My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
920
>
1900 - Hazardous Materials Program
>
PR0520259
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 2:06:49 PM
Creation date
2/21/2020 1:59:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0520259
PE
1921
FACILITY_ID
FA0010340
FACILITY_NAME
AMBERLAND COMPOSITES LLC
STREET_NUMBER
920
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
15128029
CURRENT_STATUS
01
SITE_LOCATION
920 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Distillates (petroleum)—the largest container element has not been completed. <br /> 5. Acetone—the size of the largest container element has not been completed. <br /> 6. Methyl Ethyl Ketone Peroxide—the EHS element was wrongly indicates "no" vs. "yes"; the size of <br /> the largest container and the days on site element have not been completed; this amount of the material <br /> must be entered in pounds vs. gallons. <br /> 7. Styrene—the size of the largest container has not been completed. <br /> 8. Styrene—the largest container and days on site elements have not been completed. <br /> • Violation #6, the site map does not show or address the following: <br /> 1. Loading areas. <br /> 2. Internal roads. <br /> 3. Emergency response equipment (spill control equipment). <br /> 4. Emergency shutoffs. <br /> 5. The location of the petroleum distillates and the styrene. <br /> 6. Access and exit points for the building. <br /> A site map shall contain a north orientation, loading areas, internal roads, adjacent streets, storm and sewer drains, <br /> access and exit points, emergency shutoffs, evacuation staging areas, hazardous material handling and storage areas, <br /> and emergency response equipment. If a site map element is not applicable for your facility then list it on the map <br /> and label as "NA". (see attached map guidance documents). <br /> • Violation #8, the Employee Training Plan has not been submitted; employee training records and <br /> material were uploaded in lieu of an Employee Training Plan. <br /> - A training plan must address training for all new employees and annual training, including <br /> refresher courses, for all employees in safety procedures in the event of a release or threatened <br /> release of a hazardous material, including, but not limited to: <br /> 1. Familiarity with the emergency response plans and procedures in the event of a release <br /> or threatened release of a hazardous material. <br /> 2. Immediate notification contacts to the appropriate local emergency response personnel <br /> and to the unified program agency. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.