My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
2800 - Aboveground Petroleum Storage Program
>
PR0515456
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2020 2:53:28 PM
Creation date
2/21/2020 1:36:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515456
PE
2832
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
01
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJOANIN Environmental Health Department <br /> —COUNTY <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> JO ES TRAVEL PLAZA 15600 S HARLAN RD, LATHROP February 13, 2020 <br /> Qualified Facility-7er I <br /> 404 CFR 112.6(a)(3)(II) No 2CT for bulk containers,or mobile storage containes not located to prevent discharge <br /> oV oR oC05 <br /> 405 CFR 112.6(a)(3)(iii) Overfill prevention for containers not provided,not described In Pan,or tested o V o R o COS <br /> Qualified Facility-Tier II <br /> 501 CFR 112.6(,1 Tier Il Qualified Facility Plan not certified by the owner or a PE,as required o V o R o COS <br /> r12.6a) <br /> 502 CFR 112.61 Tier 11 Qualified Facility Plan technical amendment not certified by Has owner or a PE o o oCOS <br /> Sol CFR 112.6(bX3), Failure to have a PE certify in writing alternative measmee fair a Tier 11 Qualified Facility o o oCOS <br /> 112.6(b X4) <br /> 504 CFR 112.6(b)(4)(I) Failure of owner to assure that a PE makes all required attestations In a Tier 11 Plan o In In COS <br /> General Requirements for SPCC Plans <br /> Wi CFR 112.7 Failure of Plan to fulfill basic requirements including a proseereferencing section o V In R o COS <br /> 602 CFR 112](.X2) 1 Ran failed to discuss equivalent environmental protection,if applicable o o oCOS <br /> 603 CFR 112](.X3) Failed to adequately describe the physical layout ofthe facility In the Plan aV aR oCOS <br /> OM CFR 112.7(.1 Ran failed to include oil type and storage capacity for each container o o In COS <br /> 605 CFR 112.7(aX3)(ii) Ran failed to adequately discuss discharge prevention measures,including rculine hsrMeg o o In COS <br /> 606 CFR 112.7(aX3)(iii) Ran failed to adequately discuss facility drainage or drainage controls o o In COS <br /> W7 CFR 112.7(aX3Xiv) Ran failed to include countermeasures for discharge discovery,response and cleanup o o oCOS <br /> 6D8 CFR 112.7(.1 Ran failed to address disposal methods for recovered messiness o o oCOS <br /> 609 CFR 112.7(aX3vt), Ran failed to adequately contain procedures for repurM13g a discharge o V o R o COS <br /> 112.](.4) <br /> 610 CFR 112](.X5) Discharge procedures are not adequately add ressed if the facility h as no response plan o o oCOS <br /> 611 CFR 112.7(b) Ran failed to lnclud e a d ascription of potential equi pment fallu re or p rwde equival encs, o o oCOS <br /> 612 CFR 112.7(c) Ran failed to lnclud a secondary portal nment,diversionary stru aures,or equip to prevent discharge o o oCOS <br /> 613 CFR 112.7(c) Failure to provide app ropriate secondary portal nment,diversionary stru aures or equ Pon ant aV o oCOS <br /> 614 CFR 112](4) PE certified Plan fall eel to explain l mpraaicablli[y of contain menVtllversion ary structures o o oCOS <br /> 615 CFR 112](4) Failure to perform integrity and l eak testing when claimi ng secondary containm ant l mpraaidabikty o o oCOS <br /> 616 CFR 112](di Failure to prep are an oil so 111 conting ency p tan Men pial min g lm practicability of structures o o oCOS <br /> 617 CFR 112.7(dl No Witten commitment of manpower,equipment,and materials to control and remove oil discharge o o oCOS <br /> 618 CFR 112.7(e),112.8(c) Failed to keep recerde of proce4lres,inglerLarre,and tarts fair On.yuare r V r R r COS <br /> (6) <br /> 619 CFR 112.7(fX1) Failed to train personnel on all dl scharge prevention decal is listed In this section r V r R r COS <br /> 620 CFR 112.7(fX2) Failed to design ate a person accountabl a for discharge p invention o o oCOS <br /> 621 CFR 112.7(fX1) Failure to include In the SPCC Plan an adequate description of employee training o o oCOS <br /> 622 CFR 112.7(fX3) Failu re to con duct control ate annu al d lscharg a prevention briefing s for oil-hand lin g personnel o o In COS <br /> 623 CFR 112](9) Ran failed to address security of site and val lock cubital out,and lighting o o In COS <br /> 624 CFR 112.7(g) Facility fat led to l mi amen secu ri[y of see amid val lock outttag out,an d ll ghti ng o In In COS <br /> 625 CFR 112.7(6) Ran failed to adequately d'eares raptly tank car and tank back load'ngynloadeg rack In V In R In COS <br /> FMOKI P110515459 SW01 011132023 <br /> EHD28U111-9/202018 Page 2 of Alww r J Petroleum Storage AC OIR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-3420 1 F 209 464-0138 1 w .sjoehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.