My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 10:41:34 PM
Creation date
2/27/2020 3:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM DRAWING INFORMATION <br /> 1. ____ Three complete sets of plans(include manufacturer's specification sheets for proposed equipment to be <br /> installed). <br /> 2. ____ Plans drawn to scale in non-erasable print. <br /> 3. ____ Plot plan to show location of tanks and all associated piping. <br /> 4. ____ Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. ____ Tank cross-sectional diagram. <br /> 6. ____ Detail of tank,associated piping,excavation and cover. <br /> 7. ____ Tank(s)and piping approved by a nationally recognized independent testing organization. [Title 23,Chapter 16, <br /> Article 3, Section 2631 (b)&2635] <br /> 8. ____ Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s),epoxy or silicone glues,etc. <br /> 9. ____ Manufacturer's written installation instructions fortank(s), piping, monitoring devices,etc. <br /> 10. ____ At the installation site, prior to installation, a tightness test shall be performed on both primary(1)and secondary <br /> (20)containment systems before covering. [Section 2635(a)(3)&(4)] <br /> 11. ____ Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to EHD from the testing company or owner of facility. [Health&Safety Code,Division 20, <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK# ,9# n # # # # <br /> CAPACITY �Tf DU V <br /> COMPOSITION <br /> PR DUCT <br /> T / <br /> CORROSION <br /> 3 13/,6 <br /> COMPATIBILITY J/�5 �6_5 WITH 100% Ilf <br /> 13. TANK(s)TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings, composites,or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> B. Fiberglass <br /> _ (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular(primary tank pressure test). <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.