My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2900 - Site Mitigation Program
>
PR0538837
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 7:06:18 PM
Creation date
2/21/2020 4:51:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0538837
PE
2950
FACILITY_ID
FA0022307
FACILITY_NAME
SAN JOAQUIN GENERAL HOSPITAL
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W HOSPITAL RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+p—, <br /> unStar 25712 Commercentre Drive <br /> Laboratories, Inc. Lake Forest,California 92630 <br /> 949.297.5020 Phone <br /> INVI.QI%I I I Y As u I I]CAI.SERVICES NAtIO\WIDE.. 949.297.5027 Fax <br /> Krazan,Clovis Project: Wilson Way Property <br /> 215 West Dakota Avenue Project Number: 01413157 Reported: <br /> Clovis CA,93612 Project Manager: Mike Bowery 05/14/14 16:09 <br /> EX-6 <br /> T140857-06(Soil) <br /> Reporting <br /> Analyte Result Limit units Dilution Batch Prepared Analyzed Method Note <br /> SunStar Laboratories,Inc. <br /> Extractable Petroleum Hydrocarbons by 8015C <br /> C13-C28(DRO) ND 10 mg/kg 1 4050224 05/02/14 05/08/14 EPA 8015C <br /> C29-C40(MORO) ND 10 <br /> Surrogate:p-Terphenyl 93.6% 65-135 <br /> SunStar Laboratories,Inc. The results in this report apply to the samples analyed in accordance with the chain of <br /> custody document. This analytical report must be reproduced in its entirety. <br /> 44' , i <br /> Daniel Chavez,Project Manager Page 8 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.