My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
819
>
2900 - Site Mitigation Program
>
PR0522087
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2020 5:22:22 PM
Creation date
2/24/2020 2:33:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0522087
PE
2960
FACILITY_ID
FA0015049
FACILITY_NAME
UNIFIRST CORP
STREET_NUMBER
819
Direction
N
STREET_NAME
HUNTER
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
819 N HUNTER
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Infurna [EH] <br /> From: Erik_Skov@URSCorp.com <br /> Sent: Thursday, March 10, 2005 5:55 PM <br /> To: Mike Infurna [EH] <br /> Subject: RE: Revised Well Locations 819 N. Hunter-Stockton <br /> Mike, <br /> Thanks for the reply. Will send over new workplan with revised figure. <br /> All wells are proposed to be onsite so no encroachment and closure permits <br /> for this round, though may be likely during subsequent round if required. <br /> Have tentative drill date set for April 18, 19, and 20. Will fill out <br /> permit and send with fee along with the revised workplan. Would also like <br /> to meet with you and Peter at the site in the near future to put the well <br /> locations on the ground. You game for this? <br /> Will also go and buy Lotto Ticket tonight! <br /> Erik Skov R.G. <br /> Senior Geologist <br /> URS Corporation <br /> 221 Main Street, Suite 600 <br /> San Francisco, CA 94105 <br /> Phone (415) 896-5858 (General) <br /> Phone (415) 243-3845 (Direct) <br /> FAX (415) 882-9261 <br /> "Mike Infurna <br /> [EH] " To: <Erik_Skov@URSCorp.com> <br /> <MInfurna@sjcehd. cc: <br /> com> Subject: RE: Revised Well Locations 819 N. <br /> Hunter-Stockton <br /> 03/10/2005 01:51 <br /> PM <br /> sounds fine. .I'm leaning in your logical direction also about clean vs <br /> reality but I'm willing to cross THAT bridge when I get there. <br /> Go ahead and modify/send the revised wp to me. I'll do the H&S code things <br /> [2596.10c3] to it and generate the approval letter within two days. You may <br /> start working with a driller and I'd like to see you actually drill in <br /> April, if possible. <br /> FYI: permits are available on the website attached here: <br /> http://www.sjgov.org/ehd/docs/pdf/WELL-PERMIT-APPL.pdf <br /> installation permit applications are PER PARCEL and $89 each. City right <br /> of way counts as it's OWN parcel, so if you plan on going into their ROW, <br /> you'll need a separate one for that, plus the City encroachment permit. <br /> Call (209) 937-8444 for forms, info, and be prepared for <br /> loops-to-jump-thru. If so, I'll delay the April drill. <br /> thanks again for your cooperation and understanding with my concerns. n <br /> just for the record, you should know that IF, and only IF this site's gw N <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.