Laserfiche WebLink
°P�UI APPLICATION - QUARRY EXCAVATION <br /> N? � SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: QX- <br /> RECLAMATION PLAN <br /> CHECKLIST-CONTINUED <br /> [ ] 8. describe previous mining activity, if any. <br /> G. Air Resources/Climatology: (data available from local U. S.Weather station) <br /> [ ] 1. Include a general description of the climate of the area, including the average rainfall, average snowfall,season of <br /> rainfall, average winter low temperature, average summer high temperature,and the source of the climate data. If the <br /> data were obtained from a weather station, state the location of that station. <br /> [ ] 2. Provide evidence of contact with the Air Pollution Control District regarding the need for Air Quality permits and <br /> monitoring. <br /> [ ] H. Land Use: Describe the current land use(s)of the project site(e.g.,agriculture,timber,open space,recreation,etc.). <br /> [ ] I. Aesthetics: Discuss the visual impact of the proposed mining operation from adjacent vantage points. <br /> ( ] J. Other Information: Include any other information requested by the lead agency to assess the environmental impacts of the <br /> proposed operation. <br /> II. DESCRIPTION OF PROPOSED MINING OPERATION <br /> [X] A. Map of Operationss: On a map, show details of the proposed mining operation including the following applicable features: <br /> property/permit boundaries ore stockpile areas <br /> topsoil stockpile areas tailings ponds <br /> siltation ponds buildings <br /> leach pads pits (slope crest/toe and benches) <br /> haul roads waste/overburden dumps processing facilities <br /> hazardous materials storage areas other pertinent features <br /> [X] B. Production Schedule: Provide a table of estimated annual production of ore/product and overburden/waste. If mining will <br /> be phased, specify quantities by phase. The annual estimated quantities should be summed to give the total anticipated <br /> production for the life of the mine. <br /> [X] C. Mining Plan: A description of how mining will be done, including any or all of the following: <br /> [X] 1. Operating Plan: Provide the proposed initiation and termination dates of the mining operation. If seasonal,provide <br /> the proposed annual months of operation. <br /> 2. Topsoil: Describe: <br /> [X] a. stripping and handling techniques, <br /> [X] b. location and volume of proposed soil stockpiles, <br /> [X] c. how soil stockpiles will be protected from erosion (e.g., revegetated). <br /> 3. Overburden/Waste/Ore: Describe: <br /> [X] a. the proposed type of mine(open pit, quarry, placer,dredge,etc.), <br /> [X] b. the type/size of mining/hauling equipment to be used, <br /> [ ] c. the use,handling,and storage of explosives, <br /> [ ] d. the proposed method for removing overburden and ore, <br /> F:\DEVSVC\Planning Application Forms\ Page 9 of 19 <br /> Quarry Excavation.doc.(Revised 02-03-10) <br />