My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1444
>
2900 - Site Mitigation Program
>
PR0527031
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 10:51:19 AM
Creation date
2/28/2020 8:36:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0527031
PE
2957
FACILITY_ID
FA0018318
FACILITY_NAME
FORMER COLUMBO / TOSCANA BAKERY
STREET_NUMBER
1444
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16503005
CURRENT_STATUS
01
SITE_LOCATION
1444 S LINCOLN ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EDMUND G. BRUwM1 JR. <br /> 1\ lsW,al GUVERNOP <br /> MATTHEW RODRIOUE, <br /> 6EDRETARY GOR <br /> WaterBoards FNVIRDNMFNTAI RPnif r.TION <br /> Central Valley Regional Water Quality Control Board <br /> V ED <br /> Ben Terry APR 223 April 2013 <br /> Chevron Environmental Management 5 2013 <br /> 6111 Bollinger Canyon Road, Rm. 3652 ENVROONMENTALHF <br /> San Ramon, CA 94583 PEF;m� �-RyIC_S/8r ES <br /> DOCUMENT REVIEW FOR COMMINGLED PLUME ACCOUNT CP0057 SITES AT <br /> 440 (TEXACO— SHELL, RB #390268)/441 (ARCO, RB #390657)/508 (CHEVRON, <br /> RB #390876) W. CHARTER WAYAND 1444 S. LINCOLN STREET, (COLUMBO/TOSCANA <br /> BAKERY, RB #390825) STOCKTON, SAN JOAQUIN COUNTY <br /> I reviewed the Remedial System Installation and Startup Report (Report), received <br /> 15 April 2013 from Stantec, the lead consultant for the above sites. The Report documented the <br /> installation and intermittent startup of the full scale Soil Vapor Extraction (SVE) and Air Sparging <br /> (AS) system from 1 October 2012 through 14 March 2013 at the Chevron facility. Five (5) <br /> additional SVE wells (VE-2 through VE-6) and ten (10) additional AS wells (AS-3 through <br /> AS-12) were installed during October 2012. The piping and treatment system <br /> compound/module were installed between 19 November 2012 and 15 February 2013. <br /> The paper copy of the Report also included a CD-ROM of the detailed Operations and <br /> Maintenance Manual for the SVE/AS treatment system startup, running, and restart protocols; <br /> the Health and Safety Plan (Stantec and subcontractors); the As-Built Plans for the construction <br /> of the SVE/AS system; the Manufacturer's Specification Sheets; and the Well Logs. The Report <br /> stopped on 14 March 2013 at the required shutdown required after the initial soil vapor <br /> treatment system effluent sampling for the San Joaquin Valley Air Pollution Control District <br /> permit. The Report stated the first three monthly status reports, which are due 15 May 2013, <br /> 15 June 2013, and 15 July 2013, will provide details of the continuous operations and the <br /> optimization of the SVE/AS system. Subsequent semi-annual monitoring reports and quarterly <br /> status reports will continue reporting the operation of the SVE/AS treatment system, including <br /> the petroleum hydrocarbons mass removed per quarter. <br /> Please include the SVE/AS system information for the period of 15 March to 31 March 2013 in <br /> the next monthly status report. You may also include the 15 July 2013 status report in the <br /> 30 July 2013 monitoring report. If you have any questions, you can contact me at <br /> (9 ) 464-4615 or I can be reached by e-mail at 'barton(d-)waterboards.ca.gov. <br /> 'James L.L. Barton, P.G. <br /> Engineering Geologist <br /> cc: See CP0057 Distribution List <br /> KARL E. LONGLEY SCD, P.E.. CHAIR I PAMELA C. CREEDON P.E.. BCEE. EXECUTIVE OFFICER <br /> 11020 Sur Center Drive#200.Rancno Cordova.CA 95670 I wwwwaterboares ca gov/centralvaRey <br /> tJ ncvciu rArn <br />
The URL can be used to link to this page
Your browser does not support the video tag.