ELECTRIC WATER HEATER SIZING <br />FIXT. ID <br />QTY <br />DESCRIPTION <br />DEMAND <br />TOTAL <br />LV -1 <br />3 <br />LAVATORY <br />5 GPH <br />15 GPH <br />C16A <br />G7 <br />G9E <br />3 <br />1 <br />1 <br />HANDSINK <br />MOP SINK <br />3 -COMPARTMENT SINK <br />5 GPH <br />15 GPH <br />15 GPH <br />15 GPH <br />PER PDI STANDARD PDI -WH 201 <br />WHA -C <br />45 GPH 45 GPH <br />SUBTOTAL = 90 GPH <br />DEMAND FACTOR: 0.4 <br />HOT WATER DEMAND: 0.4 X 90 GPH - 36 GPH <br />ENERGY INPUT CALCULATIONS: 36 GPH X 0.149 - 5.4 KW <br />MODEL A.O. SMITH, DVE-52-12 <br />RECOVERY RATE 74 GPH @ 1007 TEMPERATURE RISE <br />ELECTRICAL INPUT 12 KW <br />STORAGE 50 GALLONS <br />CAPACITY <br />FIXTURE UNITS CALCULATIONS <br />FIXT IDWATER PIPING WASTE PIPING <br />(ITEM) QTY DESCRIPTION F.U.PER TOTAL TOTAL F.U.PER TOTAL <br />FIXTURE CW F.U. HW F.U. FIXTURE 5S F.U. <br />PLUMBING FIXTURES <br />WC -1 <br />WATER <br />HAMMER <br />ARRESTER <br />3 <br />LAVATORY <br />SCHEDULE <br />MARK <br />MANUFACTURER/ FIXTURE <br />MODEL # <br />UNITS INLET SIZE <br />REMARKS <br />WHA -A <br />PPP SC -500 1-1 <br />1 112" <br />PER PDI STANDARD PDI -WH 201 <br />WHA -B <br />PPP SC -750 12-32 3/4" <br />PER PDI STANDARD PDI -WH 201 <br />WHA -C <br />PPP SC -1000 33-60 <br />1" <br />PER PDI STANDARD PDI ---WH 201 <br />FIXTURE UNITS CALCULATIONS <br />FIXT IDWATER PIPING WASTE PIPING <br />(ITEM) QTY DESCRIPTION F.U.PER TOTAL TOTAL F.U.PER TOTAL <br />FIXTURE CW F.U. HW F.U. FIXTURE 5S F.U. <br />PLUMBING FIXTURES <br />WC -1 <br />3 <br />WATER CLOSET (FLUSH TANK) <br />LV -1 <br />3 <br />LAVATORY <br />A1C <br />1 <br />CAPPUCCINO MACHINE (3 HEADS) <br />A10 <br />2 <br />DUAL SOFT HEAT BREWER <br />B1A <br />2 <br />FROZEN BEVERAGE DISPENSER <br />132A <br />1 <br />FOUNTAIN ICE MAKER (CUBED) <br />132B <br />1 <br />FOUNTAIN ICE MAKER (NUGGET) <br />B12 <br />1 <br />20 -VALVE ICE/BEVERAGE DISPENSER <br />G6 <br />1 <br />ICE MAKER <br />G6C <br />1 <br />ICE MAKER CONDENSER <br />G7 <br />1 <br />MOP SINK <br />G9B <br />1 <br />3 -COMP SINK <br />G9E <br />1 <br />PRE -RINSE FAUCET <br />G16A <br />5 <br />G16 <br />3 <br />HAND SINK <br />G54 <br />1 <br />CARBONATOR <br />FD -1 <br />5 <br />FLOOR DRAIN <br />2 <br />FS -1 <br />4 <br />FLOOR SINK <br />- <br />- <br />_ <br />HB -1 <br />2 <br />HOSE BIBB <br />2. <br />1 <br />0. <br />0. <br />0. <br />0. <br />0. <br />5 <br />5 <br />5 <br />7.5 <br />- <br />4 <br />12 <br />0.5 <br />3 <br />3 <br />1 <br />3 <br />5 <br />0.5 <br />- <br />0.5 <br />0.5 <br />5 <br />1 <br />- <br />0.5 <br />1 <br />5 <br />0.5 <br />- <br />0.5 <br />0.5 <br />3 <br />0.5 <br />- <br />0.5 <br />0.5 <br />0.5 <br />- <br />05 <br />0 5 <br />TOTAL 31 14 51.5 <br />1. WATER SUPPLY FIXTURE UNITS ARE BASED ON UPC, CHAPTER -6 TABLE 6-5. <br />2. DRAINAGE FIXTURE UNITS ARE BASED ON UPC, CHAPTER -7 TABLE 7-3. <br />GENERAL NOTES <br />1 PLUMBING CONTRACT DRAWINGS ARE IN PART DIAGRAMMATIC, COVERING THE SCOPE OF WORK AND <br />GENERAL ARRANGEMENT OF THE EQUIPMENT, PIPING, ETC., AND THE APPROXIMATE SIZE OF EQUIPMENT <br />AND MATERIALS. THE CONTRACTOR SHALL FOLLOW THESE DRAWINGS IN LAYING OUT THE PLUMBING WORK. <br />PLUMBING CONTRACTOR SHALL. CONSULT GENERAL, SPRINKLER, HEATING/VENTILATING/AIR CONDITIONING <br />CONTRACT AND ELECTRICAL DRAWINGS TO FAMILIARIZE HIMSELF WITH THAT WORK AND TO VERIFY THE <br />SPACES IN WHICH THE PLUMBING WORK WILL BE INSTALLED. <br />2 BECAUSE OF THE NATURE AND SCALE OF THE DRAWINGS, CERTAIN BASIC PLUMBING ITEMS SUCH AS <br />UNIONS, FITTINGS, ELBOWS, ETC., MAY NOT BE SHOWN. WHERE SUCH ITEMS ARE REQUIRED BY OTHER <br />SECTIONS OF THE SPECIFICATIONS, OR WHERE THEY ARE REQUIRED BY THE NATURE OF THE WORK OR BY <br />CODES AND REGULATIONS, THEY SHALL BE FURNISHED AND INSTALLED AT NO ADDITIONAL C05T TO THE <br />OWNER. THE DRAWINGS INDICATE GENERAL LOCATIONS OF PIPING, EQUIPMENT, DUCTWORK AND <br />SIMILAR. THE EXACT LOCATION TO BE DETERMINED BY THE CONTRACTOR TO BEST FIT THE LAYOUT OF <br />THE JOB. <br />3 ALL EQUIPMENT SHALL BE TIGHTLY COVERED AND PROTECTED AGAINST DIRT, WATER, AND CHEMICAL OR <br />MECHANICAL INJURY OR THEFT. PLUMBING FIXTURES SHALL BE COVERED WITH HEAVY PAPER COVERINGS <br />AFTER INSTALLATION AND SHALL BE THOROUGHLY CLEANED AFTER COMPLETION OF THE PROJECT. <br />4 ALL MATERIALS SUCH AS VALVES, FITTINGS, PIPING, EQUIPMENT, PUMPS, COILS, ETC., SHALL BE <br />PROPERLY PROTECTED, AND ALL PIPING OPENINGS SHALL BE TEMPORARILY CLOSED CONTRACTOR <br />BY THE CONT <br />FOR THE WORK UNDER HIS CHARGE, ON A DAILY BASIS, AT THE END OF EACH BY <br />DAY, T AS TO <br />PREVENT OBSTRUCTION AND DAMAGE. THE ABOVE REQUIREMENTS ARE MANDATORY. <br />5 THE CONTRAC70R SHALL SEE THAT ALL MATERIALS, INSTALLATION AND WORKMANSHIP IS PERFORMED IN <br />ACCORDANCE WITH THE LATEST EDITION OF ALL APPLICABLE CODES, LAWS, OR ORDINANCES OF THE STATE, <br />AND ALL COUNTY AND LOCAL CITY CODES OR ORDINANCES, INCLUDING ALL STATE OR LOCAL BOARD OF <br />HEALTH, FEDERAL AND STATE ENVIRONMENTAL PROTECTION REGULATIONS, <br />STATE ENERGY CODES AND UTILITY REGULATORY AGENCIES. <br />6 ALL WORK SHALL BE FURTHER PERFORMED IN ACCORDANCE WITH THE NATIONAL BOARD OF FIRE <br />UNDERWRITERS, THE PLUMBING AND BUILDING CODES, NATIONAL ELECTRICAL. CODE, THE <br />OCCUPATIONAL SAFETY AND HEALTH ACT, THE AMERICAN GAS ASSOCIATION, AND ALL SUCH OTHER <br />SPECIFIC CODIES AS MAY BE REFERRED TO IN THE INDIVIDUAL SECTIONS OF THE SPECIFICATIONS. <br />7 PIPE SIZES SHOWN ON THE DRAWINGS ARE THE MINIMUM SIZES ALLOWED REGARDLESS OF THE CODE <br />MINIMUM, EXCEPT WHEN THE CODE MINIMUM SIZE IS LARGER THAN THAT SHOWN. <br />8 THE CONTRACTOR SHALL MAINTAIN A CURRENT SET OF CONTRACT PRINTS ON THE CONSTRUCTION SITE AT <br />ALL TIMES, ON WHICH HE SHALL ACCURATELY RECORD THE ACTUAL INSTALLATION OF ALL PLUMBING WORK. <br />AS WORK PROGRESSES, MARK CHANGES MADE WHETHER RESULTING FROM JOB CONDITIONS, ADDENDA, <br />FORMAL CHANGE ORDERS OR OTHER INSTRUCTIONS ISSUED BY THE ENGINEER, <br />9 THE PLUMBING CONTRACTOR SHALL INDICATE PROGRESS 8Y COLORING IN VARIOUS PIPES, FIXTURES, AND <br />ASSOCIATED APPURTENANCES EXACTLY AS THEY ARE ERECTED AND INSTALLED. <br />10 MARK ALL PIPE SIZES AND LOCATIONS DURING CONSTRUCTION. ALSO, MARK LOCATIONS OF ALL VALVES <br />AND VARIOUS (EQUIPMENT, APPARATUS, AND ASSOCIATED APPURTENANCES AS ERECTED WEEKLY DURING <br />CONSTRUCTION.. <br />11 AT THE COMPLETION OF THE JOB THESE PRINTS, INCORPORATING CHANGES, ADDENDA AND ADDED DATA <br />NOTED ON MARKED -UP PRINTS, INCLUDING DIMENSIONED LOCATIONS OF UNDERGROUND PIPING BEYOND <br />LIMITS OF BUILDING, SHALL BE SUBMITTED TO THE ENGINEER FOR FINAL REVIEW AND COMMENT, THE <br />PRINTS WILL BE RETURNED WITH APPROPRIATE COMMENTS AND RECOMMENDATIONS. THESE CORRECTED <br />PRINTS TOGETHER WITH CORRELATED PRINTS INDICATING ALL THE REVISIONS, ADDITIONS AND DELETIONS <br />OF WORK, SHALL FORM THE BASIS FOR PREPARING A SET OF RECORD DRAWINGS. <br />12 WHERE PIPING, AND OTHER PLUMBING APPURTENANCES PASS THROUGH FIRE PARTITIONS, FIRE WALLS, OR <br />FLOORS, INSTALL A FIRE -STOP THAT PROVIDES AN EFFECTIVE BARRIER AGAINST THE SPREAD OF FIRE, <br />SMOKE AND GASES. FIRE -STOP MATERIAL SHALL BE UL APPROVED, PACKED TIGHT AND COMPLETELY FILL <br />CLEARANCES BETWEEN RACEWAYS AND OPENINGS. FLOOR, EXTERIOR WALL, AND ROOF SEALS SHALL ALSO BE <br />MADE WATERTIGHT AS APPROVED BY THE ADMINISTRATIVE AUTHORITY. <br />13 ARRANGE AND INSTALL PIPING APPROXIMATELY AS INDICATED, STRAIGHT, PLUMB AND AS DIRECT AS <br />POSSIBLE, FORM RIGHT ANGLES OR PARALLEL LINES WITH BUILDING WALLS. KEEP PIPES CLOSE TO <br />WALLS, PARTITIONS AND CEILINGS, OFFSETTING ONLY WHERE NECESSARY TO FOLLOW WALLS AND AVOID <br />INTERFERENCE WITH OTHER MECHANICAL ITEMS. LOCATE GROUPS OF PIPES PARALLEL TO EACH OTHER; <br />SPACE THEM AT A DISTANCE TO PERMIT ACCESS FOR SERVICING VALVES. <br />14 WATER PIPING SHALL BE PITCHED TO POINTS OF DRAINAGE WITH CONSTANT UNIFORM SLOPE, <br />15 INSTALL HORIZONTAL PIPING AS HIGH AS POSSIBLE WITHOUT SAGS OR HUMPS. <br />16 GRADE DRAINAGE AT UNIFORM SLOPE OF NOT LESS THAN 1/4" PER FOOT TOWARD THE POINT OF DISPOSAL. <br />WHEN APPROVED BY ADMINISTRATIVE AUTHORITY, PIPE SIZE 4" AND LARGER MAY HAVE A SLOPE OF NOT LESS <br />THAN 1/8" PER FOOT. <br />17 WHERE CHANGES IN PIPE SIZES OCCUR, USE ONLY REDUCING FITTINGS. <br />18 FOR DRAINAGE PIPING CHANGES IN DIRECTION, USE LONG SWEEP WHERE POSSIBLE, OTHERWISE, SHORT <br />SWEEP 1/4 BENDS, OR COMBINATION WYE AND 1/8 BENDS; USE SANITARY TEE BRANCHES ONLY FOR <br />HORIZONTAL BRANCHES DISCHARGING TO STACKS. <br />19 INSTALL SECTIONALISING VALVES AND ON EACH BRANCH LINE TO MULTI -FIXTURE GROUPS. LOCATE VALVES IN A <br />READILY ACCESSIBLE LOCATION, DO NOT CONCEAL. DO NOT LOCATE VALVE SYSTEMS BELOW HORIZONTAL UNLESS <br />INDICATED ON PLANS. LOCATE ANGLE STOP VALVES BELOW THE SINK OR WATER CLOSET, <br />20 WATER SUPPLY TO ALL FIXTURES AND CONTAINERS SHALL BE SO INSTALLED AS TO PREVENT POSSIBLE <br />BACK SIPHONAGE OF POLLUTED WATER. ALL SUPPLIES SHALL BE EITHER ABOVE THE FLOOD RIM OF THE <br />FIXTURE OR SEPARATED FROM THE DRAINAGE END BY MEANS OF AN APPROVED VACUUM BREAKERS. <br />21 PROVIDE PIPING AND FIXTURE TRAPS. CONNECT TO FIXTURES AND OTHER EQUIPMENT INDICATED OR <br />SPECIFIED AS REQUIRING SOIL, WASTE, DRAIN AND VENT FACILITIES, <br />22 LAY ALL PIPING TRUE TO LINE AND GRADE, FIT ENDS TOGETHER, MATCH SO THAT SEWER OR DRAIN WILL <br />HAVE SMOOTH AND UNIFORM INSERT. FOLLOW LOCATIONS AND ELEVATIONS AT SITE. AS THE PIPE <br />WORK STOPPAGE PERIODS, RPROVIDE EFPIPE F ECTIVOR OE PLUGS OR DIRT,F CEMENT, AND <br />FOR EOPEN EDS OFR FOREIGN PIPE SAND DRIP NS. <br />23 PROVIDE CLEANOUTS WHERE INDICATED AND AT INTERVALS OF 100' OR AS REQUIRED BY LOCAL PLUMBING <br />CODE AND WHERE REQUIRED AT CHANGES OF DIRECTIONS OF SOIL AND WASTE STACKS. INSTALL <br />CLEANOUTS SO AS TO BE ACCESSIBLE FOR EASY REMOVAL AND TO PROVIDE CLEARANCE FOR RODDING. <br />CLEANOUTS SHALL BE THE SAME SIZE AS PIPE SERVED EXCEPT THAT NO CLEANOUT NEED BE LARGER THAN <br />FOUR INCHES. <br />24 EXTEND VENT PIPES 12 INCHES ABOVE ROOF AND 1OFT MINIMUM AWAY FROM ANY FRESH AIR INTAKES <br />AND AT LEAST 48 INCHES AWAY FROM A PARAPET WALL. <br />25 SANITARY VENT PIPING SHALL BE GRADED SO THAT THE AIRFLOW TO THE OUTSIDE WILL BE CONTINUOUSLY <br />UPWARD AND SO THAT NO LOW POINTS WILL BE DRAINED. <br />26 MAKE TIGHT CONNECTION BETWEEN WATER CLOSET FLANGES AND EARTHENWARE FIXTURE BY MEANS OF <br />AN APPROVED MOLDED WAX RING OR SETTING COMPOUND AND BOLTING. <br />27 VENTS: PROVIDE FLASHING FOR STACKS PASSING THROUGH ROOF. MAKE WATER -TIGHT AT ROOF. DO NOT <br />LOCATE VENT THROUGH ROOF LESS THAN 24 INCHES FROM A PARAPET WALL. <br />28 ALL PLUMBING FIXTURES AND PIPING ARE TO BE LISTED BY AN APPROVED LISTING AND TESTING AGENCY <br />AND PROPERLY LABELED. <br />29 COORDINATE ALL LOCATIONS, SIZES, AND ELEVATIONS OF ALL SLEEVES THROUGH WALLS, BEAMS, SLABS AND <br />FOOTING WITH STRUCTURAL AND ARCHITECTURAL DRAWINGS. ALL PIPES SLEEVING THROUGH FOOTINGS SHALL <br />HAVE A SLEEVE DIAMETER OF TWO PIPE SIZES OVER THE PIPE PASSING THROUGH THE FOOTING. NO PIPE TO <br />BE PLACED THROUGH FOOTING UNLESS APPROVED BY THE STRUCTURAL ENGINEER, <br />30 ALL PIPES SHALL B'E PROTECTED AT THE POINT THEY CROSS BUILDING EXPANSION JOINT, <br />EITHER WITH AN EXPANSION FITTINGS OR IN ANOTHER MANNER ACCEPTABLE TO THE ENGINEER. <br />31 PLUMBING CONTRACTOR SHALL CONNECT ALL GAS PIPING TO ALL GAS RELATED UNITS PER PLAN WITH LISTED <br />AND APPROVED GAS SHUT-OFF VALVE, SEDIMENT TRAP, AND UNION. <br />32 FAUCET CONTROLS SHALL BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING, <br />PINCHING, OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER <br />THAN 5 POUNDS. <br />33 PENETRATION OF FLOOR/CEILING ASSEMBLIES AND ASSEMBLIES REQUIRED TO HAVE A FIRE -RESISTANCE <br />RATING SHALL BE PROTECTED IN ACCORDANCE WITH THE BUILDING CODE. <br />34 WHERE WATER PRESSURE WITHIN A BUILDING EXCEEDS 80 PSI, AN APPROVED WATER -PRESSURE REDUCING <br />VALVE CONFORMING TO ASSE 1003 WITH STRAINER SHALL BE INSTALLED TO REDUCE THE PRESSURE IN THE <br />BUILDING WATER DISTRIBUTION PIPING TO 80 PSI STATIC OR LESS. <br />35 DISINFECTION OF POTABLE WATER SYSTEM SHALL COMPLY WITH THE LOCAL AND THE STATE PLUMBING <br />CODE, <br />36 PROPER ACCESS MUST BE PROVIDED FOR THE TESTING AND MAINTENANCE OF THE BACKFLOW PREVENTER. <br />IF THE BACKFLOW PREVENTER IS INSTALLED MORE THAN 5'-0" ABOVE THE FLOOR, SPECIAL PROVISIONS <br />MUST BE MADE. <br />37 PROVIDE AND INSTALL A SINGLE GAS ISOLATION VALVE FOR THE MULTIPLE GAS METER BANKS FOR <br />THE ENTIRE BLDG. <br />38 ALL PIPING SHALL MAINTAIN AT LEAST 5'-0" CLEARANCE IN FRONT OF THE HVAC SUPPLY AND RETURN <br />OPENINGS, <br />39 PLASTIC PIPES ARE NOT PERMITTED TO BE INSTALLED WITHIN THE AIR PLENUM SPACE. <br />40 HUNG WASTE PIPING 'SHALL BE STRUCTURALLY SUPPORTED AS TIGHT AS POSSIBLE BELOW THE <br />STRUCTURAL BEAMS TO GAIN MORE HEAD SPACE AS IT PITCH TOWARDS THE LOWEST POINT TO <br />KEEP WASTE PIPING WITHIN THE CEILING SPACE. <br />41 CONTRACTOR TO PROVIDE AND INSTALL QUICK DISCONNECT GAS LINES AT ALL COOKING EQUIPMENT. <br />42 NO NON-METALLIC PIPING IS ALLOWED WITHIN THE RETURN -AIR PLENUMS. <br />Abossein <br />Engineering, <br />L. Le C <br />MECHANICAL - ELECTRICAL <br />CIVIL - LEED <br />FIRE PROTECTION <br />18465 NE 68TH ST <br />REDMOU, INA 98052 <br />PH: (425) 462-9441 <br />FAX: (425) 462-9451 <br />E -Mail: cservice@abossein.corn <br />www.(ibossein.com <br />BOSSEIN #218022 <br />CLIENT: <br />AO& <br />IF <br />ARCO <br />BP WEST COAST PRODUCTS, LLC <br />18215 72ND AVENUE SOUTH <br />KENT, WA 98032 <br />(425)251-6222 <br />(425)251-8782 FAX <br />CML ENGINEERING, LAND PLANNING, <br />SURVEYING, EWRONMENTAL SERVICES <br />AWANCE Zdd M: <br />ofou BY <br />BP M. <br />DRAWN BY: <br />0.5 <br />0.5 <br />- <br />0.5 <br />0.5 <br />` <br />- <br />- <br />0.5 <br />0.5 <br />0.5 <br />0.5 <br />- <br />- <br />_ <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />3 <br />3 <br />2 <br />6 <br />5 <br />- <br />0.5 <br />0.5 <br />T24 <br />28 <br />2 <br />8 <br />- <br />- <br />_ <br />TOTAL 31 14 51.5 <br />1. WATER SUPPLY FIXTURE UNITS ARE BASED ON UPC, CHAPTER -6 TABLE 6-5. <br />2. DRAINAGE FIXTURE UNITS ARE BASED ON UPC, CHAPTER -7 TABLE 7-3. <br />GENERAL NOTES <br />1 PLUMBING CONTRACT DRAWINGS ARE IN PART DIAGRAMMATIC, COVERING THE SCOPE OF WORK AND <br />GENERAL ARRANGEMENT OF THE EQUIPMENT, PIPING, ETC., AND THE APPROXIMATE SIZE OF EQUIPMENT <br />AND MATERIALS. THE CONTRACTOR SHALL FOLLOW THESE DRAWINGS IN LAYING OUT THE PLUMBING WORK. <br />PLUMBING CONTRACTOR SHALL. CONSULT GENERAL, SPRINKLER, HEATING/VENTILATING/AIR CONDITIONING <br />CONTRACT AND ELECTRICAL DRAWINGS TO FAMILIARIZE HIMSELF WITH THAT WORK AND TO VERIFY THE <br />SPACES IN WHICH THE PLUMBING WORK WILL BE INSTALLED. <br />2 BECAUSE OF THE NATURE AND SCALE OF THE DRAWINGS, CERTAIN BASIC PLUMBING ITEMS SUCH AS <br />UNIONS, FITTINGS, ELBOWS, ETC., MAY NOT BE SHOWN. WHERE SUCH ITEMS ARE REQUIRED BY OTHER <br />SECTIONS OF THE SPECIFICATIONS, OR WHERE THEY ARE REQUIRED BY THE NATURE OF THE WORK OR BY <br />CODES AND REGULATIONS, THEY SHALL BE FURNISHED AND INSTALLED AT NO ADDITIONAL C05T TO THE <br />OWNER. THE DRAWINGS INDICATE GENERAL LOCATIONS OF PIPING, EQUIPMENT, DUCTWORK AND <br />SIMILAR. THE EXACT LOCATION TO BE DETERMINED BY THE CONTRACTOR TO BEST FIT THE LAYOUT OF <br />THE JOB. <br />3 ALL EQUIPMENT SHALL BE TIGHTLY COVERED AND PROTECTED AGAINST DIRT, WATER, AND CHEMICAL OR <br />MECHANICAL INJURY OR THEFT. PLUMBING FIXTURES SHALL BE COVERED WITH HEAVY PAPER COVERINGS <br />AFTER INSTALLATION AND SHALL BE THOROUGHLY CLEANED AFTER COMPLETION OF THE PROJECT. <br />4 ALL MATERIALS SUCH AS VALVES, FITTINGS, PIPING, EQUIPMENT, PUMPS, COILS, ETC., SHALL BE <br />PROPERLY PROTECTED, AND ALL PIPING OPENINGS SHALL BE TEMPORARILY CLOSED CONTRACTOR <br />BY THE CONT <br />FOR THE WORK UNDER HIS CHARGE, ON A DAILY BASIS, AT THE END OF EACH BY <br />DAY, T AS TO <br />PREVENT OBSTRUCTION AND DAMAGE. THE ABOVE REQUIREMENTS ARE MANDATORY. <br />5 THE CONTRAC70R SHALL SEE THAT ALL MATERIALS, INSTALLATION AND WORKMANSHIP IS PERFORMED IN <br />ACCORDANCE WITH THE LATEST EDITION OF ALL APPLICABLE CODES, LAWS, OR ORDINANCES OF THE STATE, <br />AND ALL COUNTY AND LOCAL CITY CODES OR ORDINANCES, INCLUDING ALL STATE OR LOCAL BOARD OF <br />HEALTH, FEDERAL AND STATE ENVIRONMENTAL PROTECTION REGULATIONS, <br />STATE ENERGY CODES AND UTILITY REGULATORY AGENCIES. <br />6 ALL WORK SHALL BE FURTHER PERFORMED IN ACCORDANCE WITH THE NATIONAL BOARD OF FIRE <br />UNDERWRITERS, THE PLUMBING AND BUILDING CODES, NATIONAL ELECTRICAL. CODE, THE <br />OCCUPATIONAL SAFETY AND HEALTH ACT, THE AMERICAN GAS ASSOCIATION, AND ALL SUCH OTHER <br />SPECIFIC CODIES AS MAY BE REFERRED TO IN THE INDIVIDUAL SECTIONS OF THE SPECIFICATIONS. <br />7 PIPE SIZES SHOWN ON THE DRAWINGS ARE THE MINIMUM SIZES ALLOWED REGARDLESS OF THE CODE <br />MINIMUM, EXCEPT WHEN THE CODE MINIMUM SIZE IS LARGER THAN THAT SHOWN. <br />8 THE CONTRACTOR SHALL MAINTAIN A CURRENT SET OF CONTRACT PRINTS ON THE CONSTRUCTION SITE AT <br />ALL TIMES, ON WHICH HE SHALL ACCURATELY RECORD THE ACTUAL INSTALLATION OF ALL PLUMBING WORK. <br />AS WORK PROGRESSES, MARK CHANGES MADE WHETHER RESULTING FROM JOB CONDITIONS, ADDENDA, <br />FORMAL CHANGE ORDERS OR OTHER INSTRUCTIONS ISSUED BY THE ENGINEER, <br />9 THE PLUMBING CONTRACTOR SHALL INDICATE PROGRESS 8Y COLORING IN VARIOUS PIPES, FIXTURES, AND <br />ASSOCIATED APPURTENANCES EXACTLY AS THEY ARE ERECTED AND INSTALLED. <br />10 MARK ALL PIPE SIZES AND LOCATIONS DURING CONSTRUCTION. ALSO, MARK LOCATIONS OF ALL VALVES <br />AND VARIOUS (EQUIPMENT, APPARATUS, AND ASSOCIATED APPURTENANCES AS ERECTED WEEKLY DURING <br />CONSTRUCTION.. <br />11 AT THE COMPLETION OF THE JOB THESE PRINTS, INCORPORATING CHANGES, ADDENDA AND ADDED DATA <br />NOTED ON MARKED -UP PRINTS, INCLUDING DIMENSIONED LOCATIONS OF UNDERGROUND PIPING BEYOND <br />LIMITS OF BUILDING, SHALL BE SUBMITTED TO THE ENGINEER FOR FINAL REVIEW AND COMMENT, THE <br />PRINTS WILL BE RETURNED WITH APPROPRIATE COMMENTS AND RECOMMENDATIONS. THESE CORRECTED <br />PRINTS TOGETHER WITH CORRELATED PRINTS INDICATING ALL THE REVISIONS, ADDITIONS AND DELETIONS <br />OF WORK, SHALL FORM THE BASIS FOR PREPARING A SET OF RECORD DRAWINGS. <br />12 WHERE PIPING, AND OTHER PLUMBING APPURTENANCES PASS THROUGH FIRE PARTITIONS, FIRE WALLS, OR <br />FLOORS, INSTALL A FIRE -STOP THAT PROVIDES AN EFFECTIVE BARRIER AGAINST THE SPREAD OF FIRE, <br />SMOKE AND GASES. FIRE -STOP MATERIAL SHALL BE UL APPROVED, PACKED TIGHT AND COMPLETELY FILL <br />CLEARANCES BETWEEN RACEWAYS AND OPENINGS. FLOOR, EXTERIOR WALL, AND ROOF SEALS SHALL ALSO BE <br />MADE WATERTIGHT AS APPROVED BY THE ADMINISTRATIVE AUTHORITY. <br />13 ARRANGE AND INSTALL PIPING APPROXIMATELY AS INDICATED, STRAIGHT, PLUMB AND AS DIRECT AS <br />POSSIBLE, FORM RIGHT ANGLES OR PARALLEL LINES WITH BUILDING WALLS. KEEP PIPES CLOSE TO <br />WALLS, PARTITIONS AND CEILINGS, OFFSETTING ONLY WHERE NECESSARY TO FOLLOW WALLS AND AVOID <br />INTERFERENCE WITH OTHER MECHANICAL ITEMS. LOCATE GROUPS OF PIPES PARALLEL TO EACH OTHER; <br />SPACE THEM AT A DISTANCE TO PERMIT ACCESS FOR SERVICING VALVES. <br />14 WATER PIPING SHALL BE PITCHED TO POINTS OF DRAINAGE WITH CONSTANT UNIFORM SLOPE, <br />15 INSTALL HORIZONTAL PIPING AS HIGH AS POSSIBLE WITHOUT SAGS OR HUMPS. <br />16 GRADE DRAINAGE AT UNIFORM SLOPE OF NOT LESS THAN 1/4" PER FOOT TOWARD THE POINT OF DISPOSAL. <br />WHEN APPROVED BY ADMINISTRATIVE AUTHORITY, PIPE SIZE 4" AND LARGER MAY HAVE A SLOPE OF NOT LESS <br />THAN 1/8" PER FOOT. <br />17 WHERE CHANGES IN PIPE SIZES OCCUR, USE ONLY REDUCING FITTINGS. <br />18 FOR DRAINAGE PIPING CHANGES IN DIRECTION, USE LONG SWEEP WHERE POSSIBLE, OTHERWISE, SHORT <br />SWEEP 1/4 BENDS, OR COMBINATION WYE AND 1/8 BENDS; USE SANITARY TEE BRANCHES ONLY FOR <br />HORIZONTAL BRANCHES DISCHARGING TO STACKS. <br />19 INSTALL SECTIONALISING VALVES AND ON EACH BRANCH LINE TO MULTI -FIXTURE GROUPS. LOCATE VALVES IN A <br />READILY ACCESSIBLE LOCATION, DO NOT CONCEAL. DO NOT LOCATE VALVE SYSTEMS BELOW HORIZONTAL UNLESS <br />INDICATED ON PLANS. LOCATE ANGLE STOP VALVES BELOW THE SINK OR WATER CLOSET, <br />20 WATER SUPPLY TO ALL FIXTURES AND CONTAINERS SHALL BE SO INSTALLED AS TO PREVENT POSSIBLE <br />BACK SIPHONAGE OF POLLUTED WATER. ALL SUPPLIES SHALL BE EITHER ABOVE THE FLOOD RIM OF THE <br />FIXTURE OR SEPARATED FROM THE DRAINAGE END BY MEANS OF AN APPROVED VACUUM BREAKERS. <br />21 PROVIDE PIPING AND FIXTURE TRAPS. CONNECT TO FIXTURES AND OTHER EQUIPMENT INDICATED OR <br />SPECIFIED AS REQUIRING SOIL, WASTE, DRAIN AND VENT FACILITIES, <br />22 LAY ALL PIPING TRUE TO LINE AND GRADE, FIT ENDS TOGETHER, MATCH SO THAT SEWER OR DRAIN WILL <br />HAVE SMOOTH AND UNIFORM INSERT. FOLLOW LOCATIONS AND ELEVATIONS AT SITE. AS THE PIPE <br />WORK STOPPAGE PERIODS, RPROVIDE EFPIPE F ECTIVOR OE PLUGS OR DIRT,F CEMENT, AND <br />FOR EOPEN EDS OFR FOREIGN PIPE SAND DRIP NS. <br />23 PROVIDE CLEANOUTS WHERE INDICATED AND AT INTERVALS OF 100' OR AS REQUIRED BY LOCAL PLUMBING <br />CODE AND WHERE REQUIRED AT CHANGES OF DIRECTIONS OF SOIL AND WASTE STACKS. INSTALL <br />CLEANOUTS SO AS TO BE ACCESSIBLE FOR EASY REMOVAL AND TO PROVIDE CLEARANCE FOR RODDING. <br />CLEANOUTS SHALL BE THE SAME SIZE AS PIPE SERVED EXCEPT THAT NO CLEANOUT NEED BE LARGER THAN <br />FOUR INCHES. <br />24 EXTEND VENT PIPES 12 INCHES ABOVE ROOF AND 1OFT MINIMUM AWAY FROM ANY FRESH AIR INTAKES <br />AND AT LEAST 48 INCHES AWAY FROM A PARAPET WALL. <br />25 SANITARY VENT PIPING SHALL BE GRADED SO THAT THE AIRFLOW TO THE OUTSIDE WILL BE CONTINUOUSLY <br />UPWARD AND SO THAT NO LOW POINTS WILL BE DRAINED. <br />26 MAKE TIGHT CONNECTION BETWEEN WATER CLOSET FLANGES AND EARTHENWARE FIXTURE BY MEANS OF <br />AN APPROVED MOLDED WAX RING OR SETTING COMPOUND AND BOLTING. <br />27 VENTS: PROVIDE FLASHING FOR STACKS PASSING THROUGH ROOF. MAKE WATER -TIGHT AT ROOF. DO NOT <br />LOCATE VENT THROUGH ROOF LESS THAN 24 INCHES FROM A PARAPET WALL. <br />28 ALL PLUMBING FIXTURES AND PIPING ARE TO BE LISTED BY AN APPROVED LISTING AND TESTING AGENCY <br />AND PROPERLY LABELED. <br />29 COORDINATE ALL LOCATIONS, SIZES, AND ELEVATIONS OF ALL SLEEVES THROUGH WALLS, BEAMS, SLABS AND <br />FOOTING WITH STRUCTURAL AND ARCHITECTURAL DRAWINGS. ALL PIPES SLEEVING THROUGH FOOTINGS SHALL <br />HAVE A SLEEVE DIAMETER OF TWO PIPE SIZES OVER THE PIPE PASSING THROUGH THE FOOTING. NO PIPE TO <br />BE PLACED THROUGH FOOTING UNLESS APPROVED BY THE STRUCTURAL ENGINEER, <br />30 ALL PIPES SHALL B'E PROTECTED AT THE POINT THEY CROSS BUILDING EXPANSION JOINT, <br />EITHER WITH AN EXPANSION FITTINGS OR IN ANOTHER MANNER ACCEPTABLE TO THE ENGINEER. <br />31 PLUMBING CONTRACTOR SHALL CONNECT ALL GAS PIPING TO ALL GAS RELATED UNITS PER PLAN WITH LISTED <br />AND APPROVED GAS SHUT-OFF VALVE, SEDIMENT TRAP, AND UNION. <br />32 FAUCET CONTROLS SHALL BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING, <br />PINCHING, OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER <br />THAN 5 POUNDS. <br />33 PENETRATION OF FLOOR/CEILING ASSEMBLIES AND ASSEMBLIES REQUIRED TO HAVE A FIRE -RESISTANCE <br />RATING SHALL BE PROTECTED IN ACCORDANCE WITH THE BUILDING CODE. <br />34 WHERE WATER PRESSURE WITHIN A BUILDING EXCEEDS 80 PSI, AN APPROVED WATER -PRESSURE REDUCING <br />VALVE CONFORMING TO ASSE 1003 WITH STRAINER SHALL BE INSTALLED TO REDUCE THE PRESSURE IN THE <br />BUILDING WATER DISTRIBUTION PIPING TO 80 PSI STATIC OR LESS. <br />35 DISINFECTION OF POTABLE WATER SYSTEM SHALL COMPLY WITH THE LOCAL AND THE STATE PLUMBING <br />CODE, <br />36 PROPER ACCESS MUST BE PROVIDED FOR THE TESTING AND MAINTENANCE OF THE BACKFLOW PREVENTER. <br />IF THE BACKFLOW PREVENTER IS INSTALLED MORE THAN 5'-0" ABOVE THE FLOOR, SPECIAL PROVISIONS <br />MUST BE MADE. <br />37 PROVIDE AND INSTALL A SINGLE GAS ISOLATION VALVE FOR THE MULTIPLE GAS METER BANKS FOR <br />THE ENTIRE BLDG. <br />38 ALL PIPING SHALL MAINTAIN AT LEAST 5'-0" CLEARANCE IN FRONT OF THE HVAC SUPPLY AND RETURN <br />OPENINGS, <br />39 PLASTIC PIPES ARE NOT PERMITTED TO BE INSTALLED WITHIN THE AIR PLENUM SPACE. <br />40 HUNG WASTE PIPING 'SHALL BE STRUCTURALLY SUPPORTED AS TIGHT AS POSSIBLE BELOW THE <br />STRUCTURAL BEAMS TO GAIN MORE HEAD SPACE AS IT PITCH TOWARDS THE LOWEST POINT TO <br />KEEP WASTE PIPING WITHIN THE CEILING SPACE. <br />41 CONTRACTOR TO PROVIDE AND INSTALL QUICK DISCONNECT GAS LINES AT ALL COOKING EQUIPMENT. <br />42 NO NON-METALLIC PIPING IS ALLOWED WITHIN THE RETURN -AIR PLENUMS. <br />Abossein <br />Engineering, <br />L. Le C <br />MECHANICAL - ELECTRICAL <br />CIVIL - LEED <br />FIRE PROTECTION <br />18465 NE 68TH ST <br />REDMOU, INA 98052 <br />PH: (425) 462-9441 <br />FAX: (425) 462-9451 <br />E -Mail: cservice@abossein.corn <br />www.(ibossein.com <br />BOSSEIN #218022 <br />CLIENT: <br />AO& <br />IF <br />ARCO <br />BP WEST COAST PRODUCTS, LLC <br />18215 72ND AVENUE SOUTH <br />KENT, WA 98032 <br />(425)251-6222 <br />(425)251-8782 FAX <br />CML ENGINEERING, LAND PLANNING, <br />SURVEYING, EWRONMENTAL SERVICES <br />1�.*.1�3 <br />I�tO!!'Ei <br />DEVELOPMENT INFORMATIDN: <br />ARCO NTI <br />AM/PM <br />FUEL CANOPY W/ 8 MPD'S <br />SITE ADDRESS: <br />NWC CHEROKEE RD <br />@ NEWTON RD <br />SAN JOAQUIN COUNTY, CALIFORNIA <br />FACILITY # TBD <br />DESIGNED BY <br />AWANCE Zdd M: <br />ofou BY <br />BP M. <br />DRAWN BY: <br />AWANCE PAI: <br />VERSION: _ <br />PROJECT N0: <br />18068 <br />0- <br />0- <br />0- <br />1�.*.1�3 <br />I�tO!!'Ei <br />DEVELOPMENT INFORMATIDN: <br />ARCO NTI <br />AM/PM <br />FUEL CANOPY W/ 8 MPD'S <br />SITE ADDRESS: <br />NWC CHEROKEE RD <br />@ NEWTON RD <br />SAN JOAQUIN COUNTY, CALIFORNIA <br />FACILITY # TBD <br />DESIGNED BY <br />AWANCE Zdd M: <br />ofou BY <br />BP M. <br />DRAWN BY: <br />AWANCE PAI: <br />VERSION: _ <br />PROJECT N0: <br />18068 <br />UKAWNU IIILE: <br />NOTES, <br />SCHEDULES <br />SHEET NO: <br />P0.2 <br />