Laserfiche WebLink
FUEL SYSTEM NOTES <br /> w <br /> 1. THE CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS AND VERIFY ALL SITE WORK TO a <br /> I BE DONE BEFORE COMMENCING WORK. IF SITE CONDITIONS OR DIMENSIONS DISAGREE WITH Q <br /> I ' INFORMATION ON DRAWINGS OR CONFLICTS OCCUR, THE CONTRACTOR SHALL N011FY THE <br /> OWNER REPRESENTATIVE BEFORE PROCEEDING WITH ANY WORK. <br /> 2. PIPING SHOWN SCHEMATICALLY. CONTRACTOR SHALL INSTALL PIPING PER FIELD CONDITIONS G LL <br /> cc WITH OWNER REPRESENTATIVE'S APPROVAL, N M o E <br /> cc 3. ANY UNDERGROUND UTILITIES CROSSING SITE SHALL.NOT CROSS OVER/UNDER PRODUCT, $ °? N � v <br /> C4NVENIENCE I Ill VAPOR OR VENT PIPING. IF A CONFLICT IS ANTICIPATED NOTIFY OWNER REPRESENTATIVE <br /> PRIOR TO COMMENCEMENT OF WORK -4. ALL o t <br /> 5. USE 3"VAPOR RECOVERY PUCT, VENT AND IPING ALPOR LRN UNES THEWAY BACKLTOLOPE REGUILAR UNLEADED UPWARD FROM TANK. �O D ro N <br /> 6. UOUID SUMP SENSORS SHALL BE WIRED FOR COMPLETE TURBINE AND DISPENSER SHUT-DOWN c g m m <br /> ' - - WHEN A LEAK IS DETECTED, OR WHEN THE MONITORING SYSTEM FAILS OR IS DISCONNECTED, t m m <br /> 7. TANK CONSTRUCTION/TESIING SHALL BE IN ACCORDANCE WITH NATIONALLY RECOGNIZED CODES. <br /> TANKS SHALL BE INSTALLED AS PER MANUFACTURERS SPECIFICATONS, NEW PIPING SHALL BE ,01� <br /> ---- -' INSTALLED PER MANUFACTURERS SPECIFICATIONS. THE UNDERGROUND STORAGE TANK SYSTEM H .'c <br /> ALL PIPING, COUPLINGS, SEALANTS, ETC. SHALL BE COMPATIBLE WITH EACH OTHER AND WITH Q1 : rM. m L6 <br /> ------ --- - -- -- I THE PRODUCT TO BE STORED. <br /> F4 <br /> -- k - <br /> V VENT R15ER5 r� <br /> RECE55ED EMERGENCY <br /> RUMP SNUT-OFF =0 <br /> v <br /> n" SES/ARCy'' <br /> Lol <br /> 248Ly <br /> 10 <br /> 04/30/03 <br /> DATE <br /> —\ <br /> U 3 NO FILTER REVISIONS <br /> / F 3 TYP OF 2 REV# DATE COMMENTS <br /> i <br /> 09/2542 Planning Commission Heanog <br /> 1/ 12/19103 Revmd Per Health Dept Comments <br /> REGULAR (0 <br /> 20,000 j T NAIL 1 <br /> u GALLON I < S <br /> MULTI-PRODUCT DISPENSER I <br /> W/(0 ONE NOZZLE EACH LINE OF FUELING _ <br /> SIDE, TYPr9E�G CANOPY — O� I <br /> N <br /> IL JI u — TYP. OF 2 u <br /> I \ / TYP. OF 2 `V <br /> I � <br /> b '' II '' <br /> —_ TYP. F4 TYP. OF 6 F4 W <br /> I I <br /> I I I O <br /> tilt <br /> 00 <br /> I <br /> j u j u u I 5UPREME z <br /> 15000 <br /> I I GALLON <br /> I I <br /> jam\ <br /> _-� 5 TYP. ! V• <br /> I F4 <br /> - - - - - - _� - - < - - - - - -- - -�- (y V <br /> U U 0 <br /> X3111 <br /> 6 TYP. w <br /> luF4 <br /> NORTH Q <br /> FEET •� <br /> ® ® GRAPHIC SCALE `v <br /> Z V <br /> FUEL PIPING LEGEND s <br /> ------ REGULAR UNLEADED PRODUCT, DOUBLE WALL (HARD PIPE) <br /> O 'v SUPREME PRODUCT, DOUBLE WALL (HARD PIPE) i <br /> - --- VENT, DOUBLE:'NALL F.R.P., SLOPE TOWARD TANKSVA - - - VAPOR, DOUBWALL F.R.P., FUEL sysTEMSITEPIAN <br /> . SLOPE TOWAREGULAR UNLEADED TANK <br /> R = 2210.2 '� A = 2d 54' 210'1 L - 112.09' 21 .23' _ ���, 2 DCI PROJECT NUMBER A61-026.03 <br /> N 89d ' 00" W DRAWN: JMILS CHECKED OT <br /> ((,,JJ 1f 1/ 'J DATE: 0510143 APPROVED: JA <br /> SCALE: ASNOTED <br /> GRANT L. lNF_ ROAD <br /> FUEL SYSTEM 5ITE PLAN Fml A <br /> SCALE 1/8" = I'-O" <br /> SHEETNUMBER <br />