Laserfiche WebLink
Long Term Storm Water Action P, French Camp,California <br /> MonierLifetile LLC June 2002 <br /> Method of Achievement <br /> Category BMP (Implementation) Follow-Up(Maintenance) <br /> Reject Tile Stockpile <br /> Contain contact storm Berm former drainage outfall areas Inspect and routinely repair <br /> water in area of the stockpile to prevent berms. <br /> storm water that comes into <br /> contact with the reject tile pile to <br /> discharge from the facility unless <br /> treated. <br /> Limit infiltration of Inspect and repair asphalt in storm Routine inspection and <br /> contact storm water water accumulation area to prevent repair at the beginning and <br /> into ground infiltration. during the rainy season <br /> plus normal quarterly <br /> inspections listed below. <br /> Remove accumulated storm water Evaporation and treatment <br /> within 7 days of rain events and of storm water for reuse <br /> treat in existing vacuum filter into the production process <br /> system to reuse in production or treat to below water <br /> process or for release to storm quality goals for discharge <br /> water system after testing to storm water system <br /> treatment system discharge to (system discharge <br /> ensure contaminates of concern analytical testing will be <br /> are below water quality goals. performed prior to release <br /> Reformulate tile Change cement supplier to one Manage change to perform <br /> formula to minimize that has less chromium in the analytical testing of new <br /> contaminates of cement and modify mold release cements and mold oils prior <br /> concern agent to non petroleum based. to use. Review other <br /> Perform reclassification of newly material changes(e.g., <br /> generated reject tile if applicable. If oxides) prior to <br /> reclassification is successful, implementing changes. <br /> preferentially utilize'old" reject tile <br /> in process versus"new" reject tile. <br /> Quarterly Inspections Perform quarterly inspections to Performing inspections. <br /> assess the stockpile, asphalt <br /> integrity, and berm. <br /> Reuse Reject tile in Install crusher to enable sizing of Inspection, maintenance, <br /> production process reject tile for reuse in the and repair of crusher. <br /> production process in place of <br /> virgin sand materials. <br />