My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRUELLA
>
23031
>
2200 - Hazardous Waste Program
>
PR0530463
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2020 11:45:20 AM
Creation date
2/25/2020 11:43:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0530463
PE
2221
FACILITY_ID
FA0016723
FACILITY_NAME
JIM SACO JR
STREET_NUMBER
23031
Direction
N
STREET_NAME
BRUELLA
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
00705009
CURRENT_STATUS
01
SITE_LOCATION
23031 N BRUELLA RD
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE HEALTH AND SAFETY PLAN <br />PART <br />GENERAL SITE INFORMATION <br />1. Site Name: Jim Saco Vineyards <br />Address: 23031 N. Bruella Rd. Acampo, CA 95220 <br />Contact Person: Jim Saco No: (209) 993-4684 <br />Sweeps Number: <br />Proposed Date of investigation/inspection: 11-4-11 <br />2. <br />3. <br />Description and brief narrative of inspection activity: <br />❑ New UST installation. <br />❑ UAR Investigation. <br />❑ Tank Closure in Place. <br />❑ Tank/Pipe Repair. <br />❑ Tank/Pipe Removal. <br />❑ Re -excavation. <br />❑ Installation of Borings / Monitoring <br />Wells. <br />® HW inspection <br />❑ Tiered Permit inspection <br />Specific Site Information: <br />Tank No.: <br />Tank Capacity: <br />Tank Content: <br />Tank Age: <br />Other: <br />4. Type of Operation: grower/farmer <br />5. Release History: <br />Evidence of leaks / soil contamination: ❑ YES ❑ NO <br />Documented Groundwater contamination: ❑ YES ❑ NO <br />Background and description of any previous investigation or incidence: <br />6. Potential Health and Safety <br />Physical Concerns: (check all that apply & describe) <br />® Heat or Cold Stress: 95 °F (high ambient temp.) <br />® Noise Sources: traffic, <br />❑ Oxygen Deficiency: <br />❑ Excavation: (falls, trips, slipping, cave-ins): <br />❑ Handling and Transfer of a Hazardous Substance: (fire, explosions, <br />etc..): <br />❑ Confined space entry: (explosions): <br />❑ Heavy equipment (physical injury & trauma resulting from moving <br />❑ Other, specify <br />7. Anticipated Biological Hazards: <br />❑ Snakes ® Insects ❑ Rodents ❑ Poisonous Plants <br />❑ Other/Unknown (specify): <br />8. Narrative (provide all information which could impact Health and Safety, <br />e.g., power lines, integrity of dikes, terrain, etc.) <br />EH 23081(12/17/2002) <br />PART II <br />EVALUATION OF POTENTIAL HAZARDS <br />1. Chemicals Hazards <br />® Carcinogens: oil, fuel <br />® Corrosives: lead acid batteries <br />❑ Dusts: <br />❑ Explosives: <br />®Flammables: oil, fuel <br />❑ Inorganic Gases: <br />❑ Metals: <br />❑ Oxidizers: <br />❑ PCB's: <br />® Other: contaminated absorbent, pesticides, fertilizers. <br />PART III <br />REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br />1. Monitoring Equipment (note: Monitoring instruments must be used for all <br />operations unless appropriate rationale or restrictions are provided) <br />❑ Combustible Gas/Oxygen Meter. <br />❑ Detector Tubes (Specify). <br />❑ Photo ionization Detector. <br />❑ Organic Vapor Analyzer. <br />❑ Other, specify. <br />If monitoring instruments are not used, rationale or activity / area restrictions: <br />2. Personal Protective Equipment <br />Level of Protection: ❑ A ❑ B ❑ C ® D <br />® Hard Hat. <br />® Safety Glasses/goggles. <br />® Steel toed/shank shoes or boots. <br />❑ Flame retardant coveralls. <br />® Hearing protection. <br />❑ Tyvek. <br />❑ Respirator: ❑ APR ❑ SCBA <br />A/P cartridge: <br />® Safety vest. <br />❑ Two-way communication. <br />PART IV - PLAN APPROVAL <br />Plan Prepared by: Aris Cacapit f Date: 11*l <br />Plan Approved by: kIV Date: l� <br />
The URL can be used to link to this page
Your browser does not support the video tag.