Laserfiche WebLink
Ms. Margaret Lagorio Phase H L .onmental Site Assessment <br /> San Joaquin County PHS-EHD Vacant Lot, 55 East Jamestown Street, Stockton, CA <br /> August 3,2000 Page 3 <br /> • The results of the environmental analyses will be presented in the final ESA report. <br /> SCHEDULE <br /> ATC anticipates that the proposed fieldwork will be conducted within one to two weeks following ATC's <br /> receipt of PHS-EHD approval of the workplan and receipt of the soil boring permits. The analyses will <br /> be conducted on a 2-week turn around time. ATC estimates that a final report will be issued to ATC's <br /> client within two weeks following receipt of all laboratory data. However,this schedule may be impacted <br /> by the availability of subcontractors. ATC will immediately contact PHS-EHD if subcontractor <br /> availability or other issues will impact this schedule. <br /> If you have any questions, please feel free to contact either of the undersigned at 925.460.5300. Thank <br /> you for the opportunity to be of service. <br /> Sincerely, <br /> ATC ASSOCIATES <br /> ol <br /> 1 /Dn� <br /> D. Edward Ma aniel hael Batten, REA <br /> Project Manager or of Environmental Services <br /> Attachments: Figures(Figure 1 —Site Location Map, Figure 2—Proposed Soil Borings) <br /> Site Safety Plan <br /> cc: Mr. George Sagarini, Weberstown East Partnership <br /> File <br /> ATC ASSOCIATES INC. PROJECT NO.75.25502.0001 TASK 2 <br /> JAM ProgresMebberstown East\Phase IPPhase 11 Workplan.doc <br />