My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JAMESTOWN
>
55
>
2900 - Site Mitigation Program
>
PR0516383
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2020 10:18:23 AM
Creation date
2/25/2020 9:16:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516383
PE
2950
FACILITY_ID
FA0012590
FACILITY_NAME
WEBERSTOWN EAST PARTNERSHIP
STREET_NUMBER
55
Direction
E
STREET_NAME
JAMESTOWN
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
10410020
CURRENT_STATUS
01
SITE_LOCATION
55 E JAMESTOWN ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Margaret Lagorio Phase H L .onmental Site Assessment <br /> San Joaquin County PHS-EHD Vacant Lot, 55 East Jamestown Street, Stockton, CA <br /> August 3,2000 Page 3 <br /> • The results of the environmental analyses will be presented in the final ESA report. <br /> SCHEDULE <br /> ATC anticipates that the proposed fieldwork will be conducted within one to two weeks following ATC's <br /> receipt of PHS-EHD approval of the workplan and receipt of the soil boring permits. The analyses will <br /> be conducted on a 2-week turn around time. ATC estimates that a final report will be issued to ATC's <br /> client within two weeks following receipt of all laboratory data. However,this schedule may be impacted <br /> by the availability of subcontractors. ATC will immediately contact PHS-EHD if subcontractor <br /> availability or other issues will impact this schedule. <br /> If you have any questions, please feel free to contact either of the undersigned at 925.460.5300. Thank <br /> you for the opportunity to be of service. <br /> Sincerely, <br /> ATC ASSOCIATES <br /> ol <br /> 1 /Dn� <br /> D. Edward Ma aniel hael Batten, REA <br /> Project Manager or of Environmental Services <br /> Attachments: Figures(Figure 1 —Site Location Map, Figure 2—Proposed Soil Borings) <br /> Site Safety Plan <br /> cc: Mr. George Sagarini, Weberstown East Partnership <br /> File <br /> ATC ASSOCIATES INC. PROJECT NO.75.25502.0001 TASK 2 <br /> JAM ProgresMebberstown East\Phase IPPhase 11 Workplan.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.