on site: Date: <br /> 12:31:00 PM PDT 12:14:00 PM PDT Apr 24,2020 <br /> Scope of Work and Tasks Performed(JSA's must be available for all tasks): <br /> Formal AST Inspection <br /> Repairs to Equipment or Parts Provided: <br /> Follow-up actions required;equipment isolated;comments: <br /> PPE-PERSONAL PROTECTIVE EQUIPMENT REQUIRED(Check items used or mark—if not applicable) <br /> 0 Safety Vest 0 Safety Glasses 0 Gloves ❑ Hearing Protection <br /> 0 Steel Toe Boots ❑ Splash Goggles ❑ Hard Hat ❑ Other <br /> PRE-TEST PROCEDURES (Check each item completed or mark- if not applicable) <br /> 1. 0 Discuss safety procedures with site personnel.Nearest hospital: <br /> 2. ❑ Prior to fuel deliveries the UST system must be placed back into working order. <br /> 3. ❑ Secure entire work area with barricades(cones,flags,and caution tape,pennant flags,or other perimeter guard). <br /> 4. ❑ Place fire extinguishers and"No Smoking"signs in the work area. <br /> SIGN IN Lead Technician Name Lead Technician Signature <br /> General Safety Checks: <br /> 0 All site personnel have been informed. Philip Thiel G&W <br /> ❑ Fuel delivery has been informed. <br /> ❑ Work areas barricaded to protect workers,staff&public. Site Representative Name Site Representative Signature <br /> ❑ Is a fuel delivery due today? <br /> I have discussed job clearance form with technician. <br /> POST-TEST PROCEDURES (Check each item completed or mark- if not applicable) <br /> 1. ❑ Run all pumps and verify there are no leaks: <br /> ❑ Impact Valve Test Ports under dispensers ❑Leak Detector Threads on STP's ❑ Functional Elements&Relief Screws <br /> 2. ❑ Confirm location was returned to pre-arrival state <br /> 3. ❑ Remove barricades <br /> SIGN OUT&Operator Verification of Work(OVF) Lead Technician Name Lead Technician Signature <br /> General Safety Checks: <br /> ❑ Work area has been left tidy&safe Philip Thiel <br /> ❑ Site staff are aware of work status including any remaining isolation <br /> Site Representative Name Site Representative Signature <br /> ❑ Changes to equipment are documented and communicated <br /> ❑ All incidents,near incidents,and unsafe situations reported <br /> Site Representative Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.