Laserfiche WebLink
♦ GRI <br /> GeoRestoration,Inc. 15940 Concord Circle <br /> (408)779-5533 e Fax (408)779-5530 Morgan Hill,CA 95037 <br /> June 18, 2014 <br /> Mr.Dean Wright,P.G. <br /> Site Evaluation and Remediation Unit <br /> San Joaquin Branch <br /> Department of Toxic Substances Control <br /> 8800 Cal Center Drive <br /> Sacramento,CA 95826-3200 <br /> Subject: Preliminary Endangerment Assessment Workplan <br /> Metalsa Structural Products,Inc. <br /> 1550 Industrial Drive <br /> Stockton,California <br /> APN 177-290-05 <br /> Dear Mr.Wright: <br /> GRI has been retained to conduct environmental investigation and documentation associated with a <br /> Preliminary Endangerment Assessment (PEA) for this case. Attached is the PEA workplan <br /> requested in the Corrective Action Consent Agreement for the site. Should DTSC present comments <br /> requiring revisions to the workplan, GRI will submit a revised workplan and add an appendix <br /> containing the response to comments. <br /> If you have any questions,please give me a call. <br /> Sincerely, <br /> GEORESTORATION <br /> Roger D.Dockter,P.G. <br /> Professional Geologist CA#6152 <br /> cc: Raul Ragunton,Metalsa Structural Products,Inc. <br /> Jim Miille,Chemical Solutions,Inc. <br /> Terry McGuinness,Envirosery <br /> File 1163-3 2014 0617 PEA WP 2 <br />