Laserfiche WebLink
CROSS REFERENCE TO SPCC CFR REQUIREMENTS (40 CFR 112.7) <br /> This SPCC does not exactly follow the order of the requirements presented in 40 CFR 112. Where <br /> appropriate, section headings identify the sections of 40 CFR 112 being addressed. A cross-reference is <br /> provided below to identify the page number of each requirement 40 CFR 112 applicable to this plan. <br /> Cross Reference <br /> CFR PROVISION SPCC PLAN SECTION PAGE <br /> 40 CFR 112.2 DEFINITIONS 4 <br /> 40 CFR 112.3(d) PROFESSIONAL ENGINEER CERTIFICATION 2 <br /> 40 CFR 112.3(e) SPCC PLAN LOCATION 11 <br /> 40 CFR 112.5(a) SPCC PLAN AMENDMENTS 12 <br /> 40 CFR 112.5(b) SPCC PLAN REVIEW 12 <br /> 40 CFR 112.5(c) ENGINEER REVIEW OF SPCC PLAN AMENDMENTS 13 <br /> 40 CFR 112.7 MANAGEMENT APPROVAL 2 <br /> 40 CFR 112.7(a)(3) FACILITY DESCRIPTION 9 <br /> 40 CFR 112.7(a)(3)(i) OIL STORAGE CONTAINERS 10 <br /> 40 CFR 112.7(a)(3)(ii) ROUTINE HANDLING OF PRODUCTS 23 <br /> 40 CFR 112.7(a)(3)(iv) DISCHARGE DISCOVERY, RESPONSE, AND CLEANUP 25 <br /> 40 CFR 112.7(a)(3)(v) WASTE DISPOSAL 26 <br /> 40 CFR 112.7(a)(3)(vi) EMERGENCY CONTACT LIST 28 <br /> 40 CFR 112.7(a)(4) DISCHARGE NOTIFICATION 27 <br /> 40 CFR 112.7(a)(5) DISCHARGE DISCOVERY, RESPONSE, AND CLEANUP 25 <br /> 40 CFR 112.7(b) POTENTIAL EQUIPMENT FAILURES 16 <br /> 40 CFR 112.7(c) GENERAL SECONDARY CONTAINMENT STRUCTURES 13 <br /> 40 CFR 112.7(d) DEMONSTRATION OF PRACTICABILITY 16 <br /> 40 CFR 112.7(e) INSPECTIONS AND RECORDS 24 <br /> 40 CFR 112.7(f) PERSONNEL, TRAINING AND SPILL PREVENTION PROCEDURES 24 <br /> 40 CFR 112.7(8) SECURITY 24 <br /> 40 CFR 112.7(h) TANK CAR AND TANK TRUCK LOADING/UNLOADING RACK 24 <br /> 40 CFR 112.7(i) BRITTLE FRACTURE EVALUATION 23 <br /> 40 CFR 112.70) CONFORMANCE WITH STATE AND LOCAL APPLICABLE REQUIREMENTS 23 <br /> 40 CFR 112.7(k) OIL-FILLED OPERATIONAL EQUIPMENT 23 <br /> 40 CFR 112.8(b) FACILITY DRAINAGE 16 <br /> 40 CFR 112.8(c)(1) BULK STORAGE TANK CONSTRUCTION 17 <br /> 40 CFR 112.8(c)(2) SIZED BULK STORAGE TANK SECONDARY CONTAINMENT 15 <br /> 40 CFR 112.8(c)(3) DRAINAGE OF CONTAINMENT AREAS 18 <br /> 40 CFR 112.8(c)(4) COMPLETELY BURIED TANKS 18 <br /> 40 CFR 112.8(c)(5) PARTIALLY BURIED TANKS 18 <br /> 40 CFR 112.8(c)(6) PERIODIC INTEGRITY TESTING 19 <br /> 40 CFR 112.8(c)(7) INTERNAL HEATING COILS 21 <br /> 40 CFR 112.8(c)(8) OVERFILL PREVENTION 21 <br /> 40 CFR 112.8(c)(9) EFFLUENT TREATMENT FACILITIES 22 <br /> 40 CFR 112.8(c)(10) VISIBLE DISCHARGES 22 <br /> 40 CFR 112.8(c)(11) SIZED SECONDARY CONTAINMENT FOR MOBILE AND PORTABLE 15 <br /> CONTAINERS <br /> 40 CFR 112.8(d) TRANSFER OPERATION, PUMPING AND IN-PLANT PROCESSES 22 <br /> 40 CFR 112.8(d)(1) BURIED PIPING 22 <br /> 40 CFR 112.8(d)(2) TRANSFER POINT TERMINAL CONNECTIONS 22 <br /> 40 CFR 112.8(d)(3) PIPING SUPPORTS 22 <br /> 40 CFR 112.8(d)(4) PIPING INSPECTIONS 22 <br /> 40 CFR 112.20(e) SUBSTANTIAL HARM DETERMINATION 24 <br /> Joe's Travel Plaza <br /> 15600 Harlan Road,Lathrop,CA <br /> Page 3 <br />