Laserfiche WebLink
CLIENT: <br />PLUMBING bp <br />SYMBOL ABBREVIATIONDESCRIPTION <br />CW COLD WATER PIPING <br />HW HOT WATER PIPING (1407) <br />HWR HOT WATER RETURN PIPING <br />SS OR W SOIL OR WASTE PIPING BELOW GRADE <br />SS OR W SOIL OR WASTE PIPING ABOVE GRADE <br />— — — V VENT PIPING <br />GW GW GREASE WASTE DRAIN PIPING <br />CD CD CONDENSATE DRAIN PIPING <br />D ID INDIRECT DRAIN PIPING <br />�— WHA WATER HAMMER ARRESTOR ARCOP.O.C. POINT—OF---CONNECTION <br />—�Ip�7— GAS COCK WITH UNION BP WEST COAST PRODUCTS, LLC <br />CAPPED <br />UNION V H A V <br />—'' UP PIPE UP <br />DN PIPE DOWN <br />-- DN PIPE TEE DOWN mdo <br />BV BALL VALVE <br />_ Z � <br />CV CHECK VALVE kp�'<�,� <br />-� RED REDUCER NG ENG`rN� <br />PUMP <br />18215 72ND AVENUE SOUTH <br />FCO/GCO FLOOR CLEANOUT OR GRADE CLEANOUT KENT, WA 98032 <br />(425)251-6222 <br />WCO WALL CLEANOUT (425)251-8782 FAX <br />AFF ABOVE FINISHED FLOOR CIVIL ENGINEERING, LAND PLANNING, <br />SURVEYING, ENVIRONMENTAL SERVICES <br />BFF BELOW FINISHED FLOOR <br />BG BELOW GROUND NO. DATE REVISION DESCRIPTION <br />0 12/08/17 UT SET <br />Pk <br />(E) EXISTING 1 <br />(N) NEW 2 <br />NTS NOT TO SCALE a <br />IE INVERT ELEVATION 4 <br />5 <br />QTY. QUANTITY Q <br />V.I.F. VERIFY IN FIELD Q <br />FU FIXTURE UNIT Q <br />0 <br />MATERIAL SPECIFICATIONS „ <br />SEAL: <br />w w w <br />a- <br />LLJ <br />CL <br />OmU U <br />f- <br />-� � O _I Y <br />LIJ Li <br />SERVICES QoQ� �o cL Q ` �AOli�sS <br />Uz CD V) Cccn � � � REMARKS � <br />COLD ABOVE GROUND <br />WATER BELOW GROUND <br />HOT ABOVE GROUND <br />WATER BELOW GROUND • i <br />WASTE ABOVE GROUND . ! <br />BELOW GROUND • <br />VENT ABOVE GROUND • <br />BELOW GROUND • <br />INDIRECT INDOOR <br />WASTE OUTDOOR <br />NATURAL INDOOR • PAINTED WITH RUST <br />rDR <br />S OUTDOOR . INHIBITING PAINT DEVELOPMENT INFORMATION: <br />RM ABOVE GROUND • <br />AIN BELOW GROUND ARCO NTI <br />ABOVE GROUND • AM/IPMCO2 SILVER BRAZED; <br />NITROGEN PURGED FUEL CANOPY w/ 8 MPD's <br />CO2 VENT ABOVE GROUND SILVER BRAZED; <br />NITROGEN PURGED <br />SITE ADDRESS: <br />DRAWING SCHEDULE <br />SHEET NUMBER DESCRIPTION <br />PO.1 <br />LEGEND, <br />NOTES & SCHEDULES <br />PO.2 <br />NOTES & <br />SCHEDULES <br />PO.3 <br />SPECIFICATIONS <br />P2.0 <br />SANITARY <br />& VENT PLUMBING PLAN <br />P3.0 <br />WATER PLUMBING <br />PLAN <br />P4.0 <br />PLUMBING <br />ROOF PLAN <br />P5.0 <br />P6.0 <br />PLUMBING <br />DETAILS -- I <br />P6.1 <br />PLUMBING <br />DETAILS -- II <br />P6.2 <br />PLUMBING <br />DETAILS - III <br />Abossein <br />Engineering, <br />.C. <br />MECHANICAL — ELECTRICAL <br />CIVIL — LEED <br />FIRE PROTECTION <br />18465 NE 681H ST <br />REDIVOND, WA 98052 <br />PH: (425) 462-9441 <br />LAX: (425) 462-9451 <br />E—Mail: cserviceftossein,com <br />www.cbossein.com <br />NWC CHEROKEE RD <br />@ NEWTON RD <br />SAN JOAQUIN COUNTY, CALIFORNIA <br />FACILITY # TBD <br />DESIGNED BY: <br />AWANCE ZKW: <br />OEM BY <br />BP REPM: <br />DRAWN BY: <br />ALIJANCE PM: <br />VERSION: <br />PRO.ECT NO. <br />18068 <br />UKAIAANG 'HU- : <br />LEGEND, NOTES, <br />& SCHEDULES <br />SHEET NO. <br />P0. 1 <br />