ELECTRIC WATER HEATER SIZING
<br />FIXT. ID
<br />QTY
<br />DESCRIPTION
<br />DEMAND
<br />TOTAL
<br />LV -1
<br />3
<br />LAVATORY
<br />5 GPH
<br />15 GPH
<br />C16A
<br />G7
<br />G9E
<br />3
<br />1
<br />1
<br />HANDSINK
<br />MOP SINK
<br />3 -COMPARTMENT SINK
<br />5 GPH
<br />15 GPH
<br />15 GPH
<br />15 GPH
<br />PER PDI STANDARD PDI -WH 201
<br />WHA -C
<br />45 GPH 45 GPH
<br />SUBTOTAL = 90 GPH
<br />DEMAND FACTOR: 0.4
<br />HOT WATER DEMAND: 0.4 X 90 GPH - 36 GPH
<br />ENERGY INPUT CALCULATIONS: 36 GPH X 0.149 - 5.4 KW
<br />MODEL A.O. SMITH, DVE-52-12
<br />RECOVERY RATE 74 GPH @ 1007 TEMPERATURE RISE
<br />ELECTRICAL INPUT 12 KW
<br />STORAGE 50 GALLONS
<br />CAPACITY
<br />FIXTURE UNITS CALCULATIONS
<br />FIXT IDWATER PIPING WASTE PIPING
<br />(ITEM) QTY DESCRIPTION F.U.PER TOTAL TOTAL F.U.PER TOTAL
<br />FIXTURE CW F.U. HW F.U. FIXTURE 5S F.U.
<br />PLUMBING FIXTURES
<br />WC -1
<br />WATER
<br />HAMMER
<br />ARRESTER
<br />3
<br />LAVATORY
<br />SCHEDULE
<br />MARK
<br />MANUFACTURER/ FIXTURE
<br />MODEL #
<br />UNITS INLET SIZE
<br />REMARKS
<br />WHA -A
<br />PPP SC -500 1-1
<br />1 112"
<br />PER PDI STANDARD PDI -WH 201
<br />WHA -B
<br />PPP SC -750 12-32 3/4"
<br />PER PDI STANDARD PDI -WH 201
<br />WHA -C
<br />PPP SC -1000 33-60
<br />1"
<br />PER PDI STANDARD PDI ---WH 201
<br />FIXTURE UNITS CALCULATIONS
<br />FIXT IDWATER PIPING WASTE PIPING
<br />(ITEM) QTY DESCRIPTION F.U.PER TOTAL TOTAL F.U.PER TOTAL
<br />FIXTURE CW F.U. HW F.U. FIXTURE 5S F.U.
<br />PLUMBING FIXTURES
<br />WC -1
<br />3
<br />WATER CLOSET (FLUSH TANK)
<br />LV -1
<br />3
<br />LAVATORY
<br />A1C
<br />1
<br />CAPPUCCINO MACHINE (3 HEADS)
<br />A10
<br />2
<br />DUAL SOFT HEAT BREWER
<br />B1A
<br />2
<br />FROZEN BEVERAGE DISPENSER
<br />132A
<br />1
<br />FOUNTAIN ICE MAKER (CUBED)
<br />132B
<br />1
<br />FOUNTAIN ICE MAKER (NUGGET)
<br />B12
<br />1
<br />20 -VALVE ICE/BEVERAGE DISPENSER
<br />G6
<br />1
<br />ICE MAKER
<br />G6C
<br />1
<br />ICE MAKER CONDENSER
<br />G7
<br />1
<br />MOP SINK
<br />G9B
<br />1
<br />3 -COMP SINK
<br />G9E
<br />1
<br />PRE -RINSE FAUCET
<br />G16A
<br />5
<br />G16
<br />3
<br />HAND SINK
<br />G54
<br />1
<br />CARBONATOR
<br />FD -1
<br />5
<br />FLOOR DRAIN
<br />2
<br />FS -1
<br />4
<br />FLOOR SINK
<br />-
<br />-
<br />_
<br />HB -1
<br />2
<br />HOSE BIBB
<br />2.
<br />1
<br />0.
<br />0.
<br />0.
<br />0.
<br />0.
<br />5
<br />5
<br />5
<br />7.5
<br />-
<br />4
<br />12
<br />0.5
<br />3
<br />3
<br />1
<br />3
<br />5
<br />0.5
<br />-
<br />0.5
<br />0.5
<br />5
<br />1
<br />-
<br />0.5
<br />1
<br />5
<br />0.5
<br />-
<br />0.5
<br />0.5
<br />3
<br />0.5
<br />-
<br />0.5
<br />0.5
<br />0.5
<br />-
<br />05
<br />0 5
<br />TOTAL 31 14 51.5
<br />1. WATER SUPPLY FIXTURE UNITS ARE BASED ON UPC, CHAPTER -6 TABLE 6-5.
<br />2. DRAINAGE FIXTURE UNITS ARE BASED ON UPC, CHAPTER -7 TABLE 7-3.
<br />GENERAL NOTES
<br />1 PLUMBING CONTRACT DRAWINGS ARE IN PART DIAGRAMMATIC, COVERING THE SCOPE OF WORK AND
<br />GENERAL ARRANGEMENT OF THE EQUIPMENT, PIPING, ETC., AND THE APPROXIMATE SIZE OF EQUIPMENT
<br />AND MATERIALS. THE CONTRACTOR SHALL FOLLOW THESE DRAWINGS IN LAYING OUT THE PLUMBING WORK.
<br />PLUMBING CONTRACTOR SHALL. CONSULT GENERAL, SPRINKLER, HEATING/VENTILATING/AIR CONDITIONING
<br />CONTRACT AND ELECTRICAL DRAWINGS TO FAMILIARIZE HIMSELF WITH THAT WORK AND TO VERIFY THE
<br />SPACES IN WHICH THE PLUMBING WORK WILL BE INSTALLED.
<br />2 BECAUSE OF THE NATURE AND SCALE OF THE DRAWINGS, CERTAIN BASIC PLUMBING ITEMS SUCH AS
<br />UNIONS, FITTINGS, ELBOWS, ETC., MAY NOT BE SHOWN. WHERE SUCH ITEMS ARE REQUIRED BY OTHER
<br />SECTIONS OF THE SPECIFICATIONS, OR WHERE THEY ARE REQUIRED BY THE NATURE OF THE WORK OR BY
<br />CODES AND REGULATIONS, THEY SHALL BE FURNISHED AND INSTALLED AT NO ADDITIONAL C05T TO THE
<br />OWNER. THE DRAWINGS INDICATE GENERAL LOCATIONS OF PIPING, EQUIPMENT, DUCTWORK AND
<br />SIMILAR. THE EXACT LOCATION TO BE DETERMINED BY THE CONTRACTOR TO BEST FIT THE LAYOUT OF
<br />THE JOB.
<br />3 ALL EQUIPMENT SHALL BE TIGHTLY COVERED AND PROTECTED AGAINST DIRT, WATER, AND CHEMICAL OR
<br />MECHANICAL INJURY OR THEFT. PLUMBING FIXTURES SHALL BE COVERED WITH HEAVY PAPER COVERINGS
<br />AFTER INSTALLATION AND SHALL BE THOROUGHLY CLEANED AFTER COMPLETION OF THE PROJECT.
<br />4 ALL MATERIALS SUCH AS VALVES, FITTINGS, PIPING, EQUIPMENT, PUMPS, COILS, ETC., SHALL BE
<br />PROPERLY PROTECTED, AND ALL PIPING OPENINGS SHALL BE TEMPORARILY CLOSED CONTRACTOR
<br />BY THE CONT
<br />FOR THE WORK UNDER HIS CHARGE, ON A DAILY BASIS, AT THE END OF EACH BY
<br />DAY, T AS TO
<br />PREVENT OBSTRUCTION AND DAMAGE. THE ABOVE REQUIREMENTS ARE MANDATORY.
<br />5 THE CONTRAC70R SHALL SEE THAT ALL MATERIALS, INSTALLATION AND WORKMANSHIP IS PERFORMED IN
<br />ACCORDANCE WITH THE LATEST EDITION OF ALL APPLICABLE CODES, LAWS, OR ORDINANCES OF THE STATE,
<br />AND ALL COUNTY AND LOCAL CITY CODES OR ORDINANCES, INCLUDING ALL STATE OR LOCAL BOARD OF
<br />HEALTH, FEDERAL AND STATE ENVIRONMENTAL PROTECTION REGULATIONS,
<br />STATE ENERGY CODES AND UTILITY REGULATORY AGENCIES.
<br />6 ALL WORK SHALL BE FURTHER PERFORMED IN ACCORDANCE WITH THE NATIONAL BOARD OF FIRE
<br />UNDERWRITERS, THE PLUMBING AND BUILDING CODES, NATIONAL ELECTRICAL. CODE, THE
<br />OCCUPATIONAL SAFETY AND HEALTH ACT, THE AMERICAN GAS ASSOCIATION, AND ALL SUCH OTHER
<br />SPECIFIC CODIES AS MAY BE REFERRED TO IN THE INDIVIDUAL SECTIONS OF THE SPECIFICATIONS.
<br />7 PIPE SIZES SHOWN ON THE DRAWINGS ARE THE MINIMUM SIZES ALLOWED REGARDLESS OF THE CODE
<br />MINIMUM, EXCEPT WHEN THE CODE MINIMUM SIZE IS LARGER THAN THAT SHOWN.
<br />8 THE CONTRACTOR SHALL MAINTAIN A CURRENT SET OF CONTRACT PRINTS ON THE CONSTRUCTION SITE AT
<br />ALL TIMES, ON WHICH HE SHALL ACCURATELY RECORD THE ACTUAL INSTALLATION OF ALL PLUMBING WORK.
<br />AS WORK PROGRESSES, MARK CHANGES MADE WHETHER RESULTING FROM JOB CONDITIONS, ADDENDA,
<br />FORMAL CHANGE ORDERS OR OTHER INSTRUCTIONS ISSUED BY THE ENGINEER,
<br />9 THE PLUMBING CONTRACTOR SHALL INDICATE PROGRESS 8Y COLORING IN VARIOUS PIPES, FIXTURES, AND
<br />ASSOCIATED APPURTENANCES EXACTLY AS THEY ARE ERECTED AND INSTALLED.
<br />10 MARK ALL PIPE SIZES AND LOCATIONS DURING CONSTRUCTION. ALSO, MARK LOCATIONS OF ALL VALVES
<br />AND VARIOUS (EQUIPMENT, APPARATUS, AND ASSOCIATED APPURTENANCES AS ERECTED WEEKLY DURING
<br />CONSTRUCTION..
<br />11 AT THE COMPLETION OF THE JOB THESE PRINTS, INCORPORATING CHANGES, ADDENDA AND ADDED DATA
<br />NOTED ON MARKED -UP PRINTS, INCLUDING DIMENSIONED LOCATIONS OF UNDERGROUND PIPING BEYOND
<br />LIMITS OF BUILDING, SHALL BE SUBMITTED TO THE ENGINEER FOR FINAL REVIEW AND COMMENT, THE
<br />PRINTS WILL BE RETURNED WITH APPROPRIATE COMMENTS AND RECOMMENDATIONS. THESE CORRECTED
<br />PRINTS TOGETHER WITH CORRELATED PRINTS INDICATING ALL THE REVISIONS, ADDITIONS AND DELETIONS
<br />OF WORK, SHALL FORM THE BASIS FOR PREPARING A SET OF RECORD DRAWINGS.
<br />12 WHERE PIPING, AND OTHER PLUMBING APPURTENANCES PASS THROUGH FIRE PARTITIONS, FIRE WALLS, OR
<br />FLOORS, INSTALL A FIRE -STOP THAT PROVIDES AN EFFECTIVE BARRIER AGAINST THE SPREAD OF FIRE,
<br />SMOKE AND GASES. FIRE -STOP MATERIAL SHALL BE UL APPROVED, PACKED TIGHT AND COMPLETELY FILL
<br />CLEARANCES BETWEEN RACEWAYS AND OPENINGS. FLOOR, EXTERIOR WALL, AND ROOF SEALS SHALL ALSO BE
<br />MADE WATERTIGHT AS APPROVED BY THE ADMINISTRATIVE AUTHORITY.
<br />13 ARRANGE AND INSTALL PIPING APPROXIMATELY AS INDICATED, STRAIGHT, PLUMB AND AS DIRECT AS
<br />POSSIBLE, FORM RIGHT ANGLES OR PARALLEL LINES WITH BUILDING WALLS. KEEP PIPES CLOSE TO
<br />WALLS, PARTITIONS AND CEILINGS, OFFSETTING ONLY WHERE NECESSARY TO FOLLOW WALLS AND AVOID
<br />INTERFERENCE WITH OTHER MECHANICAL ITEMS. LOCATE GROUPS OF PIPES PARALLEL TO EACH OTHER;
<br />SPACE THEM AT A DISTANCE TO PERMIT ACCESS FOR SERVICING VALVES.
<br />14 WATER PIPING SHALL BE PITCHED TO POINTS OF DRAINAGE WITH CONSTANT UNIFORM SLOPE,
<br />15 INSTALL HORIZONTAL PIPING AS HIGH AS POSSIBLE WITHOUT SAGS OR HUMPS.
<br />16 GRADE DRAINAGE AT UNIFORM SLOPE OF NOT LESS THAN 1/4" PER FOOT TOWARD THE POINT OF DISPOSAL.
<br />WHEN APPROVED BY ADMINISTRATIVE AUTHORITY, PIPE SIZE 4" AND LARGER MAY HAVE A SLOPE OF NOT LESS
<br />THAN 1/8" PER FOOT.
<br />17 WHERE CHANGES IN PIPE SIZES OCCUR, USE ONLY REDUCING FITTINGS.
<br />18 FOR DRAINAGE PIPING CHANGES IN DIRECTION, USE LONG SWEEP WHERE POSSIBLE, OTHERWISE, SHORT
<br />SWEEP 1/4 BENDS, OR COMBINATION WYE AND 1/8 BENDS; USE SANITARY TEE BRANCHES ONLY FOR
<br />HORIZONTAL BRANCHES DISCHARGING TO STACKS.
<br />19 INSTALL SECTIONALISING VALVES AND ON EACH BRANCH LINE TO MULTI -FIXTURE GROUPS. LOCATE VALVES IN A
<br />READILY ACCESSIBLE LOCATION, DO NOT CONCEAL. DO NOT LOCATE VALVE SYSTEMS BELOW HORIZONTAL UNLESS
<br />INDICATED ON PLANS. LOCATE ANGLE STOP VALVES BELOW THE SINK OR WATER CLOSET,
<br />20 WATER SUPPLY TO ALL FIXTURES AND CONTAINERS SHALL BE SO INSTALLED AS TO PREVENT POSSIBLE
<br />BACK SIPHONAGE OF POLLUTED WATER. ALL SUPPLIES SHALL BE EITHER ABOVE THE FLOOD RIM OF THE
<br />FIXTURE OR SEPARATED FROM THE DRAINAGE END BY MEANS OF AN APPROVED VACUUM BREAKERS.
<br />21 PROVIDE PIPING AND FIXTURE TRAPS. CONNECT TO FIXTURES AND OTHER EQUIPMENT INDICATED OR
<br />SPECIFIED AS REQUIRING SOIL, WASTE, DRAIN AND VENT FACILITIES,
<br />22 LAY ALL PIPING TRUE TO LINE AND GRADE, FIT ENDS TOGETHER, MATCH SO THAT SEWER OR DRAIN WILL
<br />HAVE SMOOTH AND UNIFORM INSERT. FOLLOW LOCATIONS AND ELEVATIONS AT SITE. AS THE PIPE
<br />WORK STOPPAGE PERIODS, RPROVIDE EFPIPE F ECTIVOR OE PLUGS OR DIRT,F CEMENT, AND
<br />FOR EOPEN EDS OFR FOREIGN PIPE SAND DRIP NS.
<br />23 PROVIDE CLEANOUTS WHERE INDICATED AND AT INTERVALS OF 100' OR AS REQUIRED BY LOCAL PLUMBING
<br />CODE AND WHERE REQUIRED AT CHANGES OF DIRECTIONS OF SOIL AND WASTE STACKS. INSTALL
<br />CLEANOUTS SO AS TO BE ACCESSIBLE FOR EASY REMOVAL AND TO PROVIDE CLEARANCE FOR RODDING.
<br />CLEANOUTS SHALL BE THE SAME SIZE AS PIPE SERVED EXCEPT THAT NO CLEANOUT NEED BE LARGER THAN
<br />FOUR INCHES.
<br />24 EXTEND VENT PIPES 12 INCHES ABOVE ROOF AND 1OFT MINIMUM AWAY FROM ANY FRESH AIR INTAKES
<br />AND AT LEAST 48 INCHES AWAY FROM A PARAPET WALL.
<br />25 SANITARY VENT PIPING SHALL BE GRADED SO THAT THE AIRFLOW TO THE OUTSIDE WILL BE CONTINUOUSLY
<br />UPWARD AND SO THAT NO LOW POINTS WILL BE DRAINED.
<br />26 MAKE TIGHT CONNECTION BETWEEN WATER CLOSET FLANGES AND EARTHENWARE FIXTURE BY MEANS OF
<br />AN APPROVED MOLDED WAX RING OR SETTING COMPOUND AND BOLTING.
<br />27 VENTS: PROVIDE FLASHING FOR STACKS PASSING THROUGH ROOF. MAKE WATER -TIGHT AT ROOF. DO NOT
<br />LOCATE VENT THROUGH ROOF LESS THAN 24 INCHES FROM A PARAPET WALL.
<br />28 ALL PLUMBING FIXTURES AND PIPING ARE TO BE LISTED BY AN APPROVED LISTING AND TESTING AGENCY
<br />AND PROPERLY LABELED.
<br />29 COORDINATE ALL LOCATIONS, SIZES, AND ELEVATIONS OF ALL SLEEVES THROUGH WALLS, BEAMS, SLABS AND
<br />FOOTING WITH STRUCTURAL AND ARCHITECTURAL DRAWINGS. ALL PIPES SLEEVING THROUGH FOOTINGS SHALL
<br />HAVE A SLEEVE DIAMETER OF TWO PIPE SIZES OVER THE PIPE PASSING THROUGH THE FOOTING. NO PIPE TO
<br />BE PLACED THROUGH FOOTING UNLESS APPROVED BY THE STRUCTURAL ENGINEER,
<br />30 ALL PIPES SHALL B'E PROTECTED AT THE POINT THEY CROSS BUILDING EXPANSION JOINT,
<br />EITHER WITH AN EXPANSION FITTINGS OR IN ANOTHER MANNER ACCEPTABLE TO THE ENGINEER.
<br />31 PLUMBING CONTRACTOR SHALL CONNECT ALL GAS PIPING TO ALL GAS RELATED UNITS PER PLAN WITH LISTED
<br />AND APPROVED GAS SHUT-OFF VALVE, SEDIMENT TRAP, AND UNION.
<br />32 FAUCET CONTROLS SHALL BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING,
<br />PINCHING, OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER
<br />THAN 5 POUNDS.
<br />33 PENETRATION OF FLOOR/CEILING ASSEMBLIES AND ASSEMBLIES REQUIRED TO HAVE A FIRE -RESISTANCE
<br />RATING SHALL BE PROTECTED IN ACCORDANCE WITH THE BUILDING CODE.
<br />34 WHERE WATER PRESSURE WITHIN A BUILDING EXCEEDS 80 PSI, AN APPROVED WATER -PRESSURE REDUCING
<br />VALVE CONFORMING TO ASSE 1003 WITH STRAINER SHALL BE INSTALLED TO REDUCE THE PRESSURE IN THE
<br />BUILDING WATER DISTRIBUTION PIPING TO 80 PSI STATIC OR LESS.
<br />35 DISINFECTION OF POTABLE WATER SYSTEM SHALL COMPLY WITH THE LOCAL AND THE STATE PLUMBING
<br />CODE,
<br />36 PROPER ACCESS MUST BE PROVIDED FOR THE TESTING AND MAINTENANCE OF THE BACKFLOW PREVENTER.
<br />IF THE BACKFLOW PREVENTER IS INSTALLED MORE THAN 5'-0" ABOVE THE FLOOR, SPECIAL PROVISIONS
<br />MUST BE MADE.
<br />37 PROVIDE AND INSTALL A SINGLE GAS ISOLATION VALVE FOR THE MULTIPLE GAS METER BANKS FOR
<br />THE ENTIRE BLDG.
<br />38 ALL PIPING SHALL MAINTAIN AT LEAST 5'-0" CLEARANCE IN FRONT OF THE HVAC SUPPLY AND RETURN
<br />OPENINGS,
<br />39 PLASTIC PIPES ARE NOT PERMITTED TO BE INSTALLED WITHIN THE AIR PLENUM SPACE.
<br />40 HUNG WASTE PIPING 'SHALL BE STRUCTURALLY SUPPORTED AS TIGHT AS POSSIBLE BELOW THE
<br />STRUCTURAL BEAMS TO GAIN MORE HEAD SPACE AS IT PITCH TOWARDS THE LOWEST POINT TO
<br />KEEP WASTE PIPING WITHIN THE CEILING SPACE.
<br />41 CONTRACTOR TO PROVIDE AND INSTALL QUICK DISCONNECT GAS LINES AT ALL COOKING EQUIPMENT.
<br />42 NO NON-METALLIC PIPING IS ALLOWED WITHIN THE RETURN -AIR PLENUMS.
<br />Abossein
<br />Engineering,
<br />L. Le C
<br />MECHANICAL - ELECTRICAL
<br />CIVIL - LEED
<br />FIRE PROTECTION
<br />18465 NE 68TH ST
<br />REDMOU, INA 98052
<br />PH: (425) 462-9441
<br />FAX: (425) 462-9451
<br />E -Mail: cservice@abossein.corn
<br />www.(ibossein.com
<br />BOSSEIN #218022
<br />CLIENT:
<br />AO&
<br />IF
<br />ARCO
<br />BP WEST COAST PRODUCTS, LLC
<br />18215 72ND AVENUE SOUTH
<br />KENT, WA 98032
<br />(425)251-6222
<br />(425)251-8782 FAX
<br />CML ENGINEERING, LAND PLANNING,
<br />SURVEYING, EWRONMENTAL SERVICES
<br />AWANCE Zdd M:
<br />ofou BY
<br />BP M.
<br />DRAWN BY:
<br />0.5
<br />0.5
<br />-
<br />0.5
<br />0.5
<br />`
<br />-
<br />-
<br />0.5
<br />0.5
<br />0.5
<br />0.5
<br />-
<br />-
<br />_
<br />3
<br />3
<br />3
<br />3
<br />3
<br />3
<br />3
<br />3
<br />3
<br />3
<br />2
<br />2
<br />2
<br />2
<br />2
<br />1
<br />3
<br />3
<br />2
<br />6
<br />5
<br />-
<br />0.5
<br />0.5
<br />T24
<br />28
<br />2
<br />8
<br />-
<br />-
<br />_
<br />TOTAL 31 14 51.5
<br />1. WATER SUPPLY FIXTURE UNITS ARE BASED ON UPC, CHAPTER -6 TABLE 6-5.
<br />2. DRAINAGE FIXTURE UNITS ARE BASED ON UPC, CHAPTER -7 TABLE 7-3.
<br />GENERAL NOTES
<br />1 PLUMBING CONTRACT DRAWINGS ARE IN PART DIAGRAMMATIC, COVERING THE SCOPE OF WORK AND
<br />GENERAL ARRANGEMENT OF THE EQUIPMENT, PIPING, ETC., AND THE APPROXIMATE SIZE OF EQUIPMENT
<br />AND MATERIALS. THE CONTRACTOR SHALL FOLLOW THESE DRAWINGS IN LAYING OUT THE PLUMBING WORK.
<br />PLUMBING CONTRACTOR SHALL. CONSULT GENERAL, SPRINKLER, HEATING/VENTILATING/AIR CONDITIONING
<br />CONTRACT AND ELECTRICAL DRAWINGS TO FAMILIARIZE HIMSELF WITH THAT WORK AND TO VERIFY THE
<br />SPACES IN WHICH THE PLUMBING WORK WILL BE INSTALLED.
<br />2 BECAUSE OF THE NATURE AND SCALE OF THE DRAWINGS, CERTAIN BASIC PLUMBING ITEMS SUCH AS
<br />UNIONS, FITTINGS, ELBOWS, ETC., MAY NOT BE SHOWN. WHERE SUCH ITEMS ARE REQUIRED BY OTHER
<br />SECTIONS OF THE SPECIFICATIONS, OR WHERE THEY ARE REQUIRED BY THE NATURE OF THE WORK OR BY
<br />CODES AND REGULATIONS, THEY SHALL BE FURNISHED AND INSTALLED AT NO ADDITIONAL C05T TO THE
<br />OWNER. THE DRAWINGS INDICATE GENERAL LOCATIONS OF PIPING, EQUIPMENT, DUCTWORK AND
<br />SIMILAR. THE EXACT LOCATION TO BE DETERMINED BY THE CONTRACTOR TO BEST FIT THE LAYOUT OF
<br />THE JOB.
<br />3 ALL EQUIPMENT SHALL BE TIGHTLY COVERED AND PROTECTED AGAINST DIRT, WATER, AND CHEMICAL OR
<br />MECHANICAL INJURY OR THEFT. PLUMBING FIXTURES SHALL BE COVERED WITH HEAVY PAPER COVERINGS
<br />AFTER INSTALLATION AND SHALL BE THOROUGHLY CLEANED AFTER COMPLETION OF THE PROJECT.
<br />4 ALL MATERIALS SUCH AS VALVES, FITTINGS, PIPING, EQUIPMENT, PUMPS, COILS, ETC., SHALL BE
<br />PROPERLY PROTECTED, AND ALL PIPING OPENINGS SHALL BE TEMPORARILY CLOSED CONTRACTOR
<br />BY THE CONT
<br />FOR THE WORK UNDER HIS CHARGE, ON A DAILY BASIS, AT THE END OF EACH BY
<br />DAY, T AS TO
<br />PREVENT OBSTRUCTION AND DAMAGE. THE ABOVE REQUIREMENTS ARE MANDATORY.
<br />5 THE CONTRAC70R SHALL SEE THAT ALL MATERIALS, INSTALLATION AND WORKMANSHIP IS PERFORMED IN
<br />ACCORDANCE WITH THE LATEST EDITION OF ALL APPLICABLE CODES, LAWS, OR ORDINANCES OF THE STATE,
<br />AND ALL COUNTY AND LOCAL CITY CODES OR ORDINANCES, INCLUDING ALL STATE OR LOCAL BOARD OF
<br />HEALTH, FEDERAL AND STATE ENVIRONMENTAL PROTECTION REGULATIONS,
<br />STATE ENERGY CODES AND UTILITY REGULATORY AGENCIES.
<br />6 ALL WORK SHALL BE FURTHER PERFORMED IN ACCORDANCE WITH THE NATIONAL BOARD OF FIRE
<br />UNDERWRITERS, THE PLUMBING AND BUILDING CODES, NATIONAL ELECTRICAL. CODE, THE
<br />OCCUPATIONAL SAFETY AND HEALTH ACT, THE AMERICAN GAS ASSOCIATION, AND ALL SUCH OTHER
<br />SPECIFIC CODIES AS MAY BE REFERRED TO IN THE INDIVIDUAL SECTIONS OF THE SPECIFICATIONS.
<br />7 PIPE SIZES SHOWN ON THE DRAWINGS ARE THE MINIMUM SIZES ALLOWED REGARDLESS OF THE CODE
<br />MINIMUM, EXCEPT WHEN THE CODE MINIMUM SIZE IS LARGER THAN THAT SHOWN.
<br />8 THE CONTRACTOR SHALL MAINTAIN A CURRENT SET OF CONTRACT PRINTS ON THE CONSTRUCTION SITE AT
<br />ALL TIMES, ON WHICH HE SHALL ACCURATELY RECORD THE ACTUAL INSTALLATION OF ALL PLUMBING WORK.
<br />AS WORK PROGRESSES, MARK CHANGES MADE WHETHER RESULTING FROM JOB CONDITIONS, ADDENDA,
<br />FORMAL CHANGE ORDERS OR OTHER INSTRUCTIONS ISSUED BY THE ENGINEER,
<br />9 THE PLUMBING CONTRACTOR SHALL INDICATE PROGRESS 8Y COLORING IN VARIOUS PIPES, FIXTURES, AND
<br />ASSOCIATED APPURTENANCES EXACTLY AS THEY ARE ERECTED AND INSTALLED.
<br />10 MARK ALL PIPE SIZES AND LOCATIONS DURING CONSTRUCTION. ALSO, MARK LOCATIONS OF ALL VALVES
<br />AND VARIOUS (EQUIPMENT, APPARATUS, AND ASSOCIATED APPURTENANCES AS ERECTED WEEKLY DURING
<br />CONSTRUCTION..
<br />11 AT THE COMPLETION OF THE JOB THESE PRINTS, INCORPORATING CHANGES, ADDENDA AND ADDED DATA
<br />NOTED ON MARKED -UP PRINTS, INCLUDING DIMENSIONED LOCATIONS OF UNDERGROUND PIPING BEYOND
<br />LIMITS OF BUILDING, SHALL BE SUBMITTED TO THE ENGINEER FOR FINAL REVIEW AND COMMENT, THE
<br />PRINTS WILL BE RETURNED WITH APPROPRIATE COMMENTS AND RECOMMENDATIONS. THESE CORRECTED
<br />PRINTS TOGETHER WITH CORRELATED PRINTS INDICATING ALL THE REVISIONS, ADDITIONS AND DELETIONS
<br />OF WORK, SHALL FORM THE BASIS FOR PREPARING A SET OF RECORD DRAWINGS.
<br />12 WHERE PIPING, AND OTHER PLUMBING APPURTENANCES PASS THROUGH FIRE PARTITIONS, FIRE WALLS, OR
<br />FLOORS, INSTALL A FIRE -STOP THAT PROVIDES AN EFFECTIVE BARRIER AGAINST THE SPREAD OF FIRE,
<br />SMOKE AND GASES. FIRE -STOP MATERIAL SHALL BE UL APPROVED, PACKED TIGHT AND COMPLETELY FILL
<br />CLEARANCES BETWEEN RACEWAYS AND OPENINGS. FLOOR, EXTERIOR WALL, AND ROOF SEALS SHALL ALSO BE
<br />MADE WATERTIGHT AS APPROVED BY THE ADMINISTRATIVE AUTHORITY.
<br />13 ARRANGE AND INSTALL PIPING APPROXIMATELY AS INDICATED, STRAIGHT, PLUMB AND AS DIRECT AS
<br />POSSIBLE, FORM RIGHT ANGLES OR PARALLEL LINES WITH BUILDING WALLS. KEEP PIPES CLOSE TO
<br />WALLS, PARTITIONS AND CEILINGS, OFFSETTING ONLY WHERE NECESSARY TO FOLLOW WALLS AND AVOID
<br />INTERFERENCE WITH OTHER MECHANICAL ITEMS. LOCATE GROUPS OF PIPES PARALLEL TO EACH OTHER;
<br />SPACE THEM AT A DISTANCE TO PERMIT ACCESS FOR SERVICING VALVES.
<br />14 WATER PIPING SHALL BE PITCHED TO POINTS OF DRAINAGE WITH CONSTANT UNIFORM SLOPE,
<br />15 INSTALL HORIZONTAL PIPING AS HIGH AS POSSIBLE WITHOUT SAGS OR HUMPS.
<br />16 GRADE DRAINAGE AT UNIFORM SLOPE OF NOT LESS THAN 1/4" PER FOOT TOWARD THE POINT OF DISPOSAL.
<br />WHEN APPROVED BY ADMINISTRATIVE AUTHORITY, PIPE SIZE 4" AND LARGER MAY HAVE A SLOPE OF NOT LESS
<br />THAN 1/8" PER FOOT.
<br />17 WHERE CHANGES IN PIPE SIZES OCCUR, USE ONLY REDUCING FITTINGS.
<br />18 FOR DRAINAGE PIPING CHANGES IN DIRECTION, USE LONG SWEEP WHERE POSSIBLE, OTHERWISE, SHORT
<br />SWEEP 1/4 BENDS, OR COMBINATION WYE AND 1/8 BENDS; USE SANITARY TEE BRANCHES ONLY FOR
<br />HORIZONTAL BRANCHES DISCHARGING TO STACKS.
<br />19 INSTALL SECTIONALISING VALVES AND ON EACH BRANCH LINE TO MULTI -FIXTURE GROUPS. LOCATE VALVES IN A
<br />READILY ACCESSIBLE LOCATION, DO NOT CONCEAL. DO NOT LOCATE VALVE SYSTEMS BELOW HORIZONTAL UNLESS
<br />INDICATED ON PLANS. LOCATE ANGLE STOP VALVES BELOW THE SINK OR WATER CLOSET,
<br />20 WATER SUPPLY TO ALL FIXTURES AND CONTAINERS SHALL BE SO INSTALLED AS TO PREVENT POSSIBLE
<br />BACK SIPHONAGE OF POLLUTED WATER. ALL SUPPLIES SHALL BE EITHER ABOVE THE FLOOD RIM OF THE
<br />FIXTURE OR SEPARATED FROM THE DRAINAGE END BY MEANS OF AN APPROVED VACUUM BREAKERS.
<br />21 PROVIDE PIPING AND FIXTURE TRAPS. CONNECT TO FIXTURES AND OTHER EQUIPMENT INDICATED OR
<br />SPECIFIED AS REQUIRING SOIL, WASTE, DRAIN AND VENT FACILITIES,
<br />22 LAY ALL PIPING TRUE TO LINE AND GRADE, FIT ENDS TOGETHER, MATCH SO THAT SEWER OR DRAIN WILL
<br />HAVE SMOOTH AND UNIFORM INSERT. FOLLOW LOCATIONS AND ELEVATIONS AT SITE. AS THE PIPE
<br />WORK STOPPAGE PERIODS, RPROVIDE EFPIPE F ECTIVOR OE PLUGS OR DIRT,F CEMENT, AND
<br />FOR EOPEN EDS OFR FOREIGN PIPE SAND DRIP NS.
<br />23 PROVIDE CLEANOUTS WHERE INDICATED AND AT INTERVALS OF 100' OR AS REQUIRED BY LOCAL PLUMBING
<br />CODE AND WHERE REQUIRED AT CHANGES OF DIRECTIONS OF SOIL AND WASTE STACKS. INSTALL
<br />CLEANOUTS SO AS TO BE ACCESSIBLE FOR EASY REMOVAL AND TO PROVIDE CLEARANCE FOR RODDING.
<br />CLEANOUTS SHALL BE THE SAME SIZE AS PIPE SERVED EXCEPT THAT NO CLEANOUT NEED BE LARGER THAN
<br />FOUR INCHES.
<br />24 EXTEND VENT PIPES 12 INCHES ABOVE ROOF AND 1OFT MINIMUM AWAY FROM ANY FRESH AIR INTAKES
<br />AND AT LEAST 48 INCHES AWAY FROM A PARAPET WALL.
<br />25 SANITARY VENT PIPING SHALL BE GRADED SO THAT THE AIRFLOW TO THE OUTSIDE WILL BE CONTINUOUSLY
<br />UPWARD AND SO THAT NO LOW POINTS WILL BE DRAINED.
<br />26 MAKE TIGHT CONNECTION BETWEEN WATER CLOSET FLANGES AND EARTHENWARE FIXTURE BY MEANS OF
<br />AN APPROVED MOLDED WAX RING OR SETTING COMPOUND AND BOLTING.
<br />27 VENTS: PROVIDE FLASHING FOR STACKS PASSING THROUGH ROOF. MAKE WATER -TIGHT AT ROOF. DO NOT
<br />LOCATE VENT THROUGH ROOF LESS THAN 24 INCHES FROM A PARAPET WALL.
<br />28 ALL PLUMBING FIXTURES AND PIPING ARE TO BE LISTED BY AN APPROVED LISTING AND TESTING AGENCY
<br />AND PROPERLY LABELED.
<br />29 COORDINATE ALL LOCATIONS, SIZES, AND ELEVATIONS OF ALL SLEEVES THROUGH WALLS, BEAMS, SLABS AND
<br />FOOTING WITH STRUCTURAL AND ARCHITECTURAL DRAWINGS. ALL PIPES SLEEVING THROUGH FOOTINGS SHALL
<br />HAVE A SLEEVE DIAMETER OF TWO PIPE SIZES OVER THE PIPE PASSING THROUGH THE FOOTING. NO PIPE TO
<br />BE PLACED THROUGH FOOTING UNLESS APPROVED BY THE STRUCTURAL ENGINEER,
<br />30 ALL PIPES SHALL B'E PROTECTED AT THE POINT THEY CROSS BUILDING EXPANSION JOINT,
<br />EITHER WITH AN EXPANSION FITTINGS OR IN ANOTHER MANNER ACCEPTABLE TO THE ENGINEER.
<br />31 PLUMBING CONTRACTOR SHALL CONNECT ALL GAS PIPING TO ALL GAS RELATED UNITS PER PLAN WITH LISTED
<br />AND APPROVED GAS SHUT-OFF VALVE, SEDIMENT TRAP, AND UNION.
<br />32 FAUCET CONTROLS SHALL BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING,
<br />PINCHING, OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER
<br />THAN 5 POUNDS.
<br />33 PENETRATION OF FLOOR/CEILING ASSEMBLIES AND ASSEMBLIES REQUIRED TO HAVE A FIRE -RESISTANCE
<br />RATING SHALL BE PROTECTED IN ACCORDANCE WITH THE BUILDING CODE.
<br />34 WHERE WATER PRESSURE WITHIN A BUILDING EXCEEDS 80 PSI, AN APPROVED WATER -PRESSURE REDUCING
<br />VALVE CONFORMING TO ASSE 1003 WITH STRAINER SHALL BE INSTALLED TO REDUCE THE PRESSURE IN THE
<br />BUILDING WATER DISTRIBUTION PIPING TO 80 PSI STATIC OR LESS.
<br />35 DISINFECTION OF POTABLE WATER SYSTEM SHALL COMPLY WITH THE LOCAL AND THE STATE PLUMBING
<br />CODE,
<br />36 PROPER ACCESS MUST BE PROVIDED FOR THE TESTING AND MAINTENANCE OF THE BACKFLOW PREVENTER.
<br />IF THE BACKFLOW PREVENTER IS INSTALLED MORE THAN 5'-0" ABOVE THE FLOOR, SPECIAL PROVISIONS
<br />MUST BE MADE.
<br />37 PROVIDE AND INSTALL A SINGLE GAS ISOLATION VALVE FOR THE MULTIPLE GAS METER BANKS FOR
<br />THE ENTIRE BLDG.
<br />38 ALL PIPING SHALL MAINTAIN AT LEAST 5'-0" CLEARANCE IN FRONT OF THE HVAC SUPPLY AND RETURN
<br />OPENINGS,
<br />39 PLASTIC PIPES ARE NOT PERMITTED TO BE INSTALLED WITHIN THE AIR PLENUM SPACE.
<br />40 HUNG WASTE PIPING 'SHALL BE STRUCTURALLY SUPPORTED AS TIGHT AS POSSIBLE BELOW THE
<br />STRUCTURAL BEAMS TO GAIN MORE HEAD SPACE AS IT PITCH TOWARDS THE LOWEST POINT TO
<br />KEEP WASTE PIPING WITHIN THE CEILING SPACE.
<br />41 CONTRACTOR TO PROVIDE AND INSTALL QUICK DISCONNECT GAS LINES AT ALL COOKING EQUIPMENT.
<br />42 NO NON-METALLIC PIPING IS ALLOWED WITHIN THE RETURN -AIR PLENUMS.
<br />Abossein
<br />Engineering,
<br />L. Le C
<br />MECHANICAL - ELECTRICAL
<br />CIVIL - LEED
<br />FIRE PROTECTION
<br />18465 NE 68TH ST
<br />REDMOU, INA 98052
<br />PH: (425) 462-9441
<br />FAX: (425) 462-9451
<br />E -Mail: cservice@abossein.corn
<br />www.(ibossein.com
<br />BOSSEIN #218022
<br />CLIENT:
<br />AO&
<br />IF
<br />ARCO
<br />BP WEST COAST PRODUCTS, LLC
<br />18215 72ND AVENUE SOUTH
<br />KENT, WA 98032
<br />(425)251-6222
<br />(425)251-8782 FAX
<br />CML ENGINEERING, LAND PLANNING,
<br />SURVEYING, EWRONMENTAL SERVICES
<br />1�.*.1�3
<br />I�tO!!'Ei
<br />DEVELOPMENT INFORMATIDN:
<br />ARCO NTI
<br />AM/PM
<br />FUEL CANOPY W/ 8 MPD'S
<br />SITE ADDRESS:
<br />NWC CHEROKEE RD
<br />@ NEWTON RD
<br />SAN JOAQUIN COUNTY, CALIFORNIA
<br />FACILITY # TBD
<br />DESIGNED BY
<br />AWANCE Zdd M:
<br />ofou BY
<br />BP M.
<br />DRAWN BY:
<br />AWANCE PAI:
<br />VERSION: _
<br />PROJECT N0:
<br />18068
<br />0-
<br />0-
<br />0-
<br />1�.*.1�3
<br />I�tO!!'Ei
<br />DEVELOPMENT INFORMATIDN:
<br />ARCO NTI
<br />AM/PM
<br />FUEL CANOPY W/ 8 MPD'S
<br />SITE ADDRESS:
<br />NWC CHEROKEE RD
<br />@ NEWTON RD
<br />SAN JOAQUIN COUNTY, CALIFORNIA
<br />FACILITY # TBD
<br />DESIGNED BY
<br />AWANCE Zdd M:
<br />ofou BY
<br />BP M.
<br />DRAWN BY:
<br />AWANCE PAI:
<br />VERSION: _
<br />PROJECT N0:
<br />18068
<br />UKAWNU IIILE:
<br />NOTES,
<br />SCHEDULES
<br />SHEET NO:
<br />P0.2
<br />
|