Laserfiche WebLink
08/09/2002 14: 14 E.E.0 ' 12094683433 N0.552 D05 <br /> EPC SA1 I-4 UnTirst Stockton Ausuat 8,2002 <br /> Project Schedule <br /> EEC has prepared the following aggressive schedule for implementation of site investigation and <br /> remediation. The schedule is based on the assumption that the lateral and vertical extent of <br /> hydrocarbon-impacted soil that is required or is necessary to be removed is relatively minor,does <br /> not exceed 1,000 cubic yards,and does not extend within 5 feet of groundwater. <br /> . _ <br /> Submit Mirklo an To SJcaEH 819102 814/02 id. <br /> Submit UST Removal Appllcalion 2412/02 8112102 10 ■ <br /> complate Frcavadon arTest Pita 8112!02 8112/2402 1d <br /> Approval of Warolon by SJcpEH a12W 811212002 1d <br /> Remo"UST(a) 8114/02 811b102 24 <br /> %pim paliniqlIon @nd JEYxAvationo 8113!02 8/1812002 3d <br /> WdTocarbon-Impacted Soil <br /> Gonfirmetlon Sol Teatinq $115102 8/1512402 td ■ <br /> Laboratory Anlyaem of Soil Samples 811 b102 8118142 2d <br /> a nq tin ranapofln ona 8/19M2 81191.1002 Id ■ <br /> acted Sails <br /> Closing <br /> Discovery of hydrocarbon-impacted soil and pipelines likely related to former petroleum USTs <br /> have resulted in work stoppage at a major development project at the site referenced above. The <br /> work scope proposed in this document is intended to provide a rapid response to this recent <br /> discovery in accordance with all regulations and requirements of the SJCDEIT EUC appreciates <br /> in advance your assistance and guidance with implementation of this workplan, and looks <br /> forward to working with your agency at the subject site. Please call Mark Zeko at(711) 667- <br /> 2300 if you have any questions or comments. <br /> Sincerely, <br /> FEC <br /> *CW/ I- <br /> Mark Zeko,R,G., C.UG. <br /> Vice President <br />