My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0544201
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 10:58:24 AM
Creation date
2/24/2020 9:43:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544201
PE
2965
FACILITY_ID
FA0025122
FACILITY_NAME
FORMER OCCIDENTAL CHEMICAL CORP - LATHROP FACILITY
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
01
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM 3 <br /> J. R. SIMPLOT COMPANY <br /> LATHROP, SAN JOAQUIN COUNTY <br /> 2. Detection and Corrective Action Monitoring Program <br /> For any given monitored medium, a sufficient number of samples shall be taken from all <br /> Monitoring Points and Background Monitoring Points to satisfy the data analysis <br /> requirements for a given Reporting Period, and shall be taken in a manner that ensures <br /> sample independence to the greatest extent feasible. <br /> 3. Leachate Monitoring <br /> All Class Il surface impoundment LCRS sumps shall be inspected daily for leachate <br /> generation during the period 1 December through 30 April and weekly thereafter. Upon <br /> detection of leachate in a previously dry LCRS, the Discharger shall immediately sample the <br /> leachate and shall continue to sample the leachate as specified in Table I and the results shall <br /> be reported to the Board quarterly. The quantity of leachate pumped from each sump shall be <br /> measured continuously and reported as Leachate Flow Rate (gallons per day). <br /> TABLE I. LEACHATE MONITORING <br /> Report in Sampling <br /> Parameter/Constituent Units of Frequency <br /> Field Parameters <br /> Flow rate I gallons/day Daily <br /> Specific conductivity2 µmhos/cm Monthly <br /> pH2 Std. pH units Monthly <br /> Monitoring Parameters <br /> Total dissolved, solids mg/1 Quarterly <br /> Sodium mg/l Quarterly <br /> Chlorides mg/1 Quarterly <br /> Constituents of Concern <br /> Sulfates mg/1 Quarterly <br /> Nitrates mg/1 Quarterly <br /> Chemical Oxygen Demand mg/1 Annually <br /> EPA Methods 601 & 602 constituents3 µg/1 Annually <br /> Minerals4 mg/1 Annually <br /> Metals5 mg/l Annually <br /> Daily during the period 1 December through 30 April and weekly thereafter <br /> 2 Field measurements <br /> 3 Report all peaks <br /> 4 Those minerals listed under Class II Surface Impoundment monitoring <br /> 5 Those metals listed under Class II Surface Impoundment monitoring <br />
The URL can be used to link to this page
Your browser does not support the video tag.