Laserfiche WebLink
11 .1 Please include a copy of any studies (soils, geology, marketing , <br /> •etc. ) that you may have had prepared for this project or project <br /> site. N/A <br /> C . PROJECT CHARACTERISTICS <br /> 1 . Services : Indicate how the following services will be provided <br /> for your project and availability of service . <br /> a . Water Supply : CENTRAL DELTA WATER AGENCY <br /> b. Sewage Disposal : N/A <br /> C . Storm Drainage: SACRAMENTO-SAN JOAQUIN DRAINAGE DISTRICT <br /> If an extension of any of the above is necessary, indicate j <br /> which service( s ) , what agency will be providing the <br /> service( s ) , and the distance of the extension( s ) : <br /> N/A <br /> d . Natural Gas: N/A <br /> e . Electricity : PACIFIC GAS AND ELECTRIC COMPAI�TY <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name ) : <br /> PUBLIC / HOLT RD. AND STATE HWY 4 <br /> g . Fire: Distance to nearest fire station.: UNPRCTECTED AREA <br /> h . Schools : N/A <br /> i . Telephone: N/A <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject (specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal , alterations to drainage, <br /> removal, of existing structures, number of trees removed, etc. ) . <br /> IF EXISTING DRAINAGE DITCP.S DO NOT MEET PROPOSED BOUNDARY REQUIREMENTS, <br /> ALTERATIONS WILL BE REQUIRED. <br /> 3 . Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> N/A <br /> Types of emissions and sources associated with project <br /> N/A <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project N/A <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? X NO YES <br /> 4 . How much agricultural land will be removed from production? <br /> NONE <br /> Irrigated Not irrigated <br /> i <br /> Minor Subdivision - 9 - ( 1/89 ) <br /> i <br />