My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
240
>
2900 - Site Mitigation Program
>
PR0539646
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2020 12:09:57 PM
Creation date
2/24/2020 10:54:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0539646
PE
2950
FACILITY_ID
FA0022686
FACILITY_NAME
JF DONALDSON TIRE
STREET_NUMBER
240
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13913002
CURRENT_STATUS
01
SITE_LOCATION
240 N HUNTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f� 1534 Willow Pass Road,Pittsburg,CA 94565-1701 <br /> M c C a m p b e I l Analytical, Inc. Toll Free Telephone:(877)252-9262/Fax:(925)252-9269 <br /> "When Quality Counts" http://www.niecampbefl.com/E-mail:main@niccampbeH.com <br /> WORK ORDER SUMMARY <br /> Client Name: HURVITZ ENVIRONMENTAL QC Level: LEVEL 2 Work Order: 1412460 <br /> Project: #3084.01;Donaldson Tire Client Contact: Lee S.Hurvitz Date Received: 12/10/2014 <br /> Comments: Contact's Email: hurvitz.environmental@gmail.com <br /> ❑WaterTrax ❑WriteOn ❑EDF 0 Excel ❑Fax ❑Email ❑HardCopy ❑ThirdParty ❑J-flag <br /> Lah Ill Client ID Matrix Test Name Containers Bottle&Preservative De- Collection Date TAT Sediment Hold SubOut <br /> /Composites chlorinated &Time Content <br /> 1412460-001A B-1-8 Soil Multi-Range TPH(g,d,mo) 1 plastic tube ❑ 12/10/2014 5 days ❑ <br /> SW8260B(VOCs) 5 days El <br /> 1412460-002A B-1-20 Soil Multi-Range TPH(g,d,mo) 1 plastic tube 12/10/2014 5 days ❑ <br /> SW8260B(VOCs) 5 days ❑ <br /> 1412460-003A B-3-9 Soil Multi-Range TPH(g,d,mo) 1 plastic tube 12/10/2014 5 days ❑ <br /> 1412460-004A B-3-20 Soil Multi-Range TPH(g,d,mo) I plastic tube ❑ 12/10/2014 5 days ❑ <br /> SW8260B(VOCs) ❑ 5 days ❑ <br /> 1412460-005A B-4-10 Soil Multi-Range TPH(g,d,mo) 1 plastic tube 12/10/2014 5 days ❑ <br /> 1412460-006A B-4-20 Soil Multi-Range TPH(g,d,mo) 1 plastic tube 12/10/2014 5 days ❑ <br /> SW8260B(VOCs) 5 days El <br /> 1412460-007A B-5-12 Soil Multi-Range TPH(g,d,mo) 1 plastic tube ❑ 12/10/2014 5 days 11 <br /> 1412460-008A B-5-20 Soil Multi-Range TPH(g,d,mo) 1 plastic tube ❑ 12/10/2014 5 days ❑ <br /> SW8260B(VOCs) ❑ 5 days ❑ <br /> * NOTE: STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed <br /> (i.e., One-day TAT yields results in 3 days from sample submission). <br /> Page 1 of 1 <br /> Page 31 of 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.