Laserfiche WebLink
1) Special requirements?TWIC card,military base,escort required, etc? <br /> 2) Safety requirements?Tyvek suit,respirator,3`a party provider ie ISNet,Avetta, Browz <br /> Supply lines: <br /> 1) Are lines above or below ground? ��1N U� <br /> 2) Suction,pressurized or gra ity? �* <br /> 3) Steel or fiberglass? T I W q(,45� <br /> 4) Do they supply Day Tanks? <br /> 5) Does facility have maintenance to assist with piping isolation? <br /> Inspections and Testing Records: <br /> 1) Any records or dates of prior monthly or annual testing/inspections? <br /> A. Federal <br /> B. State <br /> Local <br /> Fuel SamAlinpu <br /> 1) What is fuel sampling requirements for the site? <br /> Billiu information: <br /> 1 Bill to Information: Company Name and Address <br /> 2) Does billing go to individual site or to corporate?(If individual facility,credit application will be needed) <br /> 3) Is decision making process at individual site level or corporate level? <br /> 0 ftv&L/ r bpf <br /> ) 5-boo � - �IAALJ41-1 0 <br /> MT�9�P cPf 95-334 <br />