My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
9508
>
2900 - Site Mitigation Program
>
PR0516935
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 4:23:10 PM
Creation date
2/21/2020 1:37:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516935
PE
2960
FACILITY_ID
FA0012937
FACILITY_NAME
MONIER LIFETILE LLC
STREET_NUMBER
9508
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19321003
CURRENT_STATUS
01
SITE_LOCATION
9508 S HARLAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Groundwater Monitoring Plan 8 <br /> 4.0 SCHEDULE AND REPORTING <br /> This section describes the proposed groundwater monitoring schedule and reporting activities for <br /> the facilities. <br /> 4.1 Monitoring Schedule <br /> The groundwater monitoring wells will be installed within 30-days of written approval of this plan <br /> by the CV-RWQCB. The proposed schedule as outlined in the action plan for the calendar year <br /> 2002 is presented below: <br /> Task Dates <br /> Submit workplan to CV-RWQCB Jan 10, 2002 <br /> Receive final approval of workplan from February 11, 2002' <br /> CV-RWQCB <br /> Install and develop monitoring wells February - March 2002 <br /> Begin groundwater monitoring February-March 2002 <br /> (minimum of 1 week after well installation <br /> and development) <br /> Conduct one year of quarterly groundwater March,June, September, and December <br /> monitoring,gauging, and data evaluation 2002 <br /> Submit Quarterly Reports to CV-RWQCB 60-days from the completion of the <br /> quarterly events (May,August, and <br /> November 2002 and February 2003 <br /> Submit Feasibility Study/Remedial Options January 1, 20032 <br /> S/RO) Report to CV-RWQCB <br /> Groundwater monitoring will be conducted quarterly for a period of one year and will begin in the <br /> later part of the first quarter of 2002 pending approval of this plan. An initial evaluation of <br /> groundwater conditions at the facilities will be completed after the first two quarterly monitoring <br /> events. At which, MonierLifetile may request modifications to the groundwater monitoring <br /> program and compliance dates listed in the preliminary Cleanup and Abatement Order. <br /> 4.2 Quarterly Reports <br /> Separate quarterly monitoring reports will be submitted and will include the following: <br /> ■ Site location map for each facility <br /> Date for CV-RWQCB approval has been accelerated to meet the final schedule necessary to achieve <br /> compliance with the Order. <br /> The FS/RO Report will be based on the first 3 quarters of monitoring to meet the Order schedule for this <br /> report. When results from the 4th quarter of monitoring are received, the submittal will be evaluated for any <br /> needed revisions based on the additional information. <br /> P:\wp\jobs\20587\CAO GW Workpl=.doc—DCN 12495 January 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.