My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
819
>
2900 - Site Mitigation Program
>
PR0522087
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2020 5:22:22 PM
Creation date
2/24/2020 2:33:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0522087
PE
2960
FACILITY_ID
FA0015049
FACILITY_NAME
UNIFIRST CORP
STREET_NUMBER
819
Direction
N
STREET_NAME
HUNTER
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
819 N HUNTER
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Infurna [EH] <br /> From: Amy Terrell [aterrell@waterboards.ca.gov] <br /> Sent: Wednesday, August 29, 2007 5:42 PM <br /> To: saquilino@unifirst.com <br /> Cc: WPipes@geomatrix.com; gbibler@goodwinprocter.com; tcosgrave@harvardprojects.com; <br /> Mike Infurna [EH] <br /> Subject: unifirst schedule <br /> Mr.Aquilino, <br /> I have received the 13 August 2007 letter "Revisions to the Additional Groundwater <br /> Investigation Work Plan, Unifirst Facility,Stockton, California" prepared by Mr. William <br /> Pipes of Geomatrix Consultants. The letter proposes a revised schedule to the Additional <br /> Groundwater Investigation Work Plan dated 15 April 2007. The revised schedule is a result <br /> of an evolving site investigation. The results of groundwater sampling and cone <br /> penetrometer testing shows that delineation could most efficiently be conducted by <br /> expanding the groundwater sampling off-site and including soil vapor sampling on-site. <br /> The expanded investigation necessitates adjusting the initial timetables to accommodate <br /> the additional data collection and analysis. <br /> Regional Water Quality Control Board staff commend UniFirst for recognizing the value of a <br /> comprehensive delineation early in the investigation. This inevitably saves money in the <br /> long run. Therefore, Regional Water Board staff concur with the revised schedule. The <br /> revised schedule proposes that the monitoring wells could be installed by about 15 <br /> November 2007, and a groundwater investigation report could be completed by 31 December <br /> 2007. <br /> Thank you for the notice, and feel free to contact me if any other major variations of the <br /> work plan are necessary. <br /> Amy Terrell <br /> Regional Water Quality Control Board <br /> Central Valley Region <br /> 11020 Sun Center Drive Suite 200 <br /> Rancho Cordova, CA 95670-6114 <br /> (916) 464-4680 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.